The work in the first half of the year has been completed. According to the actual situation of their own work, analyze and evaluate their own work, sum up experiences and lessons, and put forward improvement methods, so as to foster strengths and avoid weaknesses in future work and provide a basis for continuously improving working methods and improving work efficiency in the future.
As a technician, my job orientation is to assist the technical director and constantly enrich myself. In participating in the construction project, while completing the survey and setting out of the project construction, I also assisted the technical director in compiling the construction scheme and technical disclosure, and was responsible for the guidance and compilation of the engineering technical data, conducted on-site quality inspection with the builder, and assisted the safety officer in implementing, supervising and inspecting the safety work on the construction site. In the process of engineering construction, I have always taken my work seriously with a positive attitude, and I can do my duty in all the work in order to complete the task successfully. "Don't rush to make achievements, bury your head in work" is my work motto, reminding yourself not to aim too high, to be down-to-earth, to do more practical things, to test your knowledge in practice and to accumulate experience in the construction site.
The work on the construction site made me deeply understand that what I learned in school, what I learned by rote through norms and procedures, is far from being solid with actual experience. A lot of knowledge can't be learned in books, and it is entirely based on my own experience. In the past six months, I have been reading and studying more. When you meet something different from the book on the construction site, consult the technical director and foreman humbly in time. Although sometimes I can't get a theoretical explanation, it's a good experience. When I first started working, I felt that the technical data work, measurement work and quality inspection work were relatively simple, but I actually learned a lot and always felt that I could. It is only when you actually operate that you find your own shortcomings, often with half the effort and lack of efficiency. Now that we have more practical operations, mastered methods and gained experience, we will be handy. For example, in measurement, it is important to do its key work well. Personally, the key work of measurement is to choose the measurement scheme and carry out retest to avoid human error. In addition, taking the technical disclosure work as an example, it is not simply to write the disclosure, but to give it to the labor construction team for signature to complete the work. However, after the written disclosure is completed, the workers need to be tracked and inspected in the actual construction process. If it is found that the workers have not carried out the construction according to the technical disclosure or not completely, they should be patiently explained and guided to make the partial projects in place, avoid rework, and ensure the construction progress and project quality.
In engineering construction, safety is the main link that cannot be ignored. According to the practical experience in the construction site for half a year, this paper briefly talks about safety. The most important thing is to establish a sense of security. First of all, the managers of the project department must have a strong sense of safety and responsibility. Only when the managers of the project department truly realize the importance of safety can they do this job well. If the management of the project department is lucky enough to do this work, it will be a fatal hidden danger for the safe construction of the project. Therefore, the project manager must understand the safety work from the bottom of his heart and put it into practice.
For the labor service team, the first thing to do is to arrange a safety education and training after the workers enter the site, and at the same time make safety technical disclosure to the labor service construction team. These tasks will not be implemented until they are done. The management personnel of the project department should always check the safety work on the construction site, and strive to completely eliminate potential safety hazards in the bud. In terms of safety, special attention should be paid to the support of the frame and the safety facilities carried or worn by the workers themselves. Regularly supervise and check that workers must wear safety facilities before they are allowed to work on the construction site. In the process of erection of scaffolding, strict inspection must be carried out, and the construction team is required to set up facilities in strict accordance with the construction specifications or procedures to ensure that there are no potential safety hazards. Only after the acceptance of relevant departments can the next working procedure be carried out.
Over the past six months, my professional knowledge has been improved and deepened, and my work ability, including organization and coordination ability, management ability and adaptability, has been greatly improved. More importantly, I have accumulated valuable work experience. The work performance in the past six months has also been recognized by the leaders and colleagues of the project department. In short, in my future work, I will meet new challenges with a hundred times enthusiasm, make progress and maturity in my study, constantly spur myself, enrich my energy, improve my quality and professional level, so as to adapt to the development of the times and enterprises and make progress and growth together with the company. Contribute to the development of Xingtai Group in Inner Mongolia.
2.2022 personal work summary of the builder in the first half of 2022
I came to Henan Kejian Company and was fortunate to be a member of Xijingyuan Project Department of Changyuan City. Although it's only been half a year, the office building 12# is my first project as a full-time builder. Therefore, we should be more strict with ourselves and do this project better with 100% responsibility.
