Sample of construction tender
first part
tgxxb0 13
20 12/3/4 Sunday
bid guarantee
Dear Owner-Shanghai Xu Qiang Real Estate Co., Ltd.
I am very glad to gain the trust of your company and have the opportunity to participate in the bidding competition for quality supervision services in the construction stage of Johnson Garden Phase II project. No matter what the bidding result is, I would like to express my heartfelt thanks to your company for its friendliness.
Our company promises as follows:
1, safeguard the interests of the owner and assist the owner in project investment management and project progress coordination.
2. Our company relies on the Architectural Design Institute of Shanghai District and County Industrial Administration Bureau to actively assist the owner in the expansion of this project and the joint review of construction drawings, and put forward reasonable suggestions on the project from design to construction and future management with a positive attitude.
3. Our company will set up a set of supervision team with both technical theoretical knowledge and engineering practice experience, and complete supporting facilities for each major to enter the site, implement all-weather and all-round follow-up supervision, strictly implement supervision procedures, ensure that the personnel of the supervision team are relatively stable, and do not arbitrarily change personnel without the consent of the owner.
4, on-site supervision personnel must abide by the supervision rules and regulations, it is forbidden to introduce subcontractors and building materials suppliers to the construction unit. It is forbidden to ask for property from contractors and material suppliers. Once found, it will be removed from the list.
5. Computer-aided management shall be implemented on the project site, with timely information, complete information and complete classification and filing. In order to ensure the excellent quality objectives of this project. Our company will learn new specifications, new standards, new materials and new technologies from the project site supervisors in terms of management and technology to improve the supervision level. In order to ensure the smooth completion of this project, our company will strictly fulfill the supervision contract and related commitments, and repay your trust with quality service.
Brief List of Bidding for Construction Project Supervision (Construction)
Project name:
Supervisor
A group of people
Brief introduction of chief/deputy chief supervision engineer, brief introduction of safety supervision and additional work of supervision fee.
reward
Yuan/day * person extra work
reward
Yuan/day * person
Name/age/
Major/Gender Title/General
The supervision certificate number shall be sent to the construction site every week.
Time (Lower Limit) Name/Age/Professional Title/Gender ID Number
9 cases
Jianhe Bohang
59 years old male construction engineer.
Hu Jian Jian Zi 1495 Shi Jinlong
57 years old engineer
Hu Nan 'an Jian Zi 1 165 No.580,000 Yuan 120 120
assistant
total
Jianxiongyao
36-year-old worker and civil engineer
Jian (Hu) Gong Jian Zi No.980640 3
At the same time, the director of other projects' construction supervision and other explanations:
not have
Description:
Bidder: (Seal)
Legal representative or entrusted agent: (seal)
July 2006 5438+0
Comprehensive description of tender documents
Our company is honored to participate in the construction quality supervision and bidding of the second phase of Johnson & Johnson Garden at the invitation of Shanghai Xu Qiang Real Estate Co., Ltd.
I. Company Profile:
Shanghai Jisheng Construction Supervision Co., Ltd. was established in 1995. Approved by Shanghai Construction Committee, a construction project supervision enterprise with temporary Grade B qualification. Its predecessor was the Supervision Department of Architectural Design Institute of Shanghai Suburb Industrial Administration. The supervision company has the supervision and engineering technical consultation to undertake all kinds of industrial buildings, civil buildings, public buildings, decoration and other projects, and has the economic and technical strength to undertake all kinds of supervision business.
At present, there are 39 professionals in the supervision company, including senior title 10, intermediate title 15 and junior title 10. At present, there are 6 national and Shanghai registered supervision engineers and 8 supervisors/kloc-0. The supervision company is backed by the architectural design institute of the investment unit, with strong technical force.
Over the years, relying on the architectural design institute, the supervision company has given full play to its technical advantages, adhered to the unit purpose of being scientific, fair, honest and realistic, and carried forward the unit spirit of pioneering and innovative, diligent and dedicated, and serving users, and has successively undertaken a series of supervision services for residential buildings, workshops and large-scale decoration projects. The project supervised by the company won the "Pujiang Cup" in Shanghai for many times, and successfully completed the supervision work entrusted by the owner, which was widely praised by the owner.
