Summary of coal mine safety production meeting
Time: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Venue: conference room on the third floor of the office building
Moderator: _ _ _
Participants: mine leaders, party and government leaders of all units under the mine, the first person in charge of the construction team, managers at or above the deputy division level, and the first person in charge of the units stationed in the mine.
Meeting agenda:
1. convey the spirit of the company's safe office meeting in _ _ _.
2. Convey the chairman's speech at the company safety meeting on _ _ _ _.
3. Briefly convey _ _ month safety work summary and _ _ month safety work plan.
4. Each production unit speaks: monthly key work report? Three violations? Self-inspection and notification.
5. Various functional departments put forward corresponding requirements for the majors in charge.
6. Mine leaders have deployed _ _ _ _ _ _ years of safety work.
The minutes of the meeting are as follows:
First, keep doing well? Looking for, grasping, and urging? Activities, and then lift the new climax of activities in April, will our mine continue to carry out? Looking for gap activities? Every employee should actively change their thinking, improve their understanding, set their own higher work goals and strive for the first place in their work. At the same time, at? Looking for, grasping, and urging? During the activity, we should do a good job in rectifying key issues and outstanding problems, and strive to achieve strict requirements, high standards and accurate acceptance? Looking for, grasping, and urging? Debate on the formulation of activity implementation plan? Fifteen firsts? Target.
To ensure the mine? Looking for, grasping, and urging? What is the effect of the activities of the mine construction team? Looking for, grasping, and urging? Activities are also managed in a unified way. At the same time, the management and control of employees' unsafe behaviors are carried out within the construction team, and efforts are made to standardize the construction team and improve the construction of intrinsic safety system.
Second, improve the construction of intrinsic safety system.
All units strive to do a good job in the rectification of the problems existing in the construction and acceptance of the intrinsic safety system of our mine in the first quarter, form a real intrinsic safety system, realize the field application of the risk pre-control safety management and control mode, and put an end to it. Two skins? Phenomenon. _ _ _ _ month, the main work arrangement of each unit's intrinsic safety system construction:
1. Next week, the leaders of all units will seriously study essential safety knowledge and do a good job in training employees' essential safety knowledge. The form of learning can be self-study or concentrated learning. The security office and the operation office should do a good job in the assessment of each unit.
2. Each unit shall designate full-time safety management personnel and report to the safety office on _ _ _.
3. Standardize the rectification work. The current standardization work in our mine involves the current safety production problems, and all units should immediately rectify the standardization problems with high speed and good effect. During the standardization rectification, the mine manager should lead the staff of each mining unit to visit and study the benchmark mine (Xiaohonggou Coal Mine), and each unit will formulate the implementation plan of standardization rectification after visiting and studying. Looking for, grasping, and urging? Strictly implemented during the activity, and strive to achieve mine dynamic standards.
Third, attach great importance to hazard identification.
The whole mine comprehensively identified risks from top to bottom, and revised and improved the "Goujian Coal Mine Risk Management Manual". This work is the first task of _ _ _. _ _ _ Before the end of the year, all functional departments will improve the review and audit of system documents according to intrinsic safety standards, and the Safety Supervision Office will re-create hazard identification cards and conduct spot checks on hazard identification for each employee.
Fourth, do a good job in the assessment of the points system.
All units do a good job in improving the assessment system of the points system, do a good job in the assessment of team leaders, and strictly implement the shift change of team leaders. The Office of Operations shall supervise and guide this work.
Five, strengthen the safety management of coal mining face.
1, the company will carry out the operation procedures appraisal activities in the near future. In order to improve the level of operating procedures and standardize the preparation of operating procedures, all production teams in the mine should do a good job in the preparation of operating procedures, and the production department should organize the approval and revision of operating procedures.
2, fully mechanized team 1, fully mechanized team 2 to fully and strictly supervise the working face pre-blasting technology, especially the key monitoring of drilling, charging, hole sealing and blasting. The on-site person in charge of the district team should fill in the advanced pre-blasting management board realistically to ensure that the construction personnel carry out the process construction according to the design requirements.
