Summary of intermediate title work 1 I was rated as an assistant engineer in 20XX, and it has been 6 years now. During this period, I was mainly engaged in civil engineering construction and glass curtain wall construction management. Looking back on my six-year experience, I have participated in five events, each of which is a brand-new exercise and an accumulation of experience for me.
In July of 20XX, I worked as a builder in Xinxin Jiayuan Community, Gaomi. This project is a multi-storey brick-concrete structure group project with a total construction area of 6,543,800 square meters. I mainly participated in the preparation of construction scheme and site construction management. In the process of construction, I carefully read the specifications and design drawings, get familiar with relevant technical standards, and truly know fairly well. These experiences have played a valuable role in my future work.
20XX 165438+ 10, as the builder of Qingdao Free Trade Zone Logistics Center Project. During the construction, combined with the knowledge learned by the university, we should start with the basic work, be familiar with the drawings, do a good job in the sub-item construction plan and technical disclosure before construction, and strictly demand in the construction process to put the "three inspections" system in place. Pre-control and process inspection should be carried out in the construction of divisional projects.
20XX 10, I served as the project manager of curtain wall project of Anhui Publishing House, and officially entered the road of project management from here. In this project, I am fully responsible for the progress, quality, safety and cost of the project. There are mainly the following aspects: compiling the construction organization design according to the actual situation of the construction site, arranging the construction progress, compiling and supervising the material plan, formulating measures to ensure the construction quality and safety, organizing the general contractor to carry out the blue prints.the design, making changes and confirming the visa form according to the site situation, sorting out the construction materials and handing over the files, and sorting out the project completion settlement materials. In the two years of this project, my project management level has been greatly improved, especially in the design change visa. The total visa amount of this project is about 6 million yuan, which has earned the company a profit of about 6,543,800 yuan. In the whole construction process, it won the unanimous praise of the owner, supervisor, general contractor and company.
In August of 20XX, I served as the project manager of Greentown Holiday Apartment in Qiandao Lake, Hangzhou, and was fully responsible for the project. This project is an apartment hotel developed by Hangzhou Greentown Group Company, with high quality requirements and tight construction period. With the joint efforts of our project department, the task was completed according to the time limit for a project of Party A. According to the time limit for a project of Party A, the project department made great efforts in the arrangement of construction organization and construction progress plan: firstly, we adopted subsection construction, divided the whole project into five small parts, and arranged the construction team to carry out construction at the same time; Secondly, we arrange the construction teams to carry out flowing construction to shorten the construction period as much as possible; Thirdly, our project department signed a special fund agreement with the company to meet the use of funds for this project and ensure the timely and smooth supply of materials. Finally, I gave the owner a satisfactory answer sheet and successfully won the construction contract for the second phase of the project.
20xx65438+February, as the project manager of curtain wall project of production and research building of Qingdao Institute of Surveying and Mapping. The main contents here include: design drawing review, material processing drawing drawing and ordering, construction team selection and construction management, construction organization design and construction schedule planning, data collation, safety management, design change data collation, and project completion data collation.
In the construction process of the above-mentioned projects, in order to further improve my professional level, I not only do a good job at present, but also use all available time to continuously strengthen theoretical knowledge learning in combination with work practice. In addition to attending business training organized by the company, I also attend related knowledge lectures in my spare time. Frequent exchanges and discussions with colleagues in brother units and visits to some representative projects in Qingdao have not only increased the feelings between colleagues in brother units, but also broadened their horizons.
In addition, while learning professional technical knowledge, I also tried to explore and learn computer software and hardware knowledge, and successfully applied Microsoft Office series office software and AutoCAD series software to daily construction management. Through continuous study and practice, I worked hard to promote paperless management of engineering management materials, complete Word processing with Word, print various record forms and text materials, and exchange more electronic documents. Using Excel to store and analyze engineering information provides quantitative basis for engineering decision-making. PowerPoint is used to make electronic slides for training, and modern multimedia forms are used to vividly explain the knowledge of construction technology and common sense of construction structure, which completely changes the tradition.