Second, the supervision outline (technical standard):
1, the preparation of technical targets is based on the work scope and service content of construction supervision specified by the tenderee in the tender documents, focusing on the supervision of engineering quality, safe production and civilized production, so as to ensure that the engineering quality target reaches the excellent level or above and the safe and civilized production on the construction site reaches the standard.
2. Because of the scope and service content of construction supervision stipulated in the tender documents, the tenderer did not entrust the supervision unit to provide investment control (measurement of qualified projects) and schedule control services. Therefore, these two control measures are not compiled in the technical tender, but in the actual supervision work, we can cooperate with the owner to do a good job in the measurement of qualified projects and the coordination of project progress with a positive attitude.
Three. Description of business standard:
1. The calculation basis of supervision fee is stipulated in document No.0200 of Shanghai Construction Management (95).
2. If the scope and service content of supervision are small, our company can provide free service for the owner.
3. Because the project cost is temporarily priced, the supervision fee is also temporarily collected. After the project cost is formally determined, the supervision fee shall be calculated in proportion to the actual project cost.
Four, supervision company:
1, the company carefully studied the terms in the contract and thought that the contract was clear and the responsibilities were clear. Our supervisor resolutely performs the responsibilities stipulated in the contract according to the supervision contract in his work.
2. If the supervision time is prolonged and the project cost is increased due to reasons other than the supervisor, if the extension time is shorter and the project cost is less increased, our company may not increase the supervision cost. If the extension time is longer and the project cost increases significantly, our company will negotiate with the owner in accordance with the relevant provisions of the contract and in the principle of mutual benefit and not lower than our company's cost price.
5. Please ask the owner to provide two offices and supervisors' dormitories, about 40 square meters, with a telephone. Other supervision office facilities and common equipment are provided by our company.
Supervision outline is the guiding document of supervision work. After the signing of the supervision contract, our company's supervision team stationed in this project will carefully, concretely and in detail prepare the supervision work plan and the detailed rules for the implementation of supervision work in various disciplines, strictly supervise the work procedures, closely cooperate with the owner, and urge the contractor to ensure the safe, timely, high-quality, low-consumption and successful completion of the construction task of this project.
technology standard
Project overview
1. Project Owner: Shanghai Xu Qiang Real Estate Co., Ltd.
Two. Project Name: Johnson Garden Phase II Project
3. Project construction site: Tianyaoqiao Road 1 162.
Four. Project construction scale, construction area: about 32,500 square meters, structure type: frame-shear wall/brick-concrete.
Verb (abbreviation of verb) Project cost (tentative): 44.96 million yuan.
Intransitive verbs Source of funds: self-raised funds.
Seven. Architecture overview:
This project will build an eight-story building, a nine-story building, two eleven-story buildings and two twenty-four-story buildings, and build an underground garage.
Eight, engineering characteristics:
1. The project is adjacent to a gymnasium and has great social impact.
2. This project is a single-line conjoined building with a long length. The construction site is long and narrow, and all transportation and service vehicles in this project only rely on one entrance and exit of Tianyaoqiao Road, so it is necessary to coordinate the whole project site management to ensure the smooth flow of all kinds of vehicles.
3. The greening of the whole community, the control of roads and pipelines is complicated, and the landscape requirements are high. In the phased and multi-type construction of the whole community, it is necessary to do a good job in the whole process and overall unified coordination of engineering quality monitoring.
Based on the above characteristics, our supervision company should focus on overall control and help and support the general contractor to manage the technology, measurement, quality, progress and materials of the whole project in a unified way. Strictly prevent subcontractors from acting in their own way, not giving way to each other, and affecting the overall situation. Once this symptom occurs, you should stop taking the medicine in time.
Nine, the construction period:
The planned commencement and completion date of the project is from August 5438+0, 2006 to February 30, 2003, and the construction period is 29 months.
Scope of supervision work
Engineering supervision includes construction stage, completion acceptance and warranty stage, safe production and civilized construction.
The construction phase includes:
A, foundation and foundation all underground engineering construction stage.
Second, the main structure construction stage.
Third, the construction stage of the construction equipment installation project.