3, fully mechanized team 1 supervision Anshun Dayun latex matrix in the process of transportation _ _ _ lane belt recycling work.
4. The second team of fully mechanized mining will strengthen the management of water prevention and control in the working face, and at the same time strengthen the management of the use of battery cars in the working face.
5. The construction team should strengthen the training of employees' job responsibilities and equipment operation standards, and they will be tested by the security office next week. Meanwhile, the intrinsically safe office will set up a construction team? Unsafe behavior of personnel, namely three violations? Monthly assessment indicators (each team, monthly self-inspection? Three violations? Not less than (including) 5 people) into the unified management of the mine.
6, mine functional departments should strengthen the supervision and service consciousness of the construction team, and actively assist the construction team to complete the work assigned by the mine with good quality and quantity.
7, mine functional departments to guide the construction team to do a good job of employee hazard identification.
8. Dig a team to speed up the maintenance progress of Dongsan +5 18b2 lane, and provide conditions for the personnel of the second fully mechanized mining team to enter the drainage hole of b2 lane.
Six, strengthen the safety management of electromechanical transportation
Are you online? Looking for, grasping, and urging? During the activity, all units should attach great importance to the standardized management of mine transportation hoisting system and strictly manage the daily operation of the system.
1. All units should conduct daily training and assessment on the operating standards of the equipment in use, and require employees to understand the equipment performance, standardize the operation and maintain the technology.
2. Production units should make good use of the precision spot check system of equipment, strengthen the sense of responsibility of post personnel, and prevent equipment from working in spite of illness. Functional departments should strengthen the supervision and guidance on the operation of the equipment precision spot check system, and remind the production unit in time to help solve the problems when found.
3. Before the new equipment is put into production, the equipment department, operation department and users should do a good job in pre-job operation training for employees.
4. All units should standardize the use of mechanical and electrical equipment safety protection devices to ensure that the protection is sensitive and reliable, and the equipment department should do a good job of daily inspection of safety protection devices.
5. At present, the main equipment of mine transportation centralized control system has been installed. Comprehensive team 1, comprehensive team 2, transportation team and coal preparation plant have carefully summarized the experience of using centralized control system. The mine manager should supervise and inspect the operation of the system, and the equipment inspection personnel of each unit should improve their sense of responsibility and deal with problems in time.
6, various functional departments to increase the safety inspection of the ramp. The dispatching room shall do a good job in retraining the signal hook workers, and the automobile fleet shall coordinate the signal hook workers and winch workers equipped with the downhill lifting system of Dongyi +556~+5 18 track and Dongsan +556~+495 track. In view of the heavy workload of downhill hoisting of Dongsan +556~+5 18 track, the transport team should focus on coordination.
7. The equipment office and the transportation team should carefully investigate the hidden dangers of the main shaft belt and the inclined shaft belt, prepare rectification measures and strictly implement them to ensure the safe operation of the main shaft belt before replacement. The Equipment Department is responsible for the preparation and improvement of the work plan for spindle belt replacement from _ _ _ _ _ _ _, the follow-up and implementation of the preparatory work in the early stage, and the emergency drill for belt conveyor disasters.
8, equipment office, transportation team to strengthen the safety management of roadway excavation.
Seven, mine political safety construction.
All units should seriously study the knowledge of political security, especially the concept part, system part and target part. We should learn from it. Ten aspects? To find the gap, we should adhere to the principle of scientific, systematic and practical unity, pay equal attention to prevention, control, system and supervision, and integrate the system construction work into the central work, overall work and business work.
Eight. Specific work arrangement
1. All units carefully studied the belt conveyor accident in Wuhai Gou Ping Mine, and everyone wrote down their own learning experience. The security office checks the learning situation of each unit.
2, each unit underground, ground belt operation shall not be arranged to clean the belt, belt operation, must be issued to the nearby staff safety warning.
3, mechanical and electrical equipment, wires, cables, signs and signs used by each unit to fill in the specification.
4, each unit must fill in the downhole records, do a good job of daily cleaning equipment.