The way of education and training makes high-tech and modern technical means really serve production and quality management. Leading the comrades in the project department to skillfully use AutoCAD computer-aided design drawing software and apply it to work not only improves the professional level, but also frees the construction technicians from the heavy burden of drawing by hand with drawing boards and pencils, making engineering drawing extremely easy.
The above is a summary of my main professional and technical work since I joined the work. By combining theory with practice and summing up my own experience, I can finish my work well and successfully complete various tasks. At the same time, it has been affirmed by unit leaders and colleagues. In the future work, I will continue to consolidate and improve my professional knowledge and technical level, foster strengths and avoid weaknesses, and further do my job well.
In a word, after seven years of work, the gains are enormous. As a production builder, I am proud of the construction projects I have done, that is, I have contributed to the society, and I have grown up and matured in technology and management. But I won't be proud, because I still have many shortcomings to improve, such as the proficiency of basic technology, high-tech knowledge, refined management of large-scale project technology, etc., which require me to work harder to meet new challenges.
Summary of the work of intermediate title 2 I joined the work in September of 20XX, and worked in landscape construction enterprises and landscape supervision enterprises successively as landscape construction technicians and landscape engineering site supervision. I cherish my job very much, and I work hard in any position.
I am well aware of the importance of business technology. Only with solid and excellent business skills can we gain a foothold in enterprises and departments. I am constantly studying in my current job, sticking to my post, studying professional skills and improving my business skills; Actively learn advanced scientific and cultural knowledge, keep forging ahead, and integrate theory with practice to meet the needs of the growing cause.
Enthusiastic to work, actively learn business technology from colleagues, learn related business technology and related rules and regulations. From being familiar with drawings to solving specific problems, we are serious, responsible and cautious.
Since I joined the work, especially as an assistant engineer, my technical level and professional ability have been greatly improved and strengthened. In my work practice, I often realize that the professional theory I learned in school is still relatively weak. Therefore, I continue to strengthen my study, humbly consult engineers and scholars with professional expertise, and never miss every opportunity to learn and improve, so that my technical level and ability are constantly strengthened. I majored in landscape architecture. After I joined Nanjing Landscape Architecture Engineering Supervision Co., Ltd., I was assigned to the engineering department, mainly engaged in landscape engineering supervision. At present, I can not only skillfully complete the on-site construction management of landscaping projects, but also skillfully complete the budget and final accounts of landscaping projects. My professional and technical work since I took office is summarized as follows.
First, correct attitude, rigorous and scientific.
Landscaping is a very hard industry. I am an outdoor operator who is exposed to the sun and rain, but I have to work tirelessly in the hot summer and the continuous autumn rain. We used to be called high-level farmers, and we must be able to bear hardships, so we can't do it without an optimistic attitude and a rigorous and scientific work spirit. Although landscaping is far from scientific research, we must carefully scrutinize the drawings and measure and determine the greening area.
Second, carefully scrutinize and carefully verify.
Garden work belongs to a kind of "accurate, detailed and refined" work, so we should make clear our work area and make the landscape and greening meticulous and exquisite. To do this, we must first review the drawings and do this before construction. Be sure to know whether the green area shown on the drawings is consistent with the site, whether there are habits problems in the planted plant varieties, such as designing shade plants in sunny places, or on the contrary, be sure to pay attention to whether the designed seedling size can be found in the market, or whether there are some design loopholes, and the problems shown on various drawings should be reflected and solved in time. It's convenient to work like this. Thirdly, we can refer to other construction drawings. For example, when planting big trees, we can refer to the elevation of garden buildings, which is conducive to the completion elevation and future consistency of planting trees, and can also control the depth of planting big trees and form the slope of leveling the site. Water supply and drainage can refer to the distribution map of drainage wells, and the drainage direction of soil slope can be determined according to the distribution of drainage wells, which is beneficial to the smooth drainage of green space in the future. All the steps are crucial, so we should keep my work attitude in mind.