Four, a building decoration, roofing engineering and floor and door and window installation engineering stage (excluding the second fine decoration).
Fifth, the overall construction stage of the community.
Six, the completion acceptance stage.
Construction supervision service content
A, the construction stage quality control:
1. Attend the qualification review meeting of the general contractor and subcontractors, and provide relevant review reports to the construction unit after reviewing the construction quality and management ability.
2. Digest carefully, be familiar with the construction drawings and relevant design specifications, and understand the design requirements. Review drawings for errors or unclear expressions, and understand key parts of the project and construction difficulties. And do a good job of design disclosure and blue prints.the design.
3, to participate in the construction site coordination meeting, to assist the construction unit to do a good job of coordination between the construction unit, testing unit, pipeline department.
4, assist and cooperate with the construction unit drawings, design, provide relevant information, assist the construction unit to the relevant departments of the municipal government for project declaration procedures.
5. Supervise the contractor to establish and implement the construction and quality assurance management system, and put forward improvement suggestions to the contractor in time.
6. Review the construction organization plan, construction technical plan and site layout of contractors and subcontractors, put forward suggestions to the construction unit, and urge the implementation after approval.
7. Review the quality of raw materials, semi-finished products, finished products, samples and equipment used in the project. It is strictly forbidden for contractors and subcontractors to use the above four types of unqualified Jian 'an materials and equipment. Put forward suggestions for testing and replacement to the construction unit when necessary. Review the manufacturer's qualification and product certificate before the materials are sent to equipment orders. After materials and equipment enter the site, do a good job in site acceptance.
8. Supervise contractors and subcontractors to conduct material tests regularly and submit reports on time. Do a good job of witness sampling of materials.
9. Strictly urge the contractor to carry out construction in accordance with specifications, procedures, mandatory standards, contract conditions and design requirements, so as to achieve excellent quality. Often go to the site to check the implementation of quality assurance technical measures.
10, check the construction quality of all divisions (including hidden parts) of the project, and record the acceptance results. If it is unqualified, it is forbidden to proceed to the next related process and report to the construction unit in time.
1 1, implement the national construction and installation quality inspection report system. Strict requirements of the construction unit in accordance with the provisions of the quality inspection procedures to fill in. Professional supervision engineers should review and identify the relevant construction quality statements submitted by the construction unit.
12, design changes (including technical changes of the construction unit and modification opinions of the owner and supervisor on the design) shall be recognized by the design unit.
13, the supervision engineer will sign all kinds of design changes, and should focus on checking whether there is any adverse impact on the project quality. If adverse effects are found, the supervision opinions shall be clearly put forward, and a written report shall be made to the construction unit when necessary.
14, assist in handling disputes and claims caused by quality accidents, and put forward handling opinions. In case of any dispute between the construction unit and the supplier on the causes of damage to materials or equipment during the construction, the supervision unit shall assist in mediation.
15. Organize the contractor to carry out periodic project inspection and preliminary inspection in time, submit the project construction quality evaluation report and construction defect repair form, urge the contractor to carry out repair and re-inspection according to the form, and submit relevant project quality records and inspection evaluation reports to the construction unit on a regular basis.
16, urging the contractor to submit and review the testing and debugging scheme of electromechanical engineering and equipment. Organize the implementation of testing and debugging, and submit a report to the owner.
17, according to the time agreed by the construction unit and the contractor, urge the contractor to finish the finishing of the completion documents and technical files on time.
18, urging the contractor to report to the quality supervision station for inspection.
19. assist the construction unit to obtain the use and operation license of the completed property and related documents.
Second, the warranty phase quality control:
1, during the warranty period, keep in touch with the construction unit, pay a return visit according to the notice of the construction unit, identify the responsibility for quality problems, and urge the contractor to carry out warranty and reinspection in accordance with relevant specifications, standards and engineering contract requirements to achieve the specified quality.
2. During the warranty period, submit the final quality summary report to the construction unit according to relevant documents and standards.
Third, the contract management:
1, construction stage:
According to the needs of the project progress and the requirements of the owner, send the project leader or contract leader to attend the relevant meetings of the project, and keep close contact with the owner's on-site representative to make quick feedback on the owner's decisions and requirements.
