Many projects of Xiying Reservoir in Yuanping City will start.
It is not clear yet. At present, according to the news report of Yuanping City, Pei Feng, deputy director of Shanxi Provincial Water Resources Department, led a team to investigate the preliminary work of Xiying Reservoir Project in Yuanping City on March 1 1 day, 2022. He visited the gate management station of Shangyangwu Village in Daniudian and Shenshan Reservoir successively, listened to the report on the preliminary work progress of relevant departments, and carefully understood the reservoir site selection, reservoir function, design scheme and basin water resources planning, and will start construction as soon as possible in the later period. Xiying Reservoir is an important storage project of the second level water diversion project from the Yellow River in Shanxi's flood network planning. The reservoir is located in the downstream of Xiyinggou, a tributary of Shenshan River in Yuanping City, about 700 meters west of Shenshan Village, and belongs to the side diversion reservoir project on the Wu Yang River, a first-class tributary of Hutuo River. The designed reservoir has a total storage capacity of 8.76 million m3, which is a small reservoir mainly for industrial water and agricultural irrigation. After the reservoir is completed, it can provide 23.7 million cubic meters of stable water supply for life and industry in Yuanping City in normal years, ensuring 6.5438+0.23 million mu of agricultural irrigation water; Extraordinary drought years can provide domestic and necessary production water for Ding Xin Basin. It has certain social and economic benefits.