Self-evaluation of supervision work 1
First, the basis of production safety supervision
According to the Law of People's Republic of China (PRC) on Safety in Production, Regulations of the Ministry of Water Resources on the Construction and Production Management of Water Conservancy Projects, relevant government regulations and safety technical regulations, the supervision contract signed by the construction unit and the supervision unit and the responsibility letter for safety in production.
Second, the supervision responsibilities and supervision objectives
1, safety production supervision responsibilities
_ _ _ Supervision Department is responsible for the supervision and management of safety production on the construction site of Qizil Reservoir reinforcement project, participating in the coordination and handling of safety problems that need to be solved urgently in the construction process, and supervising the contractor to implement the necessary technical measures for safety construction; When the contractor's safety production is seriously out of control, it is suggested that the employer should order it to stop work and make rectification; Assist in investigating and handling all kinds of safety accidents, and report the safety production situation to the employer regularly; Supervise the contractor to implement the safety production organization guarantee system and establish and improve the safety production responsibility system; Review the construction scheme and safety technical measures; Supervise and urge the contractor to educate the construction personnel about safety in production, check and urge the contractor to implement safety protection measures for sub-projects or key parts of each process according to the requirements of construction safety technical standards and specifications; Organize regular or irregular comprehensive safety inspection, put forward source management opinions and make rectification within a time limit; If illegal operation is found, it shall be ordered to stop operation, and if potential safety hazards are found, a regulatory notice shall be issued to order rectification.
2, production safety supervision objectives
_ _ The goal of safety production supervision is "four noes, putting an end to one and creating one". "Four noes" means no work-related injuries, no major mechanical equipment accidents, no traffic accidents, no fires and floods; "Put an end" means putting an end to serious injury accidents; "Once established" refers to the establishment of the safety etiquette project. The safety management objectives of "safety first, prevention first" and "production must be managed safely" should be implemented in the construction.
Three, the supervision of production safety supervision and monitoring system
_ _ _ Project has established a safety production leading group with the owner as the team leader, the director as the deputy team leader, and the functional departments of the owner and the project managers of all participating units as members, responsible for the leadership, supervision and coordination of safety production.
Establish a three-level safety production supervision and management system with the chief supervision engineer as the first responsible person, the deputy chief supervision engineer in charge of supervision and coordination and the on-site director, and implement an all-round and whole-process safety supervision and management mechanism.
Fourth, the safety supervision of the project construction process
_ _ _ The Engineering Supervision Department organized personnel to compile the Detailed Rules for the Implementation of Safety Construction Supervision according to the laws and regulations on safety production and the rules and standards of the construction administrative department, which provided guidance for the on-site supervision engineers to carry out the whole process management of safety construction.
Before the project starts, according to the construction contract documents and the main project supervision contract documents, the contractor's safety qualification, safety guarantee system, safety construction technical measures, safety operation procedures and safety flood control measures shall be examined and approved, and the implementation plan shall be supervised and inspected. Urge the contractor to report relevant safety production documents to the employer and the supervision institution; Before the start of each branch project, increase the contractor's safety technical disclosure information to the construction personnel. The construction projects are different and the emphasis is different, and make records.
Finally, it shall be signed by the participants, otherwise it will not be accepted, so that the contractor's operators can really make clear the safety points and implement the safety measures to the first line of production; According to the application for commencement of divisional works submitted by the contractor, after inspection, the supervision organization will examine and approve the divisional works in time according to the contract, and finally the director will issue the commencement order of divisional works and report it to the owner for future reference, so as to ensure safety from the source. With a rigorous scientific attitude and a solid work style, we will escort safety production and provide reliable guarantee for the quality and progress of engineering construction.
In the process of construction, strictly implement the current national laws and regulations on safety in production, as well as the regulations and standards of the administrative department of water conservancy industry on safety in production. The contractor is required to implement the policy of "safety first, prevention first", ensure the normal operation of the safety assurance system in the construction process, fully implement various safety management systems, safety production responsibility system, safety production technical measures and safety protection measures, and conscientiously implement various safety technical operation procedures to ensure the safety of personnel, mechanical equipment and projects. Special types of work (electrician, welder, rigger, lifting conductor and drivers of various vehicles) are excluded. After the contractor's application to the supervision organization is approved, the on-site supervision will check and implement it one by one according to the contract, and the construction can only be started after the examination is correct.
