In the buildings of many big cities in China, steel structure engineering is more common, such as the Bird's Nest in Beijing. Now many factories are also steel structures, which involves the problem of engineering quantity. What are the engineering quantity calculation methods for steel structure factories? For this professional problem, Bian Xiao also racked his brains to collect some information, so that we can have a preliminary understanding.
1. The quantity of steel structure workshop is calculated according to components (beams, columns, purlins, supports, etc.). ). When using section steel, it should be calculated according to the design size of the component × theoretical weight. If it is a steel plate, it shall be calculated according to the maximum dimension of the outer frame × the area calculated by the theoretical weight of the steel plate. For connecting plates and reinforcing plates, the attached members are merged (if they are attached to beams, they are merged into beams and if they are attached to columns, they are merged into columns).
2. For the bolts in the steel structure workshop, if they are permanent bolts (i.e. bolts connected by bolts), they shall be calculated separately according to the specifications, and only the main materials shall be calculated. The bolts for installation (bolts for temporary fixation during production) do not need to be calculated separately, because the safety quota of components has been considered.
3. First calculate the length of each material, then calculate its theoretical weight and multiply it by meters. If the steel plate adopts thickness * length * width *7.85, the weight can be calculated. The general theoretical weight can be found in hardware manuals and some steel structure design manuals, as well as the theoretical weight of common materials of steel structures.
4. Calculation method of steel structure workshop
(1) the unit of quantity of steel structure is tons, and the simplest method is to multiply the volume by the specific gravity.
(2) For example, H-beam can be divided into upper wing plate, lower wing plate and web plate. Other gusset plates, tie-bar plates, bracing plates, stiffening plates and connecting plates can be multiplied by volume and then multiplied by quantity.
Struts and tie bars can be counted as cylinders and rings.
(3) Purlins, gutters, hemming and flashing can be expanded into plates to calculate the volume, and then converted into tonnage.
(4) The roof panel depends on the place. In some places, the area is used to represent the engineering quantity, and in some places, the tonnage is used to represent the project. Just calculate the corresponding tonnage or area according to the model.
⑤ Number of groups of high-strength bolts, directly count the number of single rows multiplied by the number of rows.
Steel structure is a structure made of hot rolled steel or cold-formed thin-walled steel, such as steel plate, angle steel, channel steel, steel tube and round steel. Steel structure has the advantages of high material strength, light weight, safety, reliability and simple manufacture. In building construction, it is mainly used in factories, high-rise buildings and long-span buildings. Common steel structure members include roof truss, purlin beam, column and support system.
The above small series talked about some calculation methods of engineering quantity of steel structure workshop, which may not be comprehensive, but it is more practical. In fact, the most basic thing to calculate the engineering quantity of steel structure workshop is to understand the drawings, calculate the volume and weight of the main materials of the workshop respectively according to the drawings, and then adjust them according to the actual situation. For more relevant knowledge, please consult Shaanxi lawyers.
Extended reading:
What are the examples of construction organization design of steel structure engineering?
How to write the purchase and sale contract of cement and steel? Do you have a template?
What is the process of signing a steel sales contract?