The first phase of Metro Line 6 generally runs from southwest to northeast. The line starts from the southern end of Xi High-tech Zone and is planned as Guo Tienan Station. From the High-tech Zone, go north along Xitai Road, Diya Road, Jinye Road, Tang Yan Road and Gaoxin Road, and stop at Laodong South Road. The first phase of Line 6 is mainly located in the high-tech zone, passing through the recent major projects in the high-tech zone: Samsung Electronics, Chang 'an Communication Industrial Park, Xitai Road Business Circle, Entrepreneurial New World and Mutasi Urban Complex.
The first phase of Metro Line 6 is about 20.262km long, with a total of 15 stations (7 interchange stations), all of which are underground stations. There are 1 depot, 1 newly built main substation (located in the slope depot) and 1 control center (located in the control center of Line 4), and the slope depot and comprehensive base are located at the southern end of the line. The project started construction on March 29th, 20 16, and it is planned to put into trial operation in 2020.
The second phase of Metro Line 6 runs from Laodong South Road to Textile City Station, with a total length of 19.8km and 6 stations, with an investment of1436.4 million yuan. The planned construction period is 2065,438+06,2026,5438+0 for trial operation.