At the regular engineering meeting hosted by the supervision organization every Tuesday, according to different construction projects this week, the contractor is required to take corresponding safety measures at the construction site in accordance with the contract to eliminate potential safety hazards in time. At the supervision meeting every Friday, our department will discuss safety control as a special topic, summarize the safety production situation last week, arrange the key points of safety control next week, and require the on-site supervisors to seriously implement the safety inspection system during the supervision and implementation, and rectify and accept the problems found during the inspection within a time limit; At the same time, supervisors communicate with each other, learn from each other's strong points and jointly improve safety control skills.
According to the unified deployment of _ _ _ Project Management Department, the 20th of each month is organized by _ _ _ Project Management Department, presided over by Supervision Department, and the relevant person-in-charge of Project Management Department and the main person-in-charge of each bid section form a safety and civilized production inspection team to conduct safety inspection on the construction operation area of each contractor. Put forward the rectification deadline for the problems found in the inspection, and require all contractors to submit the safety production plan to the supervision institution and the owner after inspection and evaluation. According to the change of seasons and different construction projects, the emphasis of each inspection and appraisal is different, so as to prevent safety inspection from becoming a mere formality and form a long-term mechanism for safety production supervision, and make unremitting efforts.
Up to now, there have been _ safety inspections and _ appraisals (see annex); The supervision unit has submitted _ monthly safety production report and _ quarterly safety report to the owner; Issue _ copies of safety production supervision notice to all contractors.
Verb (abbreviation of verb) supervises the effect
It has been more than a year since the _ _ _ project was started on _ _ _ _ _ _ _ _. The supervision organization fulfilled its contractual responsibilities, and the supervision safety control achieved three goals: "personnel in place, requirements in place, and measures in place". With the strong support of the owner and the active cooperation of all parties involved in the construction, the safety production of the project is under control, and no safety liability accident has occurred so far. Safety production supervision has been recognized by the owners and government departments.
Six, the problems existing in the work safety supervision and the focus of the next step.
1, the existing problems
Summing up the work of our department in the past year, although some achievements have been made, there are still some unsatisfactory places, and there is still a necessary gap from the requirements of the employer. The main problems are as follows: there is a gap between on-site civilized construction, safety management and contract agreement, and individual construction workers are weak in safety awareness, taking chances, and do not wear safety helmets or buckle hats. Bad behaviors such as entering the construction site without wearing a seat belt or a safety rope, poor supervision of safety construction measures by managers, improper connection of construction power lines, inadequate full-time safety officers or weak sense of responsibility occur from time to time, and there are different degrees of safety hazards in the construction site. The site supervisor talked too much and gave too many notices. Although the problems pointed out by the supervisor have been rectified in the implementation, the same problems have been repeated many times, and the contractor has taken the initiative to improve and perfect the measures.
To this end, our department will aim at the problems existing in the supervision of production safety, find out the reasons, check the measures, do a good job of implementation, achieve results, and comprehensively improve the awareness of the supervision institutions to serve the owners.
2, the next step of production safety supervision work focus
With contract management as the center and safety operation rules as the criterion, the supervision organization strengthens the safe and civilized construction management of the construction site and living quarters, and strives to achieve the purpose of effectively controlling the safe production of the project.
Self-evaluation of supervision work II
20__ years is my first year as project director in _ _ engineering supervision company. Over the past year, with the correct leadership of the company and the strong support of the construction unit, I have thoroughly studied and implemented the relevant spirit of the company for 20 years. Taking science, justice, law-abiding and honesty as the criteria, taking the quality of supervision service as the guarantee, and aiming at improving the efficiency of the company, we have continuously strengthened the relationship with the construction unit and continuously optimized the internal management and operation mode, and the supervision department has made new progress in all aspects.
