How to write a 3000-word summary of intermediate titles in Shanghai?
[Transferred from First official website: gongwen. 1kejian.com] Technical summary requirements for intermediate titles.

This paper introduces the author's own work, achievements and technical achievements in construction machinery.

Technical summary of intermediate title Fan Wenyi [transferred from the first official website: gongwen. 1kejian.com]

This kind of article is mainly what I said above, introducing my resume, performance and achievements in all aspects of my work.

Summary of technical work of intermediate title construction specialty

I. Resume

I graduated from Xi University of Architecture and Technology, a famous architectural school in China, in July 2004, majoring in five-year urban planning, with a bachelor's degree. After that, I worked in Lianyungang Urban Planning and Design Institute, engaged in urban planning, urban landscape design and architectural design. In 2007, he was appointed vice president of Planning and Design Institute. Has been engaged in urban planning, urban landscape and architectural engineering programs, construction drawing design and related theoretical research, planning and design technology research, and has outstanding performance in "morality, ability, diligence and performance".

Second, political thought and moral quality

First of all, we should actively demand ideological progress, keep up with the pace of the times, seriously study the principles and policies of the party and the state, and understand the latest social trends. Although I haven't joined China * * *, I have always been strict with myself according to party member's standards, consciously accepted the supervision and help of party member and my colleagues, and made unremitting efforts to overcome my own shortcomings and make up for them, so that I can stand the test in the long years to come and join the great cause of China * * * as soon as possible.

As a city planner, I have always adhered to the professional ethics of planners, and tried to find the greatest intersection and balance point among administrative means, developers' interests and the needs of the masses, so that every project I am responsible for is truly pragmatic. Therefore, it is the basic principle of my work to treat every project seriously and attentively. This point has also been unanimously recognized by the planning bureau and hospital leaders.

Since I joined the work, I have a strong sense of ownership, closely linking the development of the company with my own development. I always abide by the company's rules and regulations, actively obey the leadership's work arrangements, successfully complete various tasks, and safeguard the collective honor. Work hard at work, study relevant professional knowledge, sum up work experience and skills, and constantly enrich and improve yourself. At the same time of self-improvement, we also strive to shoulder the burden of "academic leader" of the unit, organize colleagues to summarize exchange projects at ordinary times, help new colleagues enthusiastically, enhance the cohesion of the unit and promote the overall progress of the team.

Third, professional and technical ability.

Since taking office, I have participated in many professional and technical trainings organized by provincial and municipal construction authorities, participated in many annual meetings organized by Jiangsu Planning Society and Planning Association, and conducted many academic exchanges and technical cooperation with Shenzhen Urban Planning and Design Institute and Jiangsu Urban Planning and Design Institute in planning and design projects. I have investigated the urban planning and construction of famous domestic cities such as Beijing, Shanghai, Guangzhou, Shenzhen, Zhuhai, Xi, Qingdao, Linyi and most cities in Jiangsu Province. Through these studies, exchanges and investigations, my academic and technical vision and practical work ability have been greatly improved. At the same time, we also try our best to understand and master the new theories, technologies, methods and norms that are constantly introduced to guide the usual planning and design work and the technical management of hospital projects.

Fourth, work attitude.

I always think that urban planning is a great cause that can serve the administration and benefit the people, so I love my job very much. It is the basic principle of my work to treat every project seriously and attentively.

No matter at work or in life, I always believe that no pains, no gains, so I have been studying hard and working hard. Ensure attendance on time during normal working hours, make effective use of working hours, stick to their posts, and seriously study and accumulate professional knowledge and work experience in their spare time. However, design units often face multiple tasks or sudden emergency tasks at the same time. In the case of tight schedule, few people and heavy tasks, I can work overtime day and night, complete the task with good quality and quantity on time and ensure the progress of the project, which shows that our planners have a strong sense of responsibility and carry forward the spirit of continuous work and hard struggle.