5. Underground pipelines and cables of all units shall be in strict accordance with? Ten ones? Management requirements.
6. The transport team shall do a good job in track maintenance and repair of +556b8 lane.
7, fully mechanized first team, fully mechanized second team, mechanical transport team, coal preparation plant to do a good job of belt impurity removal.
8. The equipment department should actively contact the company this month to carry out the performance test of key equipment in the mine.
9. The equipment office shall ensure that the new air compressor on the ground can be put into normal use before _ _ _ _.
10, the equipment office will organize the hidden trouble investigation of mine power supply system next Wednesday, and report the hidden trouble of each unit to the safety office.
_ _ _ _ _ _ Finishing by Intrinsic Safety Management Office
_ _ _ _ _ _ _ _ _ _ _ _ _
Minutes of coal mine safety production meeting II
On, the general manager of the company presided over the safety office meeting. Leaders above deputy chief engineer of the company, heads of government departments, mining teams, auxiliary teams and other units attended the meeting. The meeting summarized the situation of safety production last week and pointed out the problems existing in safety production in the near future. Finally, the company's general manager _ _ _ combined with the current overall situation of safety work, emphasized and deployed how to do the next step of safety production. The summary is as follows:
First, the overall situation of safety work last week (40, 20__)
Last week, personal accidents with minor injuries and above and non-personal accidents with level 3 and above were eliminated, and safe production was realized.
Second, the focus of this week's safety work
(1) One Ventilation, Three Preventions and Gas Prevention
1, comprehensive excavation work area should strictly implement 10705 gas management regulations during excavation. Gas control should be scientifically organized and implemented in advance, and the general prevention department should do a good job in business guidance.
2. The General Defense Department takes the lead in inspecting and guiding the mine ventilation system and gas extraction system, and carefully analyzes and solves the problems existing in the system to ensure the stability and reliability of the system.
3, the excavation area should conscientiously do a good job in 30702 cut and 30704 cut roadway.
Safety management, organize construction and safety supervision in strict accordance with breakthrough measures.
4, through the work area to strengthen the inspection and maintenance management of daily ventilation facilities, local ventilator management board to fill in the data must comply with the provisions of the "coal mine safety regulations". The general defense department should do a good job in supervision and guidance.
5. Each unit shall be in charge of the dust-proof scope in strict accordance with regulations, and strengthen the maintenance and management of dust-proof facilities to ensure that the dust-proof facilities are in good condition and reliable.
6, general prevention department to do a good job of gas overrun? One overrun, one analysis, one treatment? , do a good job of accounting and notify in time. Strengthen the ventilation and gas management of 35307 bottom pumping roadway during the recovery construction of 35207 downstream section. Do a good job of one ventilation and three prevention management in the construction of 35207 Huishun Lane in advance.
7, strengthen the management of mineral sheers around airtight, analyze and deal with the air leakage phenomenon of airtight anti-tank, and the General Prevention Department will take the lead in inspection this week.
8. Strengthen the daily local ventilator switching management and drainage pump maintenance management in the ventilation and prevention work area and the operation work area, and analyze and deal with the management that is not in place.
(2) Roof management
1, the second mining area and the first mining area should strengthen roof management during the final mining of 10703 and10/05 working faces. In the second mining area, do a good job in the wall construction management of gob-side entry retaining to ensure the wall construction quality, and at the same time do a good job in the maintenance and management of the support to ensure the initial supporting force of the support and repair the leakage of the support in time.
2, coal mining area, comprehensive excavation work area to strengthen during the final mining to prevent help, prevent people from slipping, anchor machine construction anti-falling measures and must confirm the power outage clutch before online operation, etc. Engineering Department and Safety Supervision Department strengthen supervision and management.
3. Strengthen the safety management of the roof during the drainage cavern in the second mining area 10703 working face.
4. All units should manage the use of front probe beams to ensure that the number of front probe beams, backboards and wedges meets the requirements of operation procedures, and the engineering department and safety supervision department should strengthen on-site supervision.
5, each tunneling unit should strengthen the management of roof support within the scope of charge, and make up for the failure of anchor cable in time. Do a good job in roof management during the second mining area 1530 1 retracement fault, and strictly carry out knocking and asking for roof.
