What is lifting operation?
What are the precautions for hoisting operation?

Precautions for hoisting operation: 1. An application form for lifting operation must be filled in before operation. 2. Warning maintenance should be set up in the hoisting area, and guardians should be equipped. 3, all lifting personnel should hold relevant certificates. 4, check whether the sling is in good condition, no overload operation. 5. At least two guide ropes should be used for each lifting. 6, it is forbidden to personnel standing under the hanging objects. 7, the ground should be level, the crane's four legs should be balanced. 8. The lifting load shall not exceed the rated load of cranes and rigging. 9. When the rope touches the sharp edge of the lifting object, it must be protected with a suitable pad. 10. Generally, there are the following personnel in hoisting operation: signalman, crane driver, supervisor and assembler. 1 1. After the operation, clean up the site and cancel all fences and warning signs. The above contents are compiled according to the problems encountered by the students in their actual work for reference. If in doubt, please communicate and correct in time.

What are the hoisting operation specifications?

Safety regulations for lifting operation in factory area

Safety code for lifting in workplace

Mercury 23015–1999

1 Subject content and scope of application

This standard specifies the classification, grading, operation safety requirements and management of lifting safety operation certificate of lifting operation.

This standard is applicable to the hoisting operation in the production area of chemical enterprises.

2 reference standard

The provisions contained in the following standards constitute the provisions of this standard through reference in this standard. At the time of publication, all versions displayed were valid. All standards will be revised, and all parties using this standard should explore the possibility of using the latest version of the following standards.

GB 28 1 1-89 safety helmet

GB 5082-85 hoisting command signal

HG/T 23008-92 Inspection Standard for Safety Management of Chemical Maintenance Site

HG 230 14- 1999 Safety Regulations for Working at Height in Factory.

Hg23011-1999 safety regulations for hot work in factories.

3 definition

This standard adopts the following definitions:

Lifting operation

The working process of lifting heavy objects with various machines and tools and changing their positions.

4 Classification and grading of lifting operations

4. 1 Classification of lifting operations

According to the weight of lifting heavy objects, lifting operation is divided into three grades:

When the lifting weight is more than 80 tons, it is a first-class lifting operation;

When the weight of lifting heavy objects is more than or equal to 40 tons and less than or equal to 80 tons, it is a secondary lifting operation;

When the lifting weight is less than 40 tons, it is a three-level lifting operation.

4.2 Classification of lifting operations

According to the hoisting operation level, hoisting operation is divided into three categories:

The first-class hoisting operation is a large-scale hoisting operation;

The secondary hoisting operation is medium-sized hoisting operation;

The third-level hoisting operation is a general hoisting operation.

5 Safety requirements for lifting operation

5. 1 Lifting operators must hold a special type of work permit. Lifting objects with a weight greater than 10 ton shall obtain a lifting safety operation certificate. See the appendix for the format of lifting safety operation certificate.

5.2 The hoisting construction scheme shall be prepared for hoisting objects and civil main structures with a weight greater than or equal to 40 tons. Although the weight of the hoisting object is less than 40 tons, the hoisting construction scheme should be prepared under the conditions of complex shape, small stiffness, large length-diameter ratio, precision and rigor and special construction. The hoisting construction plan can be implemented only after it is reviewed by the competent construction department and the safety technology department and approved by the competent factory director or chief engineer.

5.3 Before all kinds of hoisting operations, safety warning signs should be set at the hoisting site in advance, and special personnel should be assigned for supervision, and non-construction personnel are not allowed to enter.

5.4 During hoisting operation, there should be sufficient lighting at night. When outdoor operations encounter heavy snow, heavy rain, fog and strong winds of magnitude 6 or above, operations should be stopped.

5.5 The lifting operators must wear safety helmets, which shall comply with the provisions of GB 28 1 1, and the work at heights shall comply with the provisions of HG 230 14.

5.6 Before lifting operation, check the lifting equipment, wire rope, wind rope, chain, hook and other machines and tools to ensure safety and reliability, and do not use them in spite of illness.

5.7 During hoisting operation, it is necessary to have a clear division of labor, stick to their posts and conduct unified command according to the contact signals specified in GB 5082.

5.8 Pipes, pipe racks, poles, mechanical and electrical equipment, etc. are strictly prohibited. As a hoisting anchor point. Without the examination and accounting of the motor and construction departments, buildings and structures shall not be used as anchor points.

5.9 Before lifting operation, the operating parts, safety devices, slings and rigging of various lifting machinery must be inspected in detail, and the safety devices of lifting equipment should be sensitive and reliable. Before hoisting, the crane must be tested and the operation can be carried out only after it is confirmed.

5. 10 No one is allowed to lift heavy objects or lifting machinery. Under special circumstances, reliable safety measures should be taken and approved by the on-site commander if it is necessary to ascend and descend with it.

5. 1 1 If it is necessary to carry out hot work at the hoisting operation site, the provisions of HG 230 1 1 shall be observed. Hoisting operation site ......

The lifting operation is divided into several levels to fill in the blanks.

Classification of hoisting operation: hoisting operation is divided into three grades according to the quality of hoisting heavy objects.