I. Work Completion in the First Half of the Year 20__
The foundation earthwork of Changyuan Cheng Xingyuan 12# office building was excavated on June 12, and completed on June 10. During the period of 165438+ 10, there was little progress in 12# building, and the tower crane installation was completed on 10/26. During the period of 65438+February, CFG pile was mechanically broken due to excessive soil and humidity during excavation, and the pile breaking rate was as high as 90%, and the depth was 2.5m under the foundation pit. Because the design institute's treatment scheme for broken piles was delayed, the backfilling of sand and gravel cushion in the main building could not be carried out. The concrete cushion of the podium and the advanced water stop around the main building have been completed.
Second, the implementation plan for the second half of the year
First of all, let me summarize the main problems existing in 12# building:
1. precipitation: because of the short precipitation time in the early stage of excavation, the precipitation effect can hardly be achieved. In this case, Party A urged the excavation progress to be slow all day. When the excavation was -2.5m below the natural ground, water seepage occurred. When it reaches -7.5m, there is a lot of water at the bottom of the foundation pit. After the foundation earthwork is completely excavated, the failure of well point dewatering is changed to intubation dewatering. At present, the water accumulation in the foundation pit has been well controlled, but the problem of open water has not been well solved. In the foundation pit and the slope of the foundation pit, spring water continuously seeps into the foundation pit. The main reason for the present situation lies in precipitation. As far as I know, the Changyuan area is adjacent to the Yellow River in the south, with high water level and sandy soil. If the sedimentation can't be solved from the root, there is no way to waterproof the cushion and the foundation raft can't be carried out. Conduit dewatering can only intercept the water around the foundation pit and cannot solve the dewatering problem. The urgent task now is to reduce the water level at the bottom of the foundation pit. To sum up, drilling large-diameter wells around the foundation pit and dewatering with high-power sewage pumps can fundamentally solve the dewatering problem.
2. Slope support on the east side of the foundation pit: Because the high-voltage cable in the residential area is buried at the east side of the raft of 12# building 1m, for safety reasons, Party A fails to dig the foundation on the east side in place. At present, Party A can't come up with the excavation plan of the east slope of the foundation, which leads to repeated delays in the construction period. With the support of company leaders, it is decided to support the east slope of the foundation with shotcrete. Because the high-voltage cable is only 1m away from the raft, the east slope is only excavated vertically for shotcrete support. At present, the depth of earthwork excavation on the east side is 2m from the bottom of foundation pit. All excavators, large and small, can't go down to work because there is a large amount of water in the earthwork in the east, which leads to the shutdown of 12# building.
To sum up, I hope the leaders can communicate with Party A more and draw up a detailed construction plan.
3. Collapse of foundation pit slope: During excavation, due to Party A's failure to properly handle earthwork, a large amount of earthwork accumulated on the edge of foundation pit. The stacking height is far greater than the height of 1m specified in the specification, and Party A delays taking away the earthwork at the edge of the foundation pit. Because the load on the edge of the foundation pit is much greater than the load that the foundation edge can bear, the earthwork at the edge collapses and a lot of manpower is wasted. To sum up, I hope the leaders will communicate with Party A on how to deal with the earthwork on the side and how to prevent the landslide on the side.
Third, the actual project progress:
12# building was originally planned to complete the main three floors by the end of the year. However, during the period of 165438+ 10, the installation of tower crane was delayed for one month, and the problems of precipitation and landslide in the later period have not been fundamentally solved, resulting in repeated delays in the project progress. The foundation of 12# building has a buried depth of-7.550m, belonging to deep foundation pit. But so far, we haven't seen the detailed technical scheme of foundation pit excavation and the emergency treatment scheme of major problems. Party A was in a hurry to catch up with the construction period, and did not comprehensively consider various factors, resulting in the present result, which was caused by various reasons. At the beginning of the excavation, if the company leaders can dissuade Party A from continuing the excavation in time, and then carry out the dewatering work, the situation may still be optimistic now.