"Work hard, be rigorous and scientific, be meticulous, be fair and just" is my requirement for myself. Strictly abide by the company's rules and regulations, be able to go to work on time, obey the law and pay attention to unity. At work, I humbly ask leaders and other comrades for advice, which has benefited me a lot. After understanding each supervision task, carefully review the drawings and design documents, record and sort out the problems or ambiguities in the drawings and design documents in time, and communicate with the designers through the construction unit to facilitate the blue prints.the design and disclosure; Throughout the year, we supervised the new factory project of Jian 'an (Hangzhou) Technology Co., Ltd., with a total construction area of 19392. 1 m2, which consists of three six-storey workshops and a three-storey office building, all of which are frame structures. Among them, it has been successfully accepted by the subject.
First of all, in terms of quality control
1, the process control of construction quality is: urging the contractor to implement the quality management and quality assurance system;
2, according to the scale and characteristics of the project, timely preparation of supervision planning and supervision rules, pay special attention to the implementation of safety and use functions;
3. Check and urge the contractor to improve management, ensure the normal operation of the quality assurance system, and reverse the passive situation that there are few supervisors and it is impossible to supervise the whole process of the project.
4, raw materials used in the project require the contractor to sample according to the witness, and strengthen the acceptance of materials into the factory;
5, according to the new version of the construction quality acceptance specification, strengthen the detection and control of structural safety and use function.
Second, in terms of schedule control.
_ _ (_ _) Technology Co., Ltd. has a tight schedule for the new factory. I urged the construction unit to carry out the construction in strict accordance with the construction contract period, which basically ensured that all projects were completed on schedule.
Third, investment control.
During this year, I went deep into the construction site, measured and checked the amount of earthwork, garbage and all kinds of construction workload, and appraised and accepted all kinds of materials entering the site to ensure the rational use of funds.
Fourth, coordination and management.
Due to the imperfect management system of the contractor's project department in the preliminary work, the project management team could not be in place, which brought great difficulty to the supervision work. In addition to constantly informing the construction unit and seeking support and help, the supervision department also tries its best to handle the relationship between the construction team and the external environment and assist the contractor in safe production and civilized construction.
Verb (abbreviation of verb) Collection and arrangement of supervision data
In the supervision work, I attach importance to the management of the collection, sorting and archiving of supervision data, and do a good job of signing and collecting technical and quality assurance data in time with the progress of the project, which has laid a good foundation for the sorting and archiving of data. In order to ensure that the engineering data are complete and meet the requirements, the personnel of the supervision department have made disclosure to the on-site data personnel. The written documents issued by the project supervision department require strict and accurate wording, moderate discretion, fluent language and detailed information, and should be scrutinized repeatedly to avoid typos and spelling mistakes, because the supervision documents reflect the image of the company and the level of supervisors.
Suggestions on how to strengthen the quality assurance system of supervision project department by intransitive verbs
The service quality of the supervision company is realized through the normal operation of the supervision quality assurance system with the chief supervision engineer as the core. After several years of practice, I think it is very urgent to strengthen the quality assurance system of project supervision. In my work and practice, I summarized and applied "one core" and "three measures", and achieved good results, and proposed that the company should promote it.
1, "one core" means implementing the director responsibility system.
(1) precontrol management; (2) Project management; (3) document signing; (4) check and evaluate.
2. Implement three measures.
(1) Conduct technical disclosure first; (2) Strictly accept the first article supervision; (2) study and communicate regularly.
In the practice of supervision, it is considered that by "one core and three measures", the quality assurance system of project supervision institutions can not only grasp the key points and improve the efficiency of supervision work, but also help to standardize the supervision work behavior through a sound system and lay a good foundation for establishing the goal of "specialization and standardization" of supervision work.
Finally, I would like to thank the company leaders and various functional departments for their strong support and guidance to the supervision work of our project supervision department. In the new year, I am determined to continue to carry forward the spirit of Yan 'an's hard struggle, unite and educate employees to study hard, overcome various difficulties, adapt to various environments, carry out supervision work as always, rationally allocate supervisors, better supervise projects, and win benefits and honors for supervision companies.
Self-evaluation of supervision work 3
In August, 20__, our supervision department was appointed by the company to carry out the supervision of the third phase project of Jianye No.1 polis. For more than a year, our supervision department strictly abides by national laws, regulations and various systems, loves and works hard, adheres to the idea of serving the owners, and conducts supervision in strict accordance with design requirements and relevant standards and norms. The results of supervision work satisfied the owner and reassured the company, and successfully completed the supervision task of this project this year.