(1) the mass of the lifting objects in one lifting operation: > > 100t.

(2) The weight of lifting heavy objects in secondary lifting operation: 40t≤ to ≤ 100t.

(3) The quality of lifting heavy objects in the three-stage lifting operation: < < 40t.

What are the cranes commonly used in hoisting operations?

Lifting belt, wire rope rigging and crowbar.

Commonly used steel wire ropes include phosphating coated steel wire rope, galvanized steel wire rope, stainless steel wire rope or plastic coated steel wire rope, which are used in atmospheric environment. Manganese phosphating coated steel wire rope produced by patented technology has the longest service life, and hot dip galvanized-phosphating double coated steel wire rope is preferred in heavy corrosive environment. Phosphating coating improves the wear resistance and corrosion resistance of steel wire rope, which is the reason for improving the service life of steel wire rope. Smooth wire ropes are being completely eliminated.

What are the rules of lifting operation?

On-site supervision of security personnel, construction personnel make plans in advance, and then implement the "Ten Don't Hoist".

What are the three certificates for lifting operation?

You are talking about "one machine and three certificates" for crane operation. When using a truck crane for hoisting operation, it is necessary to check the "three certificates for one crane", in which the "three certificates" are the crane inspection certificate (1) and the crane operator certificate (3) the hoisting operator completion certificate.

Be clear about what to wear when you mention it.

Check the settlement and hoisting preparation of crane trolley, wire rope and supporting ground.

What should I pay attention to when hoisting?

1. Lifting operators must hold a special operation certificate. For lifting objects with a total weight exceeding 10 ton, a lifting safety operation certificate shall be obtained;

2. The lifting construction scheme shall be prepared for objects and civil main structures with a total lifting capacity of more than 40 tons. Although the lifting object is less than 40 tons, in the case of complex shape, small stiffness, large length-diameter ratio, high precision requirements and special construction conditions, the lifting construction scheme should also be prepared, which can be implemented only after being reviewed by the competent construction department and safety technology department and approved by the superior supervisor or chief engineer;

3. Before all kinds of hoisting operations, safety warning signs should be set at the hoisting site in advance and supervised by designated personnel, and non-construction personnel are not allowed to enter;

4. During hoisting operation, there should be sufficient lighting at night. When outdoor operations encounter heavy snow, heavy rain, fog and strong winds of magnitude 6 or above, operations should be stopped;

5. Lifting workers must wear labor protection articles correctly, and the wearing of safety helmet should comply with the provisions of GB28 1 1, and the work at heights must comply with the provisions of HG230 14;

6. Before lifting operation, check the lifting equipment, wire rope, wind rope, chain, hook, rigging and other machines and tools to ensure safety and reliability, and do not use them in spite of illness;

7. During hoisting operation, it is necessary to have a clear division of labor, stick to their posts and conduct unified command according to the contact signals specified in GB5082;

8, it is forbidden to use pipes, pipe racks, poles, mechanical and electrical equipment, such as hoisting anchor points. Without the examination and accounting of the motor and construction departments, buildings and structures shall not be used as anchor points;

9. Before lifting operation, the operating parts, safety devices and spreader rigging of all kinds of lifting machinery must be inspected in detail, and the safety devices of lifting equipment should be sensitive and reliable. Trial hoisting must be carried out before hoisting, and it can be operated only after it is confirmed.

10, no one is allowed to lift heavy objects or lifting machinery. Under special circumstances, if lifting is required, reliable safety measures should be taken and approved by the on-site commander;

1 1. If hot work is required for hoisting operation, the provisions of HG230 1 1 shall be observed. Lifting ropes, wind ropes and traction ropes at the hoisting operation site should avoid touching live wires and keep a safe distance;

12. When using crawler crane, tire crane, bridge crane and other shaped lifting machinery for hoisting, in addition to complying with this standard, the operating procedures of shaped machinery should also be observed;

13. During hoisting operation, it must be hoisted according to the specified load. Slings and rigging are selected and used through calculation, and overload operation is strictly prohibited. When the lifted weight is close to or reaches the rated lifting weight, check the brakes and lift it smoothly after a trial lift with low height and short stroke;

14, it is forbidden to stand, pass and work under hanging heavy objects;

15. During hoisting operation, the regulations of "Ten Don't Hoist" must be strictly observed, namely: ① the command signal is unknown; ② Overload or unknown object weight; (3) Pull out the weight of the oblique crane; (4) The light in the workplace is insufficient, and there are many flashes or shadows; (5) people standing under heavy objects; ⑥ Heavy objects are buried underground or tied to the lifted heavy objects with traction ropes and connected with other pipelines; ⑦ The weight is not fastened firmly, and the rope is fast knot, which is unqualified; Rigging mismatch; 8 Edge objects are not padded; Pet-name ruby over the head; Attending safety device failure.

16, the operation must be carried out according to the contents reported in the lifting safety operation certificate, and it is forbidden to alter or lend the lifting safety operation certificate, change the operation content, expand the operation scope or transfer the operation site;

17. If the approval procedures for hoisting operation are incomplete, the safety measures are not implemented, the working environment does not meet the safety requirements, and the commander gives illegal instructions, the operator has the right to refuse the operation.