Third, keep making progress.
Keeping pace with the times is the most precious wealth in my work, that is, I keep learning, making progress, and summing up my own experience. In the past eight years, I have not only made continuous progress, studied and innovated in my work, but also participated in various training courses and seminars, such as cad, 3d, photoshop and cost. With the progress of society and the development of the times, we should constantly appreciate ourselves, make ourselves invincible in this highly competitive society, keep pace with the times, constantly innovate construction techniques and change construction methods with each passing day. Only by adapting, conquering and creating can we not be eliminated by society. Although I have made some progress with the help and support of my leaders and colleagues in recent years, I know that I still have some shortcomings, such as my theoretical foundation is not solid, my business knowledge is not comprehensive enough, and my work style is not mature enough. In the future work, I will strive to do better, strengthen theoretical study, accumulate project experience, constantly adjust my way of thinking and working methods, participate more in design, development and project management, hone myself in practice and become an independent member of the project team. In the process of engineering construction, I can sum up the construction experience in time. Independently wrote papers such as "Anti-seasonal Planting in Modern Garden Construction" and "Talking about Cost Control of Construction Projects".
After years of work and study, I feel that I meet the post requirements and apply for promotion to engineer. Please organize evaluation and review. At the same time, I also hope to use this review as a means to promote my own progress and lay a good foundation for greater achievements in the future.
The above is my main technical work in recent years. Through learning from books, learning from practice, learning from others, plus my own analysis and thinking, I have really made great gains and progress. Achievements and shortcomings coexist, and experience and lessons go hand in hand. I will continue to work hard, overcome shortcomings, sum up experience, learn lessons, do my work better, and further improve my professional knowledge and technical ability!
Summary of intermediate title work 3 I. Resume
I graduated from Xi University of Architecture and Technology, a famous architectural institution in China, with a bachelor's degree in five-year urban planning in July 20xx. After that, I worked in Lianyungang Urban Planning and Design Institute, engaged in urban planning, urban landscape design and architectural design. In 2007, he was appointed vice president of Planning and Design Institute. Has been engaged in urban planning, urban landscape and architectural engineering programs, construction drawing design and related theoretical research, planning and design technology research, and has outstanding performance in "morality, ability, diligence and performance".
Second, political thought and moral quality
First of all, we should actively demand ideological progress, keep up with the pace of the times, seriously study the principles and policies of the party and the state, and understand the latest social trends. Although I haven't joined China * * *, I have always been strict with myself according to party member's standards, consciously accepted the supervision and help of party member and my colleagues, and made unremitting efforts to overcome my own shortcomings and make up for them, so that I can stand the test in the long years to come and join the great cause of China * * * as soon as possible.
As a city planner, I have always adhered to the professional ethics of planners, and tried to find the greatest intersection and balance point among administrative means, developers' interests and the needs of the masses, so that every project I am responsible for is truly pragmatic. Therefore, it is the basic principle of my work to treat every project seriously and attentively. This point has also been unanimously recognized by the planning bureau and hospital leaders.
Since I joined the work, I have a strong sense of ownership, closely linking the development of the company with my own development. I always abide by the company's rules and regulations, actively obey the leadership's work arrangements, successfully complete various tasks, and safeguard the collective honor. Work hard at work, study relevant professional knowledge, sum up work experience and skills, and constantly enrich and improve yourself. At the same time of self-improvement, we also strive to shoulder the burden of "academic leader" of the unit, organize colleagues to summarize exchange projects at ordinary times, help new colleagues enthusiastically, enhance the cohesion of the unit and promote the overall progress of the team.
Third, professional and technical ability.
