1. Self-evaluation of the project manager
I am a 20xx fresh graduate of sichuan college of architectural technology, named Pan Hong, from Bazhong, Sichuan. I majored in construction engineering (infrastructure direction) in the Civil Engineering Department of Sichuan Jianzhu University, but the infrastructure was only half a year, and my grades were not bad during my school days. He was once rated as an "outstanding graduate of the college" and an "outstanding student cadre" by the school, and won two third-class scholarships, a second-class scholarship 1 and a national grant 1. At the school job fair, he was hired by the grass-roots branch of the Seventh Bureau of Zhongshui. Because the school organized graduation practice, I worked in the unit for 4 months, and the conditions were good. I just worked in the field for many years, so I couldn't reunite with my family and lost contact with the outside world. During these four months, I think I have worked hard and can overcome the difficulties in my work. I was once considered as a "very useful intern" by the project manager, and my salary during my internship was 2000 yuan/month. As a result, I worked in the unit for two months and then I was promoted to a technician.
Personally, considering that the hydropower industry is not my major, I also love my architectural engineering major very much and don't want to give up, so I sincerely apply for a job with your company. I believe: I can be competent for the housing construction work your company is engaged in, and I hope to get your approval.
2. The project manager self-evaluation
Many years of experience in large-scale project construction site management, responsible for engineering technology, progress, quality, cost and safety management. Familiar with building construction specifications and acceptance specifications; Be familiar with the whole process of project operation and master the technical requirements of various projects. Can effectively organize, lead and coordinate the work of the general contractor and subcontractors, strictly fulfill the contract requirements, and complete the set quality, schedule and cost targets. Love my job, set an example, and have strong team coordination and management skills. Hold the intermediate title of architecture major and obtain the national first-class constructor qualification certificate. Proficient in using autocad and office series office software. I am rich in knowledge, excellent in self-regulation, healthy and able to maintain a good working condition for a long time. Indifferent personality, growing up in a military family, with strong self-discipline and team consciousness. Serious and responsible work attitude, and strive for perfection when performing post responsibilities. I have worked in China Construction No.1 Bureau and China Construction-Dacheng Company. I have been engaged in the field management of general contracting for a long time, familiar with the project management process of general contracting, general contracting and supervision, and have a deep understanding of construction organization, construction technology, communication and coordination.
In 20xx, I passed the first batch of national registered first-class construction engineers, and strived to become an excellent project manager, reflecting my own life value. From 20xx to April 20xx, I worked in Beijing Construction Engineering Co., Ltd. as a technical worker in the project department, mainly involved in bidding, drafting scheme and disclosure, drawing on-site construction drawings, negotiating, dealing with supervision and Party A, and making as-built drawings. 20xx has been working as a field civil engineer in the construction of an electronics factory since April.
I have been working in the construction field for nearly 20 years, from initial maintenance and leakage construction to supervision of advanced decoration, high-rise buildings, municipal roads and bridges. I have worked as a clerk, builder, deputy project manager, project supervisor and project director in the infrastructure department.
3. The project manager self-evaluation
It has been four years since I started to work as the project manager of the architectural decoration company in May of 20xx. I have experienced a lot in recent years, and I have never felt pressure before. For this reason, I have changed a lot, groped forward step by step in the competition, and constantly summed up and learned lessons. First, strengthen study and improve their own quality.
As a recruiter in the decoration industry, I know that my professional knowledge and quality are far from the requirements of the company. Therefore, I pay attention to the study of relevant knowledge of decoration industry in my daily work, and read and studied books such as Decoration Construction Manual, Project Acceptance Standard and Project Manager Management Manual. While learning from books, I also humbly learn from colleagues with high professional level around me, so that I can ask questions if I don't understand, accumulate them bit by bit, and gradually improve my theoretical and professional level. Now I can basically meet the requirements of my work.
Second, extensive publicity has established the company image.
With the help of my extensive contact with the outside world, whenever I go to a construction site, I will introduce the strength, personnel quality, performance and development trend of the company to the leaders of Party A and the surrounding staff, so that they can understand the company as comprehensively as possible, gain their trust at the same time, establish long-term contacts and effectively promote the smooth development of the work. During my tenure as project manager, I started from strict self-discipline, and asked my subordinates and construction workers to pay attention to their own image at all times, reminding them that everyone's words and deeds represent the company and can't win personal interests at the expense of the company's interests. Even if you are wronged, you should be patient and not contradict Party A. Through a series of work, the company has maintained a good image and left a deep impression on its customers.
4. The project manager self-evaluation
I have been a software development project manager for 5 years. I often hear from other colleagues that the needs of their customers are going to change again. Moreover, when the demand analysis was done at that time, the customer did not put it forward, and the equal difference was put forward before it was ready. If you want to modify the database, but this topic was not considered when designing the database at that time, it will take a lot of time to modify the database and increase the development cost. If it is not revised, the project can't be completed and the money can't be collected. Or the software has been used for a while, and the response is very slow when using some query functions. As more and more data are recorded, these query functions will become slower and slower. If we want to solve this problem, we must modify the database. It is very painful for software development to modify the database.
Therefore, the design of database is very important. A good database can meet the emerging needs of customers, and I am very familiar with the design of the database. ...
As for the software interface, I think it is because many operators are not good at using it, and the software interface is too complicated, which will make it difficult for operators to get started. I don't know where to start. Increased the difficulty of implementation. In my opinion, a successful software should be able to operate as soon as the user interface is opened without training.
5. The project manager self-evaluation
My name is xxx. I am 29 years old. I graduated from the Computer Science and Technology Department of Huaqiao University in July, 20xx. After graduation, I was hired by Xiamen Lee Tae Technology Co., Ltd. to develop j2ee enterprise information management system. At present, I am a project manager, responsible for leading a small team of 3-5 people to develop the system. Since joining the work, I have independently or presided over the development of 10 enterprise information management system. Among them, the charging card management system of xx Electric Power Co., Ltd., the human resource management system of xx Group and the mobile office management platform have been well received by users since their operation, saving labor costs and improving work efficiency for enterprises.
I have a strong interest in software development. I often study technology after work and pay attention to the development trend of it technology. In-depth analysis of business requirements and comprehensive consideration of the operability of the client interface. Up to now, I have grown from an apprentice to a member of the project team, and now I am a project manager. The promotion in recent years has given me the ability to independently develop the system, and I have been rated as an excellent employee of the enterprise for two consecutive years. This is not only because of my long-term efforts and eagerness to learn, but also because of the patient teaching of leaders and masters.