To provide consulting services on laws, decrees, regulations, rules, standards, norms and practices related to engineering contracts and engineering quality in China and Shanghai.
Provide the owner with relevant information about the engineering contracts and projects issued by the China and Shanghai municipal governments and relevant units.
2, the completion warranty stage:
Assist the owner in handling contract disputes or claims in the process of construction and completion settlement.
According to the relevant regulations and practices of China and Shanghai, provide consulting services for the outsourcing project cost in the process of project settlement and final accounts.
Four, construction safety and health (including civilized construction):
1, to assist the general contractor to strengthen the scientific management of production safety from the rules and regulations and organization; Carry out the national principles and policies on building safety management, and implement a management system that combines professional management with mass management, supervision and inspection.
2. Supervise the general contractor to improve the safety production system, responsibility system, management system, inspection system, education system, regular meeting system, statistics and analysis report system.
3, review the construction organization design, construction scheme, and at the same time, review whether there are safety technical operation procedures.
4, on-site supervision, found that the security risks, should urge the relevant personnel to solve within a time limit; Supervise and urge the general contractor to implement the government's regulations on civilized standards on the construction site, conduct inspections, and urge rectification.
Verb (abbreviation of verb) information management;
1, cooperate with the collection, sorting and preservation of all kinds of data of this project.
2. Use computer to control the progress, quality, investment and safety of this project, provide information services about this project to the construction unit, and provide various supervision reports on a regular basis.
3. Attend the project meeting.
4, supervise the construction, monitoring, testing, materials and equipment suppliers to submit the specified engineering technology and operation data in time.
Six, organization and coordination:
1. Organize and coordinate to sign a contract with the construction unit, cooperate with all units involved in the construction of this project, and assist the owner in handling related matters.
2, urge the general contractor to coordinate the relationship between its subcontractors.
3, assist the construction unit to deal with all kinds of disputes related to this project.
Seven, other services:
1. Our company is a supervision company headed by Architectural Design Institute, which can provide technical consulting services for the preliminary design stage of this project.
2, assist the owner to do a good job of system completion acceptance for the record.
3, seriously study the construction drawing, from design to construction with a positive attitude to put forward reasonable suggestions.
4. Cooperate, assist, check and urge the construction unit to collect and sort out the data of this project and file the completion data in time, and strictly require the construction unit to make the project completion drawing correctly according to the actual construction situation.
The foundation of supervision work
1. Laws, regulations, policies and regulations of the state and this Municipality on engineering construction.
The second is the construction drawing design documents proposed by the design unit.
Three, the planning red line map, topographic map, municipal pipeline map, regional meteorological data provided by the relevant departments.
Four, the construction supervision contract, supervision planning and detailed rules, and the authorization (supervision) book issued by the owner.
V. Construction contracts and materials equipment orders contracts and production contracts, etc. Established according to law.
Six, the relevant construction specifications, procedures and standards.
Seven, the construction permit issued by the local construction authorities and relevant departments of the "project registration card".
Eight, all kinds of information in the process of project implementation, such as the approved accident organization design, engineering changes, and the legitimate needs of the owner under the premise of not exceeding the scope of the contract.
Guiding ideology of supervision work
According to the company's purpose, in the process of supervision, faithfully serve the owners. According to the technical level of our company, actively put forward optimization suggestions. Grasp the pre-control and be a good consultant to the owner.
In strict accordance with the relevant national and Shanghai codes, standards and regulations, urge the contractor to implement the project construction, ensure that the design drawings perfectly reflect the wishes of the construction unit and meet the requirements of the owner for the use of the project.
According to the authority of the supervision scope entrusted by the contract, technical and legal means are adopted from the perspective of organization and management to assist the owner to ensure the most reasonable realization of the overall objectives of the construction project, namely, the actual construction period of the project will not exceed the planned construction period and the actual quality will reach the expected goals and standards through the project objective planning and dynamic control of the project objectives.
Send strong professional and technical personnel to form a project supervision team, actively cooperate with the owner's representative, and submit project supervision consulting opinions and reports on time or in advance.