I. Overview of Supervision Project
1, project name: Sanmenxia Jianye First City-State (Phase III) Project.
2. Project category: comprehensive residence
3. Project address: the intersection of Chunqiu Road and Jianshe West Road, Sanmenxia City, east of Chunqiu Road and north of Jianshe West Road.
4. Employer: Jianye Residential Group (Sanmenxia) Real Estate Co., Ltd.
5. Design unit: Comprehensive Design and Research Institute of Zhengzhou University.
6. Construction contractor: No.4 Construction Co., Ltd., China Construction No.7 Bureau.
Second, the supervision work site
In the supervision of this project, the staff of my supervision department can strictly abide by the laws, regulations and systems of the country, love their jobs, be serious and responsible for their work, and be honest and trustworthy. Adhere to the idea of serving the owner, be serious and responsible for the work, supervise in strict accordance with the design drawings and relevant professional and technical standards and specifications, focus on the working principle of "three controls, three pipes and one coordination", take the project quality as the top priority of supervision work, earnestly do a good job in safe production and civilized construction, do a good job in the coordination of all parties in the project construction process, and successfully complete the supervision task this year.
1, quality control: In the process of quality control, workers follow the principle of quality first. Determine the quality control procedures according to the quality management laws and regulations issued by relevant countries and departments, project contract documents, construction specifications, inspection and evaluation standards and methods related to this project, and design drawings; The quality control method of combining pre-control, in-process control and post-control is adopted to control the quality of input material resources, construction process and engineering products, focusing on process quality control to ensure the quality of sub-projects and unit projects, and then ensure the quality of engineering projects.
2. Schedule control: There are many factors that affect the project schedule. Therefore, the focus of the project supervision organization's progress control is to inspect and evaluate the progress of this project and supervise the construction progress of local projects with construction conditions, so as to eliminate the influence of the contractor's own management level. Mainly take technical measures and contract measures to eliminate the influence of the contractor's own management level, deal with technical problems encountered in the project in time, and create conditions for the construction unit as much as possible; After the supervision instruction is issued, urge the construction unit to increase resource input, improve the construction technology and speed up the construction progress.
3. Cost control: strictly review the quantities declared by the construction unit, cooperate with our company's cost tracking auditors to confirm the quantities on site, strictly control all kinds of visas in the process of project construction, and refuse to handle all unreasonable visa requirements of the construction unit. Since the project started, the bad visa has been zero, and the control of the project cost has basically been recognized by the construction unit.
4. Safety management: "Safety first, prevention first", safe production and civilized construction is a major event in the construction process. Supervise and urge the contractor to carry out safety education and safety technical disclosure for the construction personnel. Strict examination of safety technical measures or special construction schemes in construction organization design is a mandatory standard suitable for engineering construction. Supervise the construction unit to organize the construction according to the reviewed safety technical measures and special construction scheme. In the process of supervision, if hidden dangers of safety accidents are found, the construction unit shall be required to make rectification; If the situation is serious, the construction unit is required to temporarily stop the construction and report to the construction unit in time. Organize weekly inspections of on-site safe and civilized construction, find problems and hidden dangers, and urge the construction unit to make rectification within a time limit.
5. Contract management: After the supervision organization enters the site, the professional contract management personnel of the company will disclose the relevant contracts of this project to the project supervision personnel. The chief supervision engineer shall organize supervisors to familiarize themselves with the relevant contracts of this project, analyze the contracts, fully understand the responsibilities, rights and obligations of the supervision department in project management, clarify the division of labor and cooperation between the supervision engineer and the owner, and carry out the supervision work smoothly. Before subcontractors enter the construction site, the qualifications of subcontractors and personnel shall be strictly examined, so that qualified subcontractors can enter the construction site to ensure the project quality and the performance of the contract. In the process of construction, supervision should be carried out fairly according to the terms of the contract, and the construction unit should be urged to organize the construction according to the schedule to ensure the construction period. The supervision engineer shall examine and approve the progress payment according to the terms of the contract to prevent overpayment. Carry out supervision on behalf of the construction unit in strict accordance with the terms of the contract and supervise the construction unit to carry out construction according to the matters agreed in the contract.