After the Wenchuan earthquake in 2008, our hospital undertook the task of compiling Lianyungang's aid plan for Shidi Town, Mianzhu City, Sichuan Province. This is an important task of aiding Tibet on behalf of Lianyungang and even Jiangsu. When I went to Sichuan for the first time, the Provincial Construction Department unanimously requested to slow down the progress and carry out the planning work on the spot, and asked for a preliminary aid planning plan in three to four days. As the person in charge of the project, I led the project team to work around the clock, and completed the preparation of the preliminary plan on time and with high quality, which was unanimously recognized by the Provincial Construction Department and the local government. In the subsequent compilation process, we always adhered to the spirit of not being afraid of hardship and fatigue, and finally handed in a satisfactory answer to the people in the disaster area, the people in our city and even the people in Jiangsu.

Verb (abbreviation of verb) main work performance

Reasons for declaring intransitive verbs

According to the relevant provisions of "Jiangsu Province Construction Professional Engineer (Architect, Urban Planner) Qualification Conditions (Trial)", I think the application conditions are as follows:

Technical summary model of intermediate title

This is to write your work performance according to the time you have been working.

I graduated from Fuzhou Construction Engineering Vocational Secondary School in July 2006, majoring in construction engineering, and joined Fuzhou Cangjian Construction Engineering Co., Ltd. in the same month of the same year. It has been five years since then. Looking back on my work in the past five years, the project I participated in was housing construction. For me, every event is a brand-new exercise and an accumulation of experience. In the past five years, I have grown from a junior high school student who is not deeply involved in the world to a qualified and proud person.

From July 2006 to June 2007, I was sent by the company to five groups of internship builders in the second phase of Jinpu Community, mainly responsible for on-site construction lofting and other work. I have a correct attitude towards study and work, and earnestly complete the tasks assigned by the builders. When you encounter problems you don't understand in your work, actively consult with experienced colleagues until you understand them. With the enthusiastic help of leaders and colleagues, my business knowledge and working ability have made great progress in a short period of time. During this period, I participated in the pile foundation acceptance, main body acceptance and blue prints.the design of the project, which was affirmed by leaders and colleagues. At work, I always remind myself to finish my job down-to-earth, seriously and persistently, and strive to improve my professional and technical level and comprehensive quality.

From XX to XX in 2007, I was transferred to the commodity inspection complex building project of XX Project Department as a builder. This project includes office building, boiler room, fire pool and other projects. At work, I carefully read the drawings, carefully calculate the number of applications for various materials, and strive to avoid unnecessary waste and save every penny for the enterprise. Insist on writing a construction log every day, carefully record the related engineering events that happened that day, and report the problems that can't be solved in the project to the competent builder in time. I am not afraid of hardship and fatigue. I actively cooperate with the responsible builder and try my best to complete the tasks assigned by him. In XXX month, the main body of the office building was capped, and the builder in charge of construction took a vacation for some reason, so the burden of the project fell on me alone. At this point, the project has begun to enter the decoration stage. Although every process is brand new to me, I didn't flinch, caught up and worked harder, and the project was delivered as scheduled. My efforts were recognized by the leaders, and I was promoted to supervisor in ××× years.

From ×××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××× I carefully read the drawings, made a list of embedded parts, and recorded the position, quantity and length of embedded parts on each floor in detail, so as to facilitate the timely and convenient use during construction inspection. After the completion of the project, there is no omission or dislocation of embedded parts, which lays the foundation for the next working procedure. In the 8# substation project, I focused on controlling the roof waterproofing, door and window waterproofing, external wall waterproofing and other processes. After the completion of the project, the waterproof effect of the roof, doors, windows and external walls has been affirmed by the owner. Combined with commodity inspection building and 8# substation

According to my own construction experience, I completed the article "Brief Introduction of External Wall Leakage Causes and Prevention Measures", in which various causes leading to external wall leakage and corresponding prevention measures were carefully analyzed. Through this article, I have deepened my understanding of external wall seepage control.

