Current location - Education and Training Encyclopedia - University ranking - Inner Mongolia Normal University Lesheng Campus
Inner Mongolia Normal University Lesheng Campus
Lesheng Campus of Inner Mongolia Normal University is located in Helinger Lesheng Economic Park, Hohhot, Inner Mongolia, adjacent to Mengniu headquarters. It covers an area of about 3000 mu. The teaching building covers an area of 27,000 square meters, the library covers an area of 20,000 square meters and the comprehensive gymnasium covers an area of 7,600 square meters. A plastic runway has been built.

Artificial turf standard track and field stadium, 1 1,000 square meters, nearly 20,000 square meters of various sports fields; The sculpture building covers an area of 3,200 square meters, the administrative building covers an area of 9,000 square meters, the student canteen covers an area of 8,000 square meters, the student apartment covers an area of 70,500 square meters, and the ecological park covers an area of 1.900 square meters (covering an area of 1.30 mu). At present, more than18,000 undergraduate and graduate students in arts and sciences have settled in.

Campus green area157500m2. Paved roads are 65,438+065,438+00,000 square meters (35,000 linear meters), hardened areas around squares and buildings are 56,000 square meters, and lakes are 8,000 square meters.

Campus roads are paved with 9900 linear meters of tap water pipe network, heating pipe network 12500 linear meters, drainage pipe network 4 130 meters, 26000 meters of various high and low voltage cables, 8 box-type substations, 2200 meters of campus fence, and barbed wire 1000 meters on the west side. The North Gate Project and the East Gate Project with a span of 80 meters have all been completed and put into use.

The supporting installation works of hydropower cold and heat station and heat exchange station in Lesheng Campus have all been completed. All the projects were completed at the end of August 2004, and were awarded the "Outstanding Achievement Award of Major Projects in the Autonomous Region in 2004" by the people's government of the autonomous region.

The logistics comprehensive service building project (5000 square meters) started in early 2005 and the science and technology experimental building started in 2006 have all been put into use.

In 2009, a department building and a minority literature museum were built and put into use.

20 14, the academy of fine arts was completed and put into use, and the network technology college was under construction.

On 20 15, construction of two science and technology buildings was started.

In 20 17, the science and technology building was basically completed (all teachers and students of the School of Computer Science and Technology and freshmen of the School of Physics and Electronic Information and the School of Chemistry and Environment moved from Sai Han Campus to Lesheng Campus to teach).