6. Information management: In the process of management, the information management flow is specified, various management systems are formulated, economic measures and contract measures are taken, and the contractor is urged to submit relevant information in time. Using computers and other means to manage all kinds of information provides a reliable basis for the evaluation and decision-making of project quality, progress and investment scheme.
7. The implementation of project supervision has been strongly supported by the municipal quality supervision station and the owner. Relevant personnel of the Municipal Quality Supervision Station often patrol the construction site, and put forward enterprising suggestions and requirements for the quality control of some key parts and key processes, which played an important role in ensuring the engineering quality. I would like to express my heartfelt thanks to the above units!
The above is a summary of my project supervision work this year. My project department believes that under the care of the company leaders as always, with the support of the construction unit and the cooperation of the construction unit, all the staff of my project supervision department will live up to expectations and successfully complete the supervision task of this project, ensuring the company's peace of mind and the owner's satisfaction.
Self-evaluation of supervision work
I. Overall evaluation of work
The year of 20__ _ _ _ _ is a crucial year for the construction of _ _ _ _ _ _ _. The project has many buildings, large area, heavy tasks, few personnel and many things. Looking back on the work in the past year, with the unified coordination of all parties and the hard work and efforts of all supervisors, our supervision work has been respected by the constructor and affirmed by Party A. The project quality has passed the inspection and acceptance of the quality supervision station under the control of the supervisors, and the project quality has reached the design requirements and qualified standards. The overall work was carried out steadily, and there were no quality accidents and safety accidents during the construction, and no casualties. All the work in the supervision process was successfully completed, and won the title of _ _ _ _ "Double Ceremony" site, which won the honor for the company. It saves money and achieves good results.
Second, the project quality
Supervise the construction unit to establish and improve the quality assurance system, carefully check the qualifications and post certificates of the "three inspections" personnel, implement the "three inspections" system for on-site construction, and apply for inspection and approval according to the on-site supervision procedures. The supervisor should divide the work according to the post requirements, highlight the key points, coordinate the work, conscientiously implement the contract requirements and quality standards, handle and solve problems in time when found, ensure the orderly management on site, and strictly rectify the problems that arise. For the problems found in Party A's inspection, corrective measures must be implemented. Deeply realize that quality is not only the final inspection and test after the completion of the project, but also the key point in the construction process, which makes the construction quality problems disappear in the bud.
Quality is not empty, just like progress, it can be controlled by digitalization and quantification. In quality control, we should not only believe in anyone's verbal guarantee, but also believe in a complete quality system.
Third, the progress of the project
Carefully review the commencement report and construction progress plan provided by the construction unit, put forward specific opinions on the progress plan according to the equipment situation, personnel situation and Party A's requirements, constantly check the gap between the actual progress and the planned progress, and accordingly urge the construction unit to increase personnel and equipment, adjust the progress at any time, control the nodes and quantities, adhere to the principle of seeking truth from facts, not reporting too much and not reporting too much, and safeguard the interests of both parties to the contract.
Fourth, investment control.
The overall investment control is normal and orderly, and the design should prevail at all times without making any changes. When changes are needed, the application materials must be approved by the design unit and Party A before implementation. All on-site measurement work must be carried out in the presence of the owner, the construction unit and the supervision unit, and shall not be carried out by itself to ensure the reliability, authenticity and authority of the data.
Five, presided over the supervision meeting, drafting supervision monthly report, audit supervision log.
In one year's work, we always stick to our posts, stay on the production line for a long time, keep abreast of the problems existing in the project, hold regular supervision meetings every week, and solve the primary problems existing in the construction for one week and the work arrangements and plans for the next week, which have played a good role. Party A's documents should be summarized, the construction progress should be summarized in time, and the problems that need to be implemented should be solved through coordination. Conduct safety courtesy inspection and appraisal at the end of each month and draft the monthly supervision report, and use two days to check the supervision log every month to rectify the main problems that do not meet the requirements in the construction records.