From ×××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××× The construction period is only ten months, and it also spans a winter vacation. The construction period is tight and the task is heavy. I made a detailed work plan, and the monthly production, template quantity, bottom modulus and plane layout position of each prefabricated member were planned in detail according to the construction period. In the actual construction, we don't stick to the construction plan, and actively adjust according to the types and quantities of components required for each bidding section on the water to meet the use requirements. At the same time, I also presided over the design of fence board and sky block template. Good formwork design not only saves the steel consumption of formwork, but also improves the appearance quality of components. After nine months' efforts, the production task of the first bid section of prefabricated components was finally completed one month ahead of schedule, setting a record of 193 boards per day. While paying attention to the production schedule, I also attach importance to the production quality of prefabricated components. Corresponding measures were taken to strictly control the common quality problems such as loose roof, slurry leakage and cracks, which won the honor of high-quality concrete for the railing project. In the process of making Japanese lexical chunks, the problem of Japanese lexical chunks has become a big problem that puzzles the project department. Because of its large size and heavy weight, Japanese-style Chinese characters are very difficult to hoist and transport, and the cost is high. In view of this situation, I suggest that the Japanese word block should not be taken out of the pool, but should be poured on the spot, and it can be hoisted on the spot when it is used in the water tender section, which saves the hoisting and transportation of the Japanese word block on the spot, which is convenient for construction and can save money. Once this proposal was put forward, it was strongly supported by the leaders of the project department. After being put into practice, the effect is good, and the proposal won the rationalization proposal award of the company.

From ×××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××× In the design, the purpose of saving investment can be achieved by reducing the arrangement of piles and reducing the length or diameter of piles. I consulted a large number of relevant materials, combined with engineering practice, compiled a special construction scheme of post grouting, and discussed in detail the principle, construction technology and effect of post grouting in the scheme, which played a valuable reference role for the construction of related projects in the future.

From {\\ lang 1033 ,} to {\ \ lang1033 {\ lang1033,}

The formwork matching scheme adopts the combination of traditional steel formwork and channel steel, which takes into account the firmness of formwork and the aesthetics of concrete and has achieved good results in practical application. Strictly control the straightness and flatness of runway beam angle steel during construction, and strengthen concrete vibration to ensure the physical quality and appearance quality of runway beam. In this project, I wrote a paper entitled "Lean Concrete Mix Design and Construction Technology Analysis", summed up the idea of lean concrete mix design, and put forward some experience methods and viewpoints of lean concrete construction, hoping to play a reference role for everyone. In order to ensure the progress of the project, I insist on holding a meeting every day, calling the person in charge of each process to arrange the work for the next day through consultation, so as to avoid the work conflict caused by cross-operation as much as possible and ensure the smooth progress of each process to the greatest extent. The project was completed on schedule in XX month, which was fully affirmed by the owner.

Up to now, I have been working as the builder of the XX contract section, responsible for the construction of the XX contract section, including two large bridges, a medium bridge, two small bridges, three culverts and a subgrade of more than 2,000 meters. In this project, I participated in the preparation of the construction organization design, and presided over the preparation of the construction plan of each sub-project. I also participated in the design of pier, capping beam and box girder formwork. In the process of construction, I carefully read the specifications and design drawings and became familiar with the relevant technical standards, so I really know what I am doing. For me, this is a brand-new project. I am confident that I can do the project well and hand in a satisfactory answer to the leaders of the project department and the fourth company of No.1 Aviation Administration.

The above is a summary of the main professional and technical work that my technicians have been engaged in for five years. By combining theory with practice and summing up my own experience, I have been able to complete my work well and complete various tasks well, which has been affirmed by unit leaders and colleagues. In the future work, I will continue to consolidate and improve my professional knowledge and level, foster strengths and avoid weaknesses, and further do my job well.