Current location - Education and Training Encyclopedia - Resume - Power resume
Power resume
Super resume template

The process of perfecting electric power resume is also a process of highlighting its own advantages. You can focus on your own advantages in job hunting by aiming at your job hunting intention.

Article 1: resume template

personal information

Current residence: Guangzhou Nationality: Han nationality

Household registration location: Zhanjiang Body type: 176 cm 72 kg.

Marital status: unmarried age: 25 years old

Training certification: integrity badge:

Talent type: general job hunting

Application position: construction/real estate/property management: electromechanical engineer, electric power and electricity: electric power, electrical design, supervision engineer.

Working years: 3 titles: no titles.

Job Type: Full-time Availability Date: Anytime

Monthly salary requirements: 5000-8000. I hope to work in Guangzhou, Guangzhou, Guangzhou.

Personal work experience: Company name: Wanling Industry (Guangdong) Co., Ltd. Entry date: April 2008 ~

Company nature: wholly foreign-owned industries: real estate, construction, installation and decoration.

Position: mechanical and electrical engineer

Job description: In Wanlinghui project, I am mainly responsible for elevator engineering, generator and window opener engineering, and make a good construction schedule plan; Track the progress of the project; Coordinating all links requires the cooperation of various professions; All aspects should coordinate and communicate with other majors; In terms of engineering changes, the reasons and quantity of changes shall be determined.

Reason for leaving:

Company name: Hitachi Elevator (China) Co., Ltd. Commencement date: June 2006 ~ March 2008.

Company nature: Sino-foreign joint venture industries: mechanical and electrical equipment, electric power and power.

Position: engineering and technical personnel of electrical design department

Job description: 1, proofreading of non-standard foundation design of vertical elevator, need to communicate and coordinate with relevant departments.

2, the design of non-standard elevator parts or functions, especially to communicate with the mechanical design department, cooperate with each other.

3. Set the functional specifications of all domestic vertical elevators according to the contract. This link should always be closely linked with the control cabinet production line. Because each control cabinet must be inspected before leaving the factory, the function realization is related to the specification table.

4, vertical elevator non-standard foundation design review. This link further ensures the accuracy of the basic design book, and reduces the unqualified rate of the design as much as possible, so as not to cause production waste and engineering waste, thus increasing the extra cost.

5. Bad feedback sheet. When the design data reaches the production link, when problems are found, there will be bad feedback sheets, which will have a wide impact. There are data management departments, design departments and quality and environmental protection departments; If problems are found in the engineering link, involving warehouse, logistics and engineering; All different bad feedback should be dealt with specifically.

6. Lead new colleagues to proofread basic design books. How to do it when it is not standard, what is the whole process, and what aspects of the elevator will be involved in this non-standard Different non-standard coping styles are different, such as: after your own judgment, whether it is hardware non-standard or only software non-standard; Or both software and hardware; Whether other departments are involved. Different situations are handled differently.

Reason for leaving:

Company name: Ruiying Intelligent System Co., Ltd. Commencement date: 2004-09 ~

Company nature: private enterprise industry: electrical appliances, electronics, communication equipment.

Position: Part-time.

Job description: Install access control, attendance and monitoring in the factories and office buildings that have been put into use. According to the manufacturer's requirements, wiring is carried out according to the actual situation, and the positions of each control box, power box, card reader and camera are arranged. During the construction, ensure safety and civilization, arrange the progress reasonably, supervise the quality and ensure no waste. Involved in engineering changes, the specific situation. According to the opinions of the design institute and the owner, modify the system diagram and floor plan.

Reason for leaving:

Graduate school: Guangdong Vocational and Technical College of Mechanical and Electrical Engineering

Highest education: college graduation date: June 0, 20061

Major 1: electromechanical integration major 2;

Education and training experience: start and end date, school (institution) special industry certificate number.

2003-092006-06 Graduation Certificate of Mechanical and Electrical Integration Major of Guangdong Vocational College of Mechanical and Electrical Technology1274xxxxx6019322

2006-03-2006-07 Inter-departmental communication of engineering and technical personnel of Guangzhou Hong Xin Human Resources Management Co., Ltd.

Scientific working methods of engineers and technicians in Hitachi Elevator (China) Co., Ltd.

2006-03-2007-08 Stress and emotional management of engineers and technicians in Guangzhou Hong Xin Human Resources Management Co., Ltd.

Foreign language: English is average.

Mandarin level: excellent Cantonese level: excellent.