Fourth, some suggestions for the company:
1, the division of labor of the company's management leaders is too detailed to determine the commander. Company leaders have different suggestions for 12# building, which cannot be unified, leading to blind construction in construction. It is hoped that the leaders of the company will discuss and analyze the problems found in the 12# building in the next year's work, and draw up a detailed construction plan, instead of blocking the enemy and covering it with water.
2. Buildings1to 8 have entered the standard floor, and the construction is not difficult. The 12# building is now in a shutdown state. I hope the company leaders can pay more attention to how to solve the problems of precipitation, landslide and excavation on the east side slope.
V. Direction of efforts in the second half of 20_:
On the other hand, the problems faced by 12# building are worth studying and learning. This will also be my valuable experience accumulated in 20__ years. In the new year, learn more relevant knowledge and turn these experiences into your own abilities. Continue to expand your knowledge and learn ways to solve intractable diseases. In the direction of efforts next year, I will move towards a competent foreman.
3.2022 personal work summary of the builder in the first half of the year
I graduated from Yinghai Group in 20 years 10, and it has been nearly half a year. Over the past six months, I have experienced a lot and gained a lot of experience and lessons. Thank the company leaders for giving me the space, courage and confidence to grow up. In the past six months, I have made some achievements in my work through my continuous efforts, but there are also many shortcomings. Looking back on the past six months, I summarized my work as follows:
I. Work situation
(1) After I came to the Group, my work was mainly divided into the following two stages:
1, 20__ of X-X month, which is the internship stage in rotation. During this period, I worked in Lijin Industrial Park Project Department, Shengli Cement Company, Commercial Mixed Group of Central Laboratory and Shengli Commercial Mixed Station successively. Through this rotation internship stage, I have a certain understanding of the industries involved in the subsidiaries of Yinghai Group, especially the rotation internship in the project department of Lijin Industrial Park for nearly one month, which enabled me to have the ability of on-site construction.
2.20 Since X, according to the arrangement of the leaders of the Human Resources Department, I was stationed in the technical department of Shengli Oilfield Yinghai Construction Co., Ltd., and was sent to the project department of Lijin Industrial Park on X, which was mainly responsible for the on-site construction, data collation and safety of the cement transfer warehouse at the construction site of Lijin Industrial Park.
(2) Since the establishment of the post, I have participated in the following main tasks:
1. Supervise the steel structure construction of sand and gravel shed in Lijin Industrial Park.
2. Responsible for the construction site and quality supervision of fly ash in Lijin Industrial Park.
3. Design, drawings and budget of the fine stone scale of Shengli commodity mixing station.
4. On-site command of earthwork excavation, formwork making, concrete pouring and bridge cover prefabrication of bridges and culverts on the west side of Lijin Industrial Park.
5. On-site supervision and technical guidance of civil engineering of cement transfer station in Lijin Industrial Park.
6. Material budget and material declaration plan of 6m, 8m and 10m material tanks attached to cement transfer station.
7. Material declaration and site construction of drain ditch in Lijin Industrial Park.
8. Material declaration and site construction of the west gate of Lijin Industrial Park.
Second, shortcomings in the work.
These days, although I can complete the tasks assigned by the company leaders, there are still many shortcomings.
1, professional knowledge cannot be applied to practical work flexibly and systematically.
I learned a lot of theoretical knowledge in college, but the actual work is often complicated and changeable. Whether theoretical knowledge can be combined with practice is the key to the successful application of professional knowledge. In the future, I will strengthen the research on the actual situation, learn from experienced teachers, communicate with workers more, try to grasp the actual situation, and try to apply my professional knowledge to practice correctly and effectively.
2. On-site coordination ability needs to be improved.
Since I graduated in July and came to our group, I have spent most of my time in the project department of Lijin Industrial Park, and my main job is to be responsible for the construction site. Most of the people I come into contact with at work are migrant workers without professional training, and their work skills and cultural quality are generally low. So I will try my best to improve my coordination ability and make the field work orderly.
3. Interdisciplinary knowledge is not extensive enough.
In actual construction, a lot of professional knowledge is often involved, and every point will affect the progress and quality of construction. Therefore, mastering all kinds of knowledge involved in actual construction is of great significance to the quality and progress of the project. In the future work, I will try my best to broaden my knowledge, master as much knowledge as possible, and become a comprehensive talent.