6. The Engineering Department will take the lead in observing the roof of the total return air roadway in the third mining area, and take timely measures to organize the repair of roof caving and spalling.
(3) Auxiliary transportation
1, within the scope of strengthening responsibilities of all units? Three machines? Fixed maintenance management, earnestly learn from all kinds of accidents. It is forbidden to use any facilities to resist belt deviation or use irregular sweeper, and clean up the floating gangue under the belt in time to prevent the floating gangue from grinding the belt or the idler from rotating. Mechanical and electrical departments should do a good job of supervision and assistance.
2. All units should strengthen the ideological education of employees, standardize the operation and management of employees during hoisting and transportation, strengthen the management of winch drivers and signal hooks, and strictly implement them during hoisting? No driving. People and pedestrians don't drive? It is stipulated that normal pins should be used correctly, and it is forbidden to overload vehicles. The engineering department and the safety supervision department should strengthen the supervision and management of the site.
3. Each unit shall, in accordance with the company's requirements, configure regular parking devices in the parking lot, and maintain and manage the safety facilities within the scope of their duties to ensure that the safety facilities are sensitive, intact and reliable. Safety supervision department, technical department and mechanical and electrical department shall do a good job of supervision.
4. Strengthen the organization work during belt installation in the second excavation area 1530 1 Huishun, during installation? Loading, transportation, unloading and safety? The work must be carried out in place, and the supporting anchor rod is strictly used as lifting heavy objects. Safety supervision department and technical department shall supervise.
(4) Electromechanical management
1. All signs of five small electrical appliances in relevant units must be clearly and accurately filled in, all kinds of protective devices are complete and effective, and the listing management should be strengthened. Mechanical and electrical departments should strengthen the assessment.
2, the relevant units should strengthen the daily inspection and maintenance management of mechanical and electrical equipment within the scope of charge, put an end to the explosion phenomenon.
3, the relevant units should strengthen the daily inspection and maintenance management of mechanical and electrical equipment in charge of the scope, it is forbidden to get rid of any protection operation,
(5) Blasting management
1, the tunneling unit shall strictly abide by the blasting procedure. Must be strictly enforced? Three-person chain? , long-distance shooting, human alarm, asking for instructions, charging and sealing, etc. Before shooting, anti-reflux baffles and sandbags must be used for blowholes such as ditches, valves and belts, and the safety supervision department should do a good job in on-site supervision and management.
2, tunneling units should conscientiously do a good job in blasting management, strictly implement the system of receiving, using and returning blasting materials. The General Defense Department, the Safety Supervision Department and the Supply Department should do a good job in daily supervision and management.
(6) Others
1. In order to further strengthen the professional skills of employees, all relevant units should conscientiously do a good job in on-the-job training for employees.
2, the technical personnel of the tunneling unit in strict accordance with the standard requirements to do a good job of engineering quality management, to ensure that the roadway forming and so on meet the standards.
3. The general prevention department should conscientiously do a good job in the training of gas inspectors, carefully analyze common problems, and the safety supervision department should cooperate.
4. All relevant units should strengthen the sense of responsibility of the management personnel on duty, and the on-site team leader, team leader and quality inspector should do a good job in reporting on Class Three.
5. Before the coal mining area enters 3530 1 work, all personnel must learn the implementation, signing and assessment of operating procedures, and the engineering department and the safety supervision department should supervise them.
6, coal roadway cable hanging on the roof of the wire length shall not be less than 100mm, open the door, the geological structure belt must pull wire rope hanging, shotcrete roadway must continue to hang eye construction, business administrative departments and technical departments to do a good job of supervision.
7. In the gas prevention and control work area, strengthen the management of coal slurry during the period of 30704 being transported back to drilling, and make a good image of civilized construction.
8. In order to learn lessons from _ _ _ _ coal and gas outburst accidents seriously, according to the arrangement of Group Company and Nenghua Company, the company decided to carry out safety rectification by specialty, and defined the rectification time, rectification content, division of responsibilities and requirements. In order to ensure the smooth development of rectification activities, leaders in charge of all disciplines are requested to do a good job in charge according to the unified arrangement of the company.