2009/04 driver's license (C 1)

2006/02 Advanced Certificate of Maintenance Electrician (PLC? Electrical troubleshooting)

2005/02 Intermediate level of computer aided design draftsman

2004/05 National Computer Level 1 (familiar with office operation)

I realize the importance of communication in my work. Sometimes people's different angles and positions will produce some factors that make my work not smooth, so that everyone can rise to the interests of the company, unify their positions and angles, and eliminate unfavorable factors, which will make my work more smooth.

?

Chapter 2: Resume Template

personal information

Current residence: Shaoguan Age: 54

Household registration: Shaoguan Nationality: China.

Marital status: Married ethnic group: Han nationality

Height:175cm

Weight: 65 kg

working strength

Talent type: general job hunting

Position: electrical engineer/technician, engineering supervisor, computer-aided design engineer.

Working years: 30. Title: Intermediate.

Job Type: Full-time Availability Date: One week

Monthly salary requirements: 5500 ~ 7999 yuan, I hope to work in Guangdong Province.

Business experience

* * Commencement date: 201-04 ~ 2013-04.

Company Nature: State-owned Enterprise Industry: Construction Engineering

Position: electromechanical supervision engineer

Job Description: In the development project of the new campus of the University of Macau in Qinhengdao, Zhuhai (construction area of Guangdong-Macao cooperation key project 1 10,000 m2), I was responsible for the electromechanical engineering supervision of the first-phase contracted project, including the embedment and installation of water and electricity, heating and ventilation, air conditioning, ventilation, fire fighting, intelligence and other system projects in the central teaching building, library and school history exhibition hall with a total area of10,800 m2. Goal-building benefits? Luban Award? At present, the Excellence demonstration project has entered the handover stage, and the second phase and the landscaping finishing project are taken care of.

Reason for leaving:

* * Commencement date: 2009-10 ~ 2011-02.

Company nature: private enterprise industry: construction engineering

Position: Supervision Engineer of Hydropower Specialty

Job Description: Department: Beijing Yanbo Engineering Management Guangzhou Branch. Has been engaged in Guangzhou Jingtaiyong comprehensive improvement project, Guangzhou Railway Station Square environmental decoration project (won? Double excellent? Engineering) and Zengcheng automobile industry base municipal road engineering. Responsible for the installation and emission control of rain and sewage pipelines; Street lamps, landscape lighting, installation of street lamps with complementary scenery and underground communication cables; Supervision work such as bridge engineering.

Reason for leaving:

* * Commencement date: March 2008 to June 2009 10.

Company nature: private enterprise industry: real estate/construction

Position: electrical professional supervision engineer

Job description: Guangzhou Jindi? Professional supervision of electrical engineering in area A of Lihu City. Responsible for Jindi? 1.8 mu residential villa and the second floor of the west tower of East Tower Building in Li Hucheng Area A Phase II: 10 high-rise intelligent building, with 35 floors in total, including water and electricity embedment, lightning protection, power supply and distribution, automatic fire alarm system, intelligent security system, cable TV and telecom telephone installation supervision, and the project will be completed and accepted in June 2009. Project responsibilities: Be responsible for the pre-embedded inspection of electrical parts of 10,1,12, 13, 14 and 16 groups, and check the materials, equipment and equipment that the building electrical specialty enters the site. Regularly submit the implementation of supervision work in this discipline to the director, review the progress plans and construction plans of all construction units involved in this discipline and form written opinions, write supervision details, fill in supervision diaries regularly, be responsible for the collection, summary and collation of supervision data in this discipline, and participate in the preparation of monthly supervision reports.

Reason for leaving: The project has been completed.

academic degree

Graduate school: Guangdong Radio and TV University

Highest education: college education: graduation date: 1983-08.

Major 1: electronics major 2: factory electricity and building electricity.

Start Date End Date The number of professional certificate obtained by the school (institution).

1993-09 till now, qualification certificate of electrical engineer of Shaoguan Personnel Bureau, number of Guangdong Vocational Certificate. 03050020 10572H。

1994-04 1994-05 PLC programming and application certificate of electrical industry control of Guangzhou PLC training association.

2010-10 2010-1Guangdong Construction Supervision Association Electrical Engineer Education and Training of Guangdong Construction Supervision Practitioners b10/0/3/kloc-0.

20 1 1-09 20 1 1- 10 IAMA-20 1 12 125438+2065438。

linguistic competence

Foreign language: English general Cantonese level: good.

Other foreign language abilities:

Mandarin level: good.

;