4. Summary of the personal work of the builder in the first half of 2022
The project department organized filming, and 20 years are coming to an end. Stop and look back. I've been working for almost half a year. It's the end of the year and I want to sum it up. It is unwise and terrible to do it without stopping to think! People can grow better in adversity and sum up experience.
It is still very useful for our present work to report to the company in July, with a week of pre-job training and then a month of professional training. As I wish, the power distribution project department arrived at Fuzhou 03 Bid Section and returned to the city where I lived for four years. This hot land makes me feel more cordial. Coincidentally, graduation design is the main structural design of Doumen Station. Of course, our design is a mess for professionals.
In the last four months of my life on the construction site, I completed the process of changing my role, adapted to the life on the construction site, got enough exercise, improved my working ability, accumulated some work experience, gradually understood the operation mode of the construction site, and learned to cooperate with my colleagues to complete tasks and lead the project construction. I will summarize this year's work in three stages.
(a) in the loss stage
My first month in the job is my vacancy period. Like most newcomers, I knew nothing about my job at first. My personal feeling is that I don't know what to do when I graduate. The teacher's advice is to talk less and do more, and ask if I don't understand. I adhered to this principle, but found that I really didn't know where to learn and where to work hard, because I was not assigned a task at that time, and we couldn't undertake any work, so we lost it. Later, we arranged for three colleagues to study the shield first, check the segment quality in the shield tunnel every day, see how the workers assemble the segment, check the segment damage, and then do some information. Then go to the measurement class for a month, and finally go to the laboratory for half a month.
I really don't like this state. I want to find my own foothold and study hard. At first, I still had a lot of leisure time. I should read more materials and be familiar with the drawings. At this stage, I didn't pay close attention. For those of us who have just joined the work, it is very important to study hard, grow up at an early date and lay a good foundation for the follow-up work. Just like in school, I don't lack thoughts and consciousness, but I don't do enough practical actions. Utopia is unrealistic. After nearly a month, the harvest can be summarized as follows: I am familiar with the work and life of the project department, understand the progress of the project, and learn to make some materials.
(2) Career planning
The train station was short of people, so we were transferred to the train station while we were still measuring. At the beginning, there was no specific task, so we just looked around the construction site and then looked at the information we brought. Then the tutor took the apprentice, and I became the apprentice of Manager Xie and began to send workers.
Working during the day makes scheduling easier. I know that scheduling is not simply called digging machine construction, but it is as simple as arranging workers to work. As a dispatcher, you should have a global vision. Especially when many processes cross, how to arrange the sequence of several things is particularly important. Only by coordinating all the work well can we ensure the orderly and efficient construction and avoid unnecessary troubles.
Start working late, start working with colleagues, and slowly learn how to arrange work. Later, I worked the night shift alone, and planned my work in advance before going to work: materials, personnel, machinery, time, venue, is everything ready? Most of the time, I am the only manager on the construction site all night. I complain that there is no one on the night shift, I don't need tools, I don't come back every day and I don't want to go. Really feel pressure, afraid of making mistakes, always be careful and try to make things end smoothly and perfectly. In fact, this mentality is not suitable for new employees. It is impossible not to make mistakes at work. Something happened. I became brave. It is a sign of maturity to have an upward attitude and how to solve problems actively.
I never feel superior. I don't feel inferior to others. I have no sense of superiority at work. I know I learned very little in college and I have no work experience. So as a novice, I don't mind doing some manual work. In June165438+1October, the construction site was covered with mud, and the transportation of construction waste mud became the key work. I'm not a bystander, I'm a manager and I'm a worker. I took it and pulled the pipe with the master worker. I don't mind being covered in mud. The mud pump is always out of order, which makes me very angry. If things don't go well, I'll give birth.
I am not happy, but I am not committed to checking and troubleshooting. This is my immature performance. After suffering, I have a sense of relief, but I am glad that it has brought me exercise and growth.
