Current location - Education and Training Encyclopedia - University ranking - Do you have any information about Shidaowan nuclear power plant? Any information will do.
Do you have any information about Shidaowan nuclear power plant? Any information will do.
Location Rongcheng City, Shandong Province Unit Address No.9 Shihe Road, Rongcheng City, Shandong Province Subordinate Department Shandong Province

Contact the Human Resources Department of this department at (0631) 7357029 7357016 7357023.

Unit fax of other enterprise units

E-mail address of company website: sdwhd@hsnpc.com.cn company post code 2643 12.

Reserve bill

Demand information

Implement the way of personal recommendation of graduates.

Offer to meet.

Type requirements, professional requirements, number of people arranged, and specific requirements for the post.

Undergraduate mechanical design, manufacturing and automation II

Postgraduate mechanical manufacturing and its automation II

Undergraduate Thermal Energy and Power Engineering (Turbine) II

Undergraduate thermal energy and power engineering (internal combustion engine) II

Undergraduate thermal energy and power engineering (thermal energy engineering) II

Undergraduate thermal energy and power engineering (refrigeration and cryogenic engineering) II

Undergraduate Thermal Energy and Power Engineering (Energy and Environment) II

Graduate student of thermal energy engineering II

Undergraduate metal material engineering II

Postgraduate Material Science (Metal) II

Power system and its automation for graduate students II.

Unit profile

Huaneng Shandong Shidaowan Nuclear Power Co., Ltd

20 10 college graduates recruitment notice

I. Company Profile

Huaneng Shandong Shidaowan Nuclear Power Co., Ltd. (hereinafter referred to as the company) is located in Rongcheng City, Shandong Province. Established by China Huaneng Group Corporation, China Nuclear Industry Construction Group Corporation and Tsinghua Holdings Co., Ltd., it is a holding company directly managed by the group company, and is responsible for the construction and operation management of the national science and technology major special high-temperature gas-cooled reactor nuclear power plant demonstration project.

The company is located in Ningjin Sub-district Office, Shidao Management District, Rongcheng City, 23 kilometers east of Rongcheng City, 68 kilometers north of Weihai City, 20 kilometers northwest of Yantai City, and 0/85 kilometers southwest of Qingdao City. At present, demonstration projects of high-temperature gas-cooled reactor nuclear power plant are under construction, including 200MW units, 4× 1250MW pressurized water reactor (AP 1000) nuclear power units, expansion of 100 MW high-temperature gas-cooled reactor nuclear power units, and cooperation with National Nuclear Power Technology Corporation to build CAP 1400 and CAP65438+. The demonstration project of high-temperature gas-cooled reactor nuclear power plant is planned to start construction in September 2009, and it is expected to be put into operation in 20 13. 2× 1250MW PWR nuclear power unit is scheduled to start in 20 1 1 year and put into production in 20 16 years.

Mission: to build a leading international commercial demonstration nuclear power plant and cultivate a high-quality nuclear power talent team.

Form a scientific and standardized nuclear power management system and build an excellent corporate culture with nuclear safety as the core.

Development vision: safe and reliable, advanced in technology, commercially feasible and first-class in management.

Basic concepts: safety, standardization, innovation and excellence.

Strategic orientation: Based on demonstration projects, Shidaowan nuclear power base will be developed and built to provide talents, management and cultural support for the long-term development of Huaneng nuclear power.

Talent concept: people-oriented, give full play to talents, have both ability and political integrity, and strengthen enterprises with talents.

Talent growth view: those who want to be officers have opportunities, those who succeed have platforms, and those who do good deeds have stages.

Second, the project introduction

(1) demonstration project of high temperature gas-cooled reactor nuclear power plant

Modular high-temperature gas-cooled reactor nuclear power plant has inherent safety, simple system, high power generation efficiency, wide application and potential economic competitiveness, which has attracted widespread attention all over the world and is one of the fourth generation advanced nuclear reactor types that can meet the demand of future energy market. The 10MW high-temperature gas-cooled experimental reactor designed and built by Tsinghua University has been running at full power in June 2003, becoming the first experimental nuclear power plant with the characteristics of modular high-temperature reactor in the world.

In order to promote the commercialization demonstration project of high-temperature gas-cooled reactor nuclear power plant with independent intellectual property rights, in February 2006, the National Medium and Long-term Science and Technology Development Plan (2006-2020) listed the demonstration project of high-temperature gas-cooled reactor nuclear power plant as a major national science and technology project; In June 2006, the State Council established a major special leading group for large-scale advanced PWR and HTGR. In September 2007, the Commission of Science, Technology and Industry for National Defense organized and compiled the Overall Implementation Plan for Major Special Projects of High Temperature Gas-cooled Reactor Nuclear Power Plant, which passed the expert review. On February 15, 2008, the executive meeting of the State Council deliberated and adopted the implementation plan for major projects, marking the start-up and implementation stage of major projects.

