Wanjiazhai Water Conservancy and Hydropower Project of the Yellow River is located in Tuoketuo-Longkou Gorge, which is a ladder in the middle reaches of the Yellow River.
In the first stage of primary development, the main task is to combine water supply with power generation for peak shaving, flood control and ice prevention, and unify water resources in the middle and lower reaches of the Yellow River.
Play a scheduling role. The main parties involved in the project are as follows.
(1) investors. The investor of Wanjiazhai Water Conservancy and Hydropower Project of the Yellow River is the Yellow River Wanjiazhai Engineering Development Company of the Ministry of Water Resources.
Shanxi Wanjiazhai Yellow River Diversion Engineering Company of Inner Mongolia Electric Power Company. As a representative of state-owned assets,
The capital invested in it according to law enjoys the corresponding asset ownership of the Yellow River Wanjiazhai Water Control Project Development Company. Various investments
The main body establishes the board of directors and the board of supervisors through consultation; Define the directors, chairman, supervisor and chairman of the board of supervisors. According to "China people"
The Company Law of the Republic stipulates that the board of directors appoints the general manager and deputy general managers of the company to make decisions on major issues of the company.
(2) Project legal person. Yellow River Wanjiazhai Water Control Project Co., Ltd. This company is Wanjiazhai Water Conservancy and Hydropower Project.
Legal persons have the right to independently manage assets and be responsible to investors. During the project implementation, the responsibilities of the company include:
1) is responsible for raising construction funds and implementing construction funds;
2) Entrust engineering design, supervision and management;
3) Be responsible for project bidding, make bidding decisions and determine the winning bidder;
4) Prepare and organize the implementation of the annual investment plan, payment plan and construction progress plan of the project;
5) Deal with design changes in engineering construction. If the change affects the engineering design standard and production capacity or needs to adjust the budget estimate,
Report to the board of directors for decision;
6) Organize the implementation of project construction, and be responsible for controlling project investment, construction period and quality;
7) Responsible for the completion acceptance of the construction contract project;
8) Formulate project operation plan and business plan, and be responsible for production preparation and training of relevant personnel;
9) Organize post-project evaluation and put forward post-project evaluation report.
(3) Tianjin Water Resources and Hydropower Survey and Design Institute. Entrusted by Wanjiazhai Water Control Project Development Company of the Yellow River, it is based on
Plan the entrustment contract, be responsible for engineering design, solve technical problems in engineering construction, and participate in project acceptance.
(4) Engineering supervision or manufacturing supervision. Units involved in the construction supervision of Wanjiazhai Water Control Project include Northeast Survey, Design and Research Institute,
Tianjin Water Conservancy and Hydropower Survey and Design Institute, Inner Mongolia Water Conservancy and Hydropower Survey and Design Institute, Shanxi Water Conservancy and Hydropower Construction Supervision Company,
Among them, Northeast Survey, Design and Research Institute is the main body responsible for construction supervision, and the chief supervision engineer is appointed to be responsible for the project legal person; Tianjin
Water resources and hydropower survey and design institute participated in the supervision work and sent the deputy chief supervision engineer. Influence of Wanjiazhai Water Control Project on Construction Supervision
Entrusted by the company, supervise and manage the construction according to the relevant national policies and regulations and the construction contract, including
Control project investment, quality and progress, and coordinate project construction. Participate in mechanical and electrical engineering of Wanjiazhai water control project
The equipment and metal structure are supervised by Tianjin Water Resources and Hydropower Survey and Design Institute and Yellow River Hydropower Engineering Company respectively. they
Entrusted by the Yellow River Wanjiazhai Water Control Project Co., Ltd., according to the relevant national policies and regulations and engineering electromechanical equipment or metal structure.
Purchase contracts, supervise and manage the production process, assist the project legal person to leave the factory or project the metal structure of mechanical and electrical equipment.
Enter the site for acceptance.
(5) China No.4 Hydropower Bureau, China No.6 Hydropower Bureau and Guangxi Hydropower Engineering Bureau. In accordance with the requirements of the construction contract, strengthen
Construction management, within the prescribed time limit for a project, to complete the project to meet the quality requirements.
(6) Harbin Electric Machinery Factory, Tianjin Als Company and Shanghai Hico Company. According to the requirements of the purchase contract, in the provisions
In a certain period of time, mechanical and electrical equipment and metal structures that meet the quality requirements are produced.
(7) Quality supervision project station. Wanjiazhai Engineering Quality Supervision Station is entrusted by the Water Conservancy Engineering Quality Supervision Station of the Ministry of Water Resources.
Trust and exercise the government's function in quality supervision of Wanjiazhai water control project; According to the national engineering quality management policies and regulations
Based on laws and regulations, water conservancy and hydropower management quality standards and regulations, the construction quality of Wanjiazhai water control project is supervised.