In addition to normal work every day, I have to go to the site for purposeful inspection 1-2 times. If there is any problem, record it in the "Inspection Record of Chief Inspector". There are measures to deal with the problem, and there will be inspections afterwards. Can carry out criticism and self-criticism, and boldly express their views at the meeting hosted by the owner, which is respected by the participants. Have a high degree of organization and responsibility, ask for instructions and report to the company in time when encountering problems, so that the whole project supervision can be carried out under the guidance of the company.
Six, seeking truth from facts, strict requirements
Seeking truth from facts is the most appropriate way to summarize the supervision work. Supervision work must seek truth from facts in terms of quality, progress and measurement, objectively reflect the dynamics of the project construction process, truly record the project quality, progress and measurement process, strictly require on-site supervision in the work, and establish a good image of _ _ _ _ _ _ _. We should learn from others' advantages, blame others' shortcomings less, cheer them up, cooperate with our work more, and reflect our work ability and work style in our daily work and life. As the chief supervision engineer, we should always remember the influence of our image on the supervision company.
Seven. Problems and deficiencies
1, should further strengthen the construction site inspection, grasp every detail in the process of project implementation, and play a proactive role.
2, strict supervisors, rewards and punishments, make the whole supervisor team by going up one flight of stairs.
3. In the future, we should communicate with the supervisor more, help them solve problems, avoid worries and better serve the project.
4, often constantly report to the company, strengthen contact with the company, and constantly get interested help and guidance.
5. Read more newspapers and listen to news broadcasts in the future, care about state affairs, keep pace with the times and keep up with the pace of the CPC Central Committee.
6. Strengthen contact with the company and strive for more help from the company. Raise the supervision work to a higher level.
Self-evaluation of supervision work
Entrusted by the owner, the special equipment supervision company undertook the design and construction supervision of Jinzhou 25- 1 South oil and gas field natural gas terminal station of China Offshore Oil Corporation, which is located in _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. This work began in May this year, and the design work was undertaken by Dongying Shengli Oilfield Design Institute, and the supervisors also entered the design institute to start work.
I. Main Scenes of the Project
This project is located in the south of Xianrendao Port Area in the south of Bayuquan District. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Second, the work scene
At the beginning of August, I was hastily transferred to this design supervision work from Tian Jian Baiyou site near Tianjin Port. After receiving the notice from the company, even the luggage of Baiyou construction site was too late to take, so I rushed to Dongying, and then I devoted myself to this work. The design work is divided into several stages, including scheme design, preliminary design (basic design), expanded preliminary design (detailed design) and construction drawing design. After I arrived, I entered the late stage of preliminary design, mainly responsible for the design review of building structures. Because of the heavy workload of drawing design, the preliminary design alone has five thick volumes, but the font is very small, so it is very difficult to read the drawings. But in order to work, we must carefully examine the drawings, correct the mistakes and omissions in the drawings, put forward optimization plans and suggestions, and record them in writing.
After the review of the preliminary design scheme is completed, the original design work will be completed at the end of 10. Due to the delay of the design cycle, the owner agreed to postpone the plan to the middle of 1 1 month. 1 1 At the beginning of the month, the expanded preliminary design drawings were issued one after another. Due to the tight construction period, the extended preliminary design drawings have not been reviewed by internal design procedures, and there are many mistakes and omissions. The workload of drawing review is very heavy. Because of my experience in design work, I can do this job successfully. However, due to my age, it is very difficult to see pictures because the font of the drawings is very small. After checking the drawings, my eyes hurt at the end of the day. I should take eye drops at any time and feel much better. In order to cooperate with the owner's work and complete the task of drawing review within the specified time, sometimes overtime is needed, regardless of remuneration, and the interests of the company and the group are always the most important. 1 1 in the middle of the month, the drawing review of the detailed design plan B of the building structure was completed, and the design supervision work was successfully completed.
Articles related to the self-evaluation report of supervision work:
★ Model essay on self-evaluation of supervision work
★ Model essay on self-evaluation of supervision work (2)
★ Model essay on supervision engineer's work self-evaluation
★ Work self-evaluation of supervision engineer
★ Supervision engineer evaluates himself at work.
★ Model essay on supervision engineer's work self-evaluation (2)
★ 20 19 summary model essay on personal supervision work
Taken the supervision personal work summary model essay 20 19
★ 20 19 supervision personal work summary
★ How to write the teacher's resume self-evaluation model essay?