Summary of coal mine safety production meeting III
Time: _ _ _ _ _ _ _ _ _ _ _
Venue: conference room on the second floor of the office.
Participants:
The meeting was presided over by _ _ _, director of the company's safety committee. At first, the meeting was reported by _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Deputy general manager _ _ _ conveyed the spirit of the group company's safe office meeting; Deputy General Manager _ _ _ explains the personnel changes of the Safety Committee; Other members of the safety Committee emphasized the key safety work in the near future; _ _ _ _, Director of the Security Committee, made a concluding speech. The contents of the meeting are summarized as follows:
A, operation procedures, safety technical measures for examination and approval management regulations
1. In addition to the internal examination and approval of the construction party, the mining company must also conduct examination and approval according to regulations. The approver must be the head of the department. In the absence of the head of the department, the relevant personnel with technical titles or above or administrative positions as deputy section chief or above may be entrusted for examination and approval.
2. The procedures or safety technical measures that need to be jointly reviewed shall be led by the leaders in charge of the company, and relevant departments, units and supervisors shall participate.
3. The regulations or safety technical measures are accompanied by the opinions of joint review and the signatures of participants. Mine? One pass and three defenses? And through measures, must be led by the ventilation department organization came; Operating procedures (capital construction period) shall be jointly reviewed by the Engineering Department; After the formation of the first mining face, other mining operation procedures and safety technical measures should be jointly reviewed by the production and technical departments; Mechanical and electrical transportation, installation, water supply and drainage should be jointly reviewed by the mechanical and electrical engineering department.
4, operating procedures and safety technical measures came to the meeting, there must be a meeting record; The original operating procedures and safety technical measures shall be signed by the joint reviewer (approver) and shall not be printed.
5, operating procedures and safety technical measures should be written at least _ _ days in advance before construction. Report to relevant construction units, business departments, relevant departments and supervision companies for filing _ _ days in advance (other temporary safety technical measures shall be submitted _ _ days before construction).
6. The information required for compiling operation procedures or safety technical measures must be provided to the construction unit by the relevant departments 15 days before construction, so that the construction unit can compile it.
7. Approval process
1), outsourcing construction unit
Unit technician (establishment)? Internal audit of the unit? Supervision company audit? Audit by relevant departments of the company? Company dispatching room audit? Audited by the company security department? Audited by the company's deputy chief engineer? Approved by the chief engineer.
2) Departments and teams of mining companies
Technician (establishment)? Internal audit of departmental and regional teams? Audit by relevant departments of the company? Company dispatching room audit? Audited by the company security department? Audited by the company's deputy chief engineer? Approved by the chief engineer.
Second, do a good job in the current key security work.
1, carefully study the experience materials of safety production management of Yi Sheng _ _ Group. Responsible persons of all departments and units should seriously organize employees to discuss, learn and learn from successful safety management experience, and earnestly do a good job in mine safety production. The company will check the implementation of the study.
Recently, some employees in the company are lax in discipline and don't work seriously. The heads of all departments should set an example, take the lead in setting an example, effectively change their work style and concentrate on their work.
3. When dealing with the problem of water gushing in the upper inclined roadway, we should strictly implement various work measures to speed up the progress of the project and ensure the construction safety.
4. Strengthen ventilation safety management. First, the gas management process should be institutionalized and standardized, and the ventilation department should strictly supervise the implementation of the system; Second, the installation and layout of gas drainage pipeline in the first mining face should be considered in advance to ensure the smooth implementation of the work; Third, it is necessary to ensure the normal operation of the local ventilator and put an end to unplanned wind stopping; Four, tile inspector and other types of wage adjustment, the human resources department will coordinate with the higher authorities.
Guess you are interested in:
1.Minutes of the latest safety meeting in September
2. Model essay on the format of minutes of emergency meeting on production safety
3. The comprehensive office summarizes the plan for the second half of the year (2)
4. The factory safety production meeting record content