(3) Full-time technical personnel
/kloc-construction management of underground continuous wall began in mid-February. I have paid attention to pipe trench construction before, and I have also seen drawings and learned relevant technologies. When I was a dispatcher, I felt a deep thing: at that time, a leader asked me how many main holes and auxiliary holes were drilled in the underground continuous wall. I can't answer it. So although I am also learning the technology of underground wall connection when I am doing dispatching, I am only an amateur technician. Now as a full-time technician, I have the opportunity and enough time and energy. I must do it well.
Not satisfactory, there are many problems, even the wall is not that easy. Every day, you should know the groove forming situation and know the groove forming progress like the back of your hand. The processing of reinforcement cage of underground continuous wall does not meet the requirements, or even is not ideal. Our management is not strong enough, it is difficult for workers to manage, and the requirements of technical disclosure cannot be met. Slowly, I talked to the workers more and became familiar with them. They are more willing to cooperate with our work and the situation has improved. Therefore, how to better communicate with workers' masters is a very important aspect. As a construction unit, we are the owners, managers and service providers of subcontractors, providing them with good construction conditions, solving problems for them, cooperating with each other, and carrying out construction more efficiently and smoothly. This is the ideal state of cooperation.
I am a novice at work and should be proactive. Learn from predecessors and leaders; Learn from colleagues; Learn from the workers' master. On the one hand, learning and mastering theoretical knowledge; On the other hand, learn construction technology and sum up experience in practice. Integrate theory with practice, and guide and promote construction with theoretical knowledge. Integrate the learned knowledge into our specific work.
During this time, I deeply realized the responsibility of a builder, and at the same time realized my own shortcomings in my work. For the builder, it is necessary to know the daily work content. The website is a place where one's ability is extremely tested. In this half year's work, I have gained a lot. I not only learned the relevant construction technology, but also improved my management and coordination ability, and greatly improved my communication ability with people at all levels.
I will work harder and grow up at an early date! Make yourself a strong builder!
5. Summary of the personal work of the builder in the first half of 2022
In the past six months, I accepted the arrangement of the project leader, and served as the site builder of the first district of Shenmu Jin Lan Community. My work is summarized as follows:
In August, I mainly strengthened the study of relevant theories and charged myself in time. I didn't forget to study when I was working at ordinary times. I studied hard in my spare time, so that I had a basic understanding of construction drawings, related standard atlas and construction technology-related management norms, and participated in the constructor exam organized by the company this month. Familiar with the working environment on site, have a good relationship and communication with labor service, supervision and Party A.. From September to June, 5438+00 served as the concrete foreman in 1 area, having a basic understanding of site management, understanding of pre-management procedures, understanding of daily work tasks and processes, participating in the collection of template acceptance and countersignature sheets before concrete pouring, as well as personnel execution and on-site vibrating equipment inspection. In the process of concrete pouring, pay attention to the pouring sequence of concrete, the correct pouring of each part, the control of vibration, elevation and slump, the lien of test blocks and the protective measures in different weather. After the completion of pouring, uniform curing and roughening must be carried out, and the appearance of the poured concrete should be checked and repaired, and the internal data of the concrete engineering inspection lot should be prepared in time. In addition, in September, we began to check and record the measured quantities of the main body of 13# building, and by the end of June, 1 1. 165438+1early October, the parapet, machine room floor, post-pouring belt and sling components of 13# building were successfully capped. In the later period, it mainly collates the measured quantities, concrete receipts, concrete quality control data and inspection records of garages and basements in 1 area. In February, 65438, at the request of the leaders, a special plastering construction scheme was formulated.
Half a year is neither too short nor too short, and I have a preliminary understanding of my work. First of all, I have the basic management methods and processes as a concrete foreman, and have a further understanding of the control of concrete construction process. At the same time, in the later statistical process of internal data, although the data collation is not complicated, it is the most time-consuming, which not only honed my character well, but also gave me a clear understanding of the overall situation and details of the whole project.
Half a year has passed, but I still feel that I have only learned some introductory things, but I am still not serious enough. Although I didn't forget to charge myself in time for half a year, I only learned nine Niu Yi hairs. So in the next year, I will carefully supervise myself, go to work on time, and complete the tasks assigned to me by my leaders every day. I hope the leaders can continue to strengthen their supervision over me, so that I can always reflect on myself and live up to everyone's expectations.