Current location - Education and Training Encyclopedia - University ranking - Reply to the Research Report of the Fourth Xijiang Bridge Project in Wuzhou City
Reply to the Research Report of the Fourth Xijiang Bridge Project in Wuzhou City
Reply on the Feasibility Study Report of the Fourth Xijiang Bridge Project in Wuzhou City

Gui Fa Gai Investment [20 1 1]No. 1278 Wuzhou Municipal Development and Reform Commission:

Your Request for Instructions on Approving the Feasibility Study Report of the Fourth Xijiang Bridge Project in Wuzhou City (No.1 1) has been received. The feasibility study report of the Fourth Xijiang Bridge in Wuzhou City has passed the evaluation of Guangxi Engineering Consulting Center. After study, the reply is as follows:

1. In order to improve the traffic inconvenience on the north and south banks of the Xijiang River, improve the road network structure of Wuzhou City and realize the overall urban planning of Wuzhou City, it is agreed to build the fourth Xijiang Bridge project in Wuzhou City.

Second, the construction scale and main technical standards. This project crosses Xidi Road in the north and Gaowang Road in the south. The total length of the route is 2200.98m, in which the main bridge is 558m long, the upper layer is 23.5m wide and the lower layer is12m wide. The total length of the north-south approach bridge is 948.5m, with the upper layer width of16.5m and the lower layer width of12m. The total length of the north-south approach road is 694.48 meters; The motor vehicle ramp bridge is 209 meters long, and the ramp approach length is 27 1.62 1 meter; The auxiliary length of south bank is 470.824 meters. The upper bridge is a motor vehicle lane, and the lower bridge is a non-motor vehicle lane and sidewalk. Main technical indicators: design according to the second-class standard of urban main roads, calculate the driving speed of 40km/h, design load is a first-class highway, navigation standard is a first-class waterway, the maximum navigable water level is 26.35m, and the flood frequency is designed according to 1/300, and checked according to 1/300.

Third, the bridge type. It is agreed in principle that Wuzhou Municipal People's Government adopts the scheme of through steel box tied arch bridge. However, in the preliminary design, it is suggested to solve the following problems: first, fully consider and solve the problem of getting on and off the bridge by non-motor vehicles, and supplement the ramp design of non-motor vehicles; Second, due to the complex structure of the scheme, it is suggested to do technical pre-research and strengthen investment control to avoid unnecessary waste; Thirdly, in view of the complex construction technology and high technical requirements, and the great influence of construction on shipping and flood discharge, it is suggested to further optimize the engineering scheme in the preliminary design in the next stage and do a good job in the construction organization design.

Four. Investment estimation and fund raising. The estimated total investment of the project is 987.53 million yuan, and the source of funds is multi-channel financing by the owner.

Please reply accordingly and proceed to the next stage.

20 1 1 year1October18th

20111kloc-0/broke ground on October 27th.

The opening of the project starting base has added new impetus to the city's development.

On October 27th, 65438/KLOC-0, the construction of the Fourth Xijiang Bridge in Wuzhou started. Photo by Meng Yaxi

(Reporter Jin Ming correspondent Ou) On the eve of the opening of the 8th Wuzhou International Gem Festival, there were many happy events in our city. 10 On June 27th, the third phase expansion project of the 4th Xijiang Bridge in Wuzhou Port and Sinotrans Li Jiazhuang Operation Area broke ground, the new production base of Tianmijia Bee Industry in Wanxiu District was completed, and the technical exchange center of Guangxi Wuzhou Bee Industry of China Rural Professional and Technical Association and the scientific research trainee base of food science graduate students of Northwest University were unveiled. Liu Zhiyong, secretary of the Municipal Party Committee and director of the Standing Committee of the Municipal People's Congress, announced the commencement of the third phase expansion project of the Fourth Xijiang Bridge and the Li Jiazhuang operation area of Sinotrans Wuzhou Port. City leaders Wu Hanhua, Huang Zhenrao and Wu attended relevant activities. Huang Zhen Rao, member of the Standing Committee of the Municipal Party Committee, Minister of Propaganda and Vice Mayor, delivered a speech on behalf of the Municipal Party Committee and the Municipal Government. Zhai, Director of Rural Professional Technology Center of China Association for Science and Technology, Executive Vice President of China Rural Professional Technology Association, Chairman of China Beekeeping Association, Yue Xiaochuan, Secretary General of China Bee Products Association, Deputy Director of Guangxi Aquatic Animal Husbandry and Veterinary Bureau, Zhu Dong and Cao Wei, Vice Chairman of Guangxi Association for Science and Technology, and doctoral supervisors of Northwest University attended the completion ceremony of the new production base of sweet bee industry in Wanxiu District and the unveiling ceremony of Guangxi Wuzhou Beekeeping Technology Exchange Center of China Rural Professional Technology Association and the research and internship base of food science graduate students of Northwest University. Huang Zhenrao said in his speech that the Fourth Bridge of Xijiang River is another important channel for our city to communicate with the north and the south, and it is a concrete embodiment of our city's strategy of "connecting the south with the west", which has a great pulling effect on accelerating the development of the south bank area of our city, creating high-quality urban space and further expanding the city scale. The relevant units should create the most relaxed environment and provide the best service for the project construction from the height of implementing Scientific Outlook on Development and building a harmonious society, so as to make the project a landmark project that can reassure the people of the whole city. Rao said that the third-phase expansion project of Sinotrans Li Jiazhuang Wuzhou Port Operation Area is of great significance to further improve the bearing capacity of our port and wharf, expand the development space of urban transportation and logistics, accelerate the development and construction of industrial and commercial logistics in our city, and promote the rapid economic development of Wuzhou. All departments and units should firmly establish the idea of "playing a game of chess" in the city, and in accordance with the requirements of "strengthening execution, enhancing synergy and enhancing innovation" put forward by the municipal party committee, Qi Xin should make concerted efforts and make concerted efforts. Huang Zhenrao congratulated the completion of the new production base of Tianmijia Bee Industry in Wanxiu District, the opening of the technical exchange center of China Rural Professional and Technical Association in Wuzhou, Guangxi, and the completion of the research internship base of food science graduate students in Northwest University. He pointed out that the new sweet bee industrial production base is not only an industrial project, but also a leading agricultural industrialization project to help farmers increase their income. It is also a project integrating industry and tourism. It has become the first deep processing base of bee products in Asia in terms of production capacity, processing capacity and application, and will do a good job in economic development, sing the trilogy of urban construction, strive to create "one belt, two places, one hub and one park" and accelerate the construction of "one park". It is reported that the Fourth Xijiang Bridge in our city is located at the downstream of the east confluence of cheung chau island, crossing Xijiang River and Xidi Road, starting from Gaowang Road at the south bank level and connecting with Rihua Road at the north end, with a total length of about1.920m; Wuzhou Port Sinotrans Li Jiazhuang Operation Area Phase III expansion project plans to build 1 2,000-ton multi-purpose berths and 2 3,000-ton multi-purpose berths, and add 6 large cranes such as container gantry cranes; After the completion of the new production base project of Tianmijia Bee Industry in Wanxiu District, it is estimated that the annual processing capacity will reach 65,438+10,000 tons and the output value will reach 1 100 million yuan. From the production capacity, processing capacity and application of bee products, it is the first deep processing base of bee products in Asia.