The goal of supervision work
Schedule control target-assist the owner to ensure that the actual construction period of this project does not exceed the predetermined target, and the construction period of this project does not exceed 29 months.
Quality control goal-creating excellent projects.
The goal of safe and civilized construction is to create a civilized construction site without major casualties.
Enterprise management goal-to develop the construction supervision market with high quality and efficient service.
supervisory organization
A, the project site supervision department organization management and quality assurance system network diagram:
Second, the site supervision team list
Name, age, education, position and professional title supervision certificate
He Boxing 59 Technical Secondary School Project Director Construction Engineer Shanghai Registered Supervision Engineer
Shi Jinlong 57 junior college safety supervisor, builder, supervisor and safety supervisor
Xiong Yao, deputy director of 36 universities, civil engineering engineer and national registered supervision engineer.
Zhangxin 35 University civil engineering supervision and survey supervision engineer supervision engineer.
Civil engineering supervision and material supervision Bi Jun, civil engineering engineer of 33 University, material witness certificate.
Zhu Yonghua 39 Certificate of Electrical Supervision and Material Supervision in Technical Secondary School, Electrical Assistant Supervision and Material Witness.
Water supply and drainage supervisor of Zhang Jianhua 52 technical secondary school
Du Yangming 54 University, Senior Engineer of National Registered Supervision Engineer, majoring in HVAC for Equipment Supervision.
Fan Yaying is a 45-year-old college information manager and assistant director of archives.
Third, the stage supervisor's work assignment:
Construction implementation stage
Overall completion acceptance of outdoor foundation and decoration equipment installation of foundation main structure.
Contract management √√√√√
Organize and coordinate √√√√√
Information √√√√√√
Measure √√√√.
Structure √√
Building decoration √√√√
Material test witness √√√√√√
Water supply and drainage √√√√√
Building electricity √√√√√
Remarks:
The supervision work in the warranty stage is to send corresponding professional supervisors to supervise the maintenance work in the warranty stage on the spot according to the engineering situation.
Relationship between supervision unit and construction, construction and design unit
A, the relationship between supervision and the construction unit:
1. According to the supervision contract, the contractual relationship between the construction unit and the supervision unit is entrusted and entrusted. The supervision unit independently carries out supervision work within the scope authorized by the construction unit and handles related supervision matters. In case of major quality or technical problems involving construction period, cost, etc. The supervision unit shall report to the construction unit in a timely manner, and the construction unit shall make a decision jointly with relevant parties, and then the supervision unit shall come forward to deal with it.
2. When the construction unit finds engineering problems involving quality at the construction site, it shall submit them to the supervision unit in time, and the supervision unit shall organize relevant personnel to study and solve them. The opinions of the construction unit on the construction quality or construction technology of the construction unit shall be put forward to the construction unit through the representatives stationed at the site by the supervision unit, and the arrangement shall be urged.
Second, the relationship between the supervision unit and the construction contractor:
1. The relationship between the supervisor and the construction unit is the relationship between the supervisor and the supervised. The construction unit must accept the supervision and provide necessary documents, materials and complete original records and test reports according to the requirements of the supervision.
2. The design unit shall inform the construction unit of the scope of authority entrusted to the supervision unit, and ask the construction unit to understand and support the supervision work, so as to provide convenience for the supervision work.
Third, the relationship between the supervision unit and the design unit:
1. There is a working relationship between the supervision unit and the design unit. Design documents, including drawings, technical specifications, design change notices, etc. , is the basis of supervision, supervision units should fully implement the design intent, strictly supervise the construction units according to the drawings. When there are questions or suggestions about the design drawings or changes in the geological and environmental conditions of the construction site need to change the design, the construction unit should negotiate with the design unit, which should make changes, and the supervision unit has no right to change the design.
2. When the design unit finds problems such as construction quality and construction technology at the site, it shall timely put forward handling opinions, and the supervision unit shall come forward to urge the construction unit to implement them.
Relationship diagram between supervision unit and related units
Supervision work procedure
A, supervision work standards:
1, construction preparation stage:
(1) Review the technical qualifications of subcontractors selected by the construction unit.
(2) Supervise and inspect the quality assurance system and safety technical measures of the construction unit, and improve the quality management procedures and systems.