On April 1 day, 2008, the demonstration project of "five connections and one leveling" started. At present, the negative excavation of the nuclear island foundation pit has been completed and passed the acceptance of the National Nuclear Safety Administration. The steel bars on the bottom plate of the nuclear island are being bound to prepare for the commencement of the project and the pouring of the first tank of concrete.

(2) PWR expansion project

AP 1000 is the safest and most advanced third generation nuclear power technology in the world. The main safety system adopts simplified passive design and a large number of modular manufacturing and construction technologies, which simplifies the operation management of power plant systems and equipment, improves the safety of power plants and shortens the construction period.

With the implementation of China's AP 1000 independent projects (Sanmen, Zhejiang, Haiyang, Shandong), according to the national policy orientation, the PWR expansion project of Shidaowan Nuclear Power Station will adopt the AP 1000 technical route, and build 4× 1250MW units in two phases. Referring to the total construction period of AP 1000 nuclear power units under construction in China and the start-up interval of units in the same period, the total construction period of each unit in Shidaowan PWR expansion project is considered to be 56 months, and the start-up interval of units is tentatively set at 12 months, and it is planned to be completed and put into operation before 2020.

Third, the recruitment plan

Shidaowan Nuclear Power Station is based on contributing green energy to the society and is committed to building a large-scale nuclear power base with international leading level, providing a broad space for the growth and success of employees. We sincerely welcome outstanding college graduates to join us, gather the energy of Shidao and create a better future together.

In 20 10, the company plans to recruit 257 fresh graduates with bachelor degree or above for relevant domestic institutions. Major and location are as follows:

50 people in nuclear engineering and technology; 85 people in thermal power; 45 people in electric power engineering and automation; 44 people in thermal engineering and automation; There are 33 people in other majors such as metal materials and machinery manufacturing.

Basic requirements: Good conduct, excellent grades, good health and CET-4 or CET-6 certificate.

Four. Recruitment procedure

1. Registration: applicants fill in the Application Form for Candidates and the Basic Information Form for Candidates (see the attachment for details), and send them to the Human Resources Department of Huaneng Shandong Shidaowan Nuclear Power Co., Ltd. by e-mail together with their resumes, transcripts, Grade 4 or Grade 6 certificates and other materials.

E-mail :sdwhd@hsnpc.com.cn

2. Qualification examination: the company organizes the screening of student information and determines the interview candidates.

3. Interview: The company organizes interviews by region according to the registration. At the same time, send a recruitment working group to teach in relevant universities, receive resumes on the spot, organize interviews, and determine the students to be hired.

4. Physical examination: arrange the students to be hired to go to the designated hospital for physical examination.

5. Signing an agreement: The recruitment working group signs an employment agreement with the students who have passed the medical examination.

Verb (abbreviation for verb) contact information

Address: Human Resources Department of Huaneng Shandong Shidaowan Nuclear Power Co., Ltd., No.9 Shihe Road, Rongcheng City, Shandong Province

Contacts: Mr. Chen, Mr. Yang and Mr. Luo.

Tel: (0631) 7357029 7357016 7357023

Postal code: 2643 12

Matters needing attention about intransitive verbs

1. Fill in the application form.

(1) Chinese name must be consistent with ID card information;

(2) Fill in "healthy", "general" or "weak" according to my specific situation;

(3) the place of origin must be filled in to the province or city (non-county-level city);

(4) Please fill in the mobile phone number for the first contact information;

(5) Please fill in parents, siblings or spouses for family information;

(6) If the English level belongs to the students who took the new rules test in 2004, please fill in the test results.

interview

After receiving the interview notice, please bring the following materials:

(1) Print the application form and resume, and sign the authenticity commitment;

(2) a copy of the graduate recommendation form;

(3) Original Transcript of Graduates (stamped by the Academic Affairs Office of the school);

(4) Copy of College English Test Certificate (original);

(5) One-inch color photos.

(6) Other materials that you think are sufficient to prove your ability.

Step 3 have a physical examination

After receiving the medical examination notice, please make the following preparations:

(1) Ensure adequate sleep before physical examination;

(2) Dinner on the day before the physical examination should be light and do not drink alcohol;

(3) on an empty