From Chengdu North Railway Station, walk 1. 1 km to Guandong Village Station, take X40 Road, pass 10 Station and get off at Chengdu Medical College Station.
Walk180m to Chengdu Medical College Station and take Metro Line 3? (direction of Shuangliu West Station), take 15 stop and get off at Qianfeng Road Station;
Transfer to Metro Line 6 (in the direction of Wang Cong Temple), pass 14 station and arrive at Xipu Station? (exit d) get off;
Walk 5 10 meters to Xituan intersection station of Hong Guang Avenue, take P2 1 road, pass 2 stops, and get off at xihua university Nandamen Station; Walk 130m to xihua university.
Chengdu North Railway Station
Chengdu North Railway Station, located in Chengdu, Sichuan Province, China, is a newly-built marshalling station in China during the 11th Five-Year Plan period, and the first station in China to adopt the comprehensive automation system of marshalling station.
Chengdu North Station started construction on September 25th, 2003. It was put into operation on April 20, 2007, and the opening ceremony was held; Completion acceptance was completed on July 29th, 2009.
As of August 20 10, the scale of Chengdu North Railway Station is two-way, three levels and six games. As of 20 13, Chengdu North Station covers an area of 228.53 square meters; The total investment is 2.008 billion yuan.