(3) Check whether the design documents conform to the design specifications and approved technical design. Whether the construction drawing can meet the construction needs and help optimize and improve the design work.
(4) Participate in the technical disclosure from the design unit to the construction unit.
(5) Review the implementation construction organization design reported by the construction unit, focus on organizing the construction scheme, labor, materials, machinery and equipment, supervise the measures to ensure the quality, safety, construction period and cost control of the project, and put forward supervision opinions to the construction unit.
(6) Before the unit project starts, check the survey data of the construction unit, especially whether the survey data and piles between two connected construction units are clearly handed over, whether the procedures are perfect, whether there is any problem with the quality, check the penetration, the setting of the center line and leveling piles, and the fixation of piles. Check the center line and horizontal control piles of key engineering parts.
(7) Supervise the implementation of various construction conditions, examine and approve the commencement reports of general single projects and unit projects, and submit them to the owner for review.
Second, the construction stage:
(1) project quality supervision:
A, check and sign all concealed works before concealment, send supervisors to track key projects, and sign important quality evaluation forms for subdivisional works, divisional works and unit works.
B, construction survey, lofting and other random inspection. If problems are found, the construction unit shall be notified to correct them in time, and supervision records shall be kept.
C, check the quality of engineering materials, components and equipment entering the construction site, and check whether the test, test report and factory certificate are qualified and complete. The supervision engineer has the right to prohibit materials and equipment that do not meet the quality requirements from entering the construction site and putting them into use.
D, supervise the construction unit in strict accordance with the requirements of construction specifications and design drawings, and strictly implement the contract. Strengthen the inspection of the main parts, main links and technically complex projects of the project.
E, check the construction unit's engineering self-inspection, whether the information is complete, and whether it is filled in correctly, and make a comprehensive evaluation of the quality evaluation self-inspection of the construction unit.
F, the construction unit of the inspection and test instruments, equipment, weights and measures to conduct a comprehensive supervision, regular suggestions, irregular sampling, to ensure the accuracy of measurement data.
G, supervise the construction unit in accordance with the provisions, check and spot check all kinds of geotechnical and concrete specimens.
H, urge the construction unit to seriously deal with the general quality accidents in construction, and make supervision records carefully. Major quality accidents and other emergencies shall be reported to the chief supervision engineer in time and notified to Party A. ..
2, project progress supervision:
(1) The key work of supervision is to review the specific measures put forward by the construction unit to ensure the progress. If there is any delay, the construction unit shall be urged to organize the construction in strict accordance with the time limit stipulated in the construction contract. Analyze the reasons for controlling the construction period in time and take measures.
(2) The monitoring station shall establish a project progress account, check the project image progress, and report the implementation of the construction plan, project progress and existing problems to the owner on a monthly and quarterly basis.
(3) Project investment supervision:
A, review the quarterly and annual project inspection reports declared by the construction unit, carefully check the quantities, so as not to exceed or miss the inspection, and handle the project inspection and valuation visa in strict accordance with the current documents. Ensure that the quality of engineering inspection visas is qualified and the quantity is accurate. Report the visa to the owner for funding.
B, establish engineering inspection and valuation account, submit it to the owner once every quarter, check and liquidate with the construction unit at the end of each quarter, and report the liquidated data to the owner.
C, do not meet the quality standards of the project, before reaching the standard without rework, not work inspection pricing.
D, according to the provisions of the owner and supervision contract audit change design.
(a) The supervision unit is responsible for organizing the examination and approval of the three-level design change, and establishing a ledger, which is submitted to the owner on a monthly basis (with the notice of examination and approval of design change attached).
(b) The design and construction unit shall, after conducting a joint review of the first-class and second-class design changes, put forward review opinions and submit them to the owner for approval.
3, the completion acceptance stage:
(1) Supervise and inspect the construction unit to timely sort out the completion documents and acceptance data, accept the unit project completion acceptance report, and put forward supervision opinions.
(2) according to the completion report of the construction unit, put forward the project quality inspection report.
(3) Be responsible for the preliminary inspection of the project, participate in the completion handover acceptance organized by the owner, review the preliminary inspection report of the project, and put forward supervision opinions.