Since taking office, I have participated in many professional and technical trainings organized by provincial and municipal construction authorities, participated in many annual meetings organized by Jiangsu Planning Society and Planning Association, and conducted many academic exchanges and technical cooperation with Shenzhen Urban Planning and Design Institute and Jiangsu Urban Planning and Design Institute in planning and design projects. I have investigated the urban planning and construction of famous domestic cities such as Beijing, Shanghai, Guangzhou, Shenzhen, Zhuhai, Xi, Qingdao, Linyi and most cities in Jiangsu Province. Through these studies, exchanges and investigations, my academic and technical vision and practical work ability have been greatly improved. At the same time, we also try our best to understand and master the new theories, technologies, methods and norms that are constantly introduced to guide the usual planning and design work and the technical management of hospital projects.
Summary of intermediate title work 4 I graduated from xx University in xx years and xx months. After graduation, I entered xx unit and worked in xx. During my work, I obtained xx professional and technical qualification in xx years and X months. In the past six years, I have been working in the front line of xx. I am diligent, hardworking and conscientious. At work, adhere to the principle that personal interests are subordinate to the interests of the company, regardless of personal gains and losses; Integrate theory with practice, strive for perfection in xx work, study xx technology assiduously, strive to improve the level of business technology, and successfully complete all tasks assigned by the company and leaders. Looking back on the study progress and growth of political and ideological work in the past six years, I summarize as follows:
I. Ideological and political aspects
Through theoretical study, constantly improve themselves, enrich themselves, and establish a correct world outlook, outlook on life and values. In the ordinary work of integrating theory with practice, we should implement the spirit of the 18th National Congress of the Communist Party of China, practice the Party's mass line education practice, practise economy, oppose waste, be honest and self-disciplined, consciously stay away from all kinds of social unhealthy phenomena, resolutely resist the "four winds" issue, firmly establish the work style of serving the people, and maintain a high degree of consistency with the CPC Central Committee politically, ideologically and practically.
Second, the business work
Since taking office, I have been working in xx. I can always maintain a positive working attitude in my work, obey the arrangement of the leaders, and humbly ask the old comrades of the company to enrich my work experience and ability. Be brave in innovation, shoulder heavy burdens, actively learn new technologies, master new technologies and methods through a lot of work practice and apply them to practical work in time to solve various difficult problems encountered in work in time. In addition to doing their job duties well, they also play their own advantages to actively assist other colleagues to complete their work and gradually complete the transition from a newcomer to an old employee. While observing the rules and regulations of the company and departments, actively cooperate with the coordination of departmental tasks, strive to improve work efficiency, go to work early, get off work late, and often work overtime to complete tasks. I went to the enterprises under my jurisdiction for many times to carry out study and practice activities, conducted extensive and in-depth exchanges with enterprises on xx issues, provided on-site guidance on the problems existing in xx work, and provided technical services for production enterprises. At the end of xx, at the request of the company's development under the new situation, I undertook some preparatory work for the new department, mainly responsible for xx. There is no limit to learning the sea. Don't forget to cheer for yourself after work. I actively participate in various professional and technical training and continuing education, such as xxx and xxxx. They all passed the exam and got certificates. Through years of study and work practice, my professional quality and ability have been further improved and strengthened, and have also been recognized by company leaders and colleagues. Xx, xx annual personal assessment continuously rated as excellent, xx annual personal assessment advanced.
The above is a summary of six years' work. Through learning from books, learning from practice, learning from others, and my own analysis and thinking, I have indeed made great gains and progress. Of course, achievements and shortcomings coexist, and experience and lessons go hand in hand. Overcome shortcomings, learn endlessly, and the road stretches under my feet. I will continue to do my best in my work, keep learning, keep improving and improve my business as always.
Summary of intermediate title work 5 Through the concern of company leaders and communication with colleagues, I studied hard and worked hard, and was successively hired as a professional technical post of field assistant engineer, and successively served as a builder, technician and supervisor. Experienced the process of work, study, work and study again. No matter when and where, I always cherish infinite love for my work, constantly consult with an open mind, study hard, and apply my professional knowledge and work experience to production practice in time, and have achieved some good work results.
In terms of political, ideological and moral construction, I have always been conscientious, conscientious and responsible, with a strong sense of responsibility and good professional ethics; In recent years, I have been seriously studying current affairs and politics, keeping up with the party's policies and better implementing the line, principles and policies of the party and the country. At the same time, it also improved their political consciousness, work skills and dedication.
In terms of professional technical ability, I study and verify professional technical theory hard and strive for perfection; In recent years, I have studied General Principles of Civil Building Design, Code for Seismic Design of Buildings, Technical Specification for Exterior Wall Thermal Insulation Engineering, Building Construction Manual, Construction Technology, Quality Acceptance Standard of Building Engineering, Common Problems and Prevention of Residential Quality, Supervision Code, etc. I further broadened my knowledge, improved my professional level, and increased my professional skills, which greatly stimulated my work enthusiasm.
Summary of intermediate title work 6 I graduated from XXXX in July, 20xx, and started working in XXXX in the same year. I obtained the qualification of assistant engineer in 2009, and obtained the second-class constructor on 20 1 1. I have worked in a construction site for 7 years and obtained the corresponding post certificate and relevant qualification certificate. In the past seven years, I have participated in the construction management of several projects. Every project is a new exercise for me and an accumulation of experience. I changed from a young college student to a qualified talent in the construction industry.
Through the concern of company leaders and communication with colleagues, I studied hard and worked hard, and was hired as a professional technical post of field assistant engineer, and successively served as a technician and a field civil engineer. Experienced the process of work, study, work and study again. No matter when and where, I always cherish infinite love for my work, constantly consult with an open mind, study hard, and apply my professional knowledge and work experience to production practice in time, and have achieved some good work results.
Work performance and performance of duties:
20XX July-65438+1 October 20xx June, I participated in the XXXX project, which covers an area of15,000 square meters, with a building area of over 30,000 square meters,1building 18, and building 2/kloc-0.
20XX 65438+ 10–20xx June, participated in the XXXX project, with a building area of 100000 square meters and an area of 50000 square meters. It is a large comprehensive residential area with 2- 18 floors, with many houses and shops, and is responsible for on-site civil engineering management.
These projects have gained a good market reputation because of the efforts of the project team; In the company's annual assessment, he won many personal advanced awards.
In terms of political, ideological and moral construction: I have always been dedicated, modest and eager to learn, professional and dedicated, conscientious and responsible, and have a good professional ethics; Always be upright, honest and pragmatic. Can establish and maintain a correct outlook on life, values and socialist concept of honor and disgrace. In recent years, I have been seriously studying current affairs and politics, keeping up with the Party's policies, insisting on reading news reports and some mainstream media reports, and better implementing the line, principles and policies of the Party and the country through state affairs and people's voices. At the same time, it also improved their political consciousness, work skills and dedication. In addition, I always insist on learning the laws, regulations, rules, systems, norms and standards related to construction projects, so as to be loyal to my duties, abide by the law, be honest and self-disciplined, work hard and constantly strive to improve the quality of work and service.
In terms of professional technical ability: I study and verify professional technical theory hard and strive for perfection; In recent years, I have studied a series of professional books, such as Technical Specification for External Wall Thermal Insulation Engineering, Building Construction Manual, Construction Technology, Code for Acceptance of Construction Quality of Building Engineering, and Code for Supervision. , download from the internet and buy at your own expense. I further broadened my knowledge, improved my professional level, and increased my professional skills, which greatly stimulated my work enthusiasm. With the accumulation of professional knowledge, the increase of engineering achievements and engineering cases, I am more and more confident and proud, which gives me more opportunities to help comrades around me solve professional problems.
In recent years, I have been responsible for reviewing construction organization design, special construction scheme, on-site quality inspection, visa review and other important technical work. By consulting a large number of related documents, referring to other people's engineering cases, combined with my many years of work experience. In the process of construction, I often go deep into every corner of the project, timely and accurately correct the management problems, quality problems and imperfect details in the project, and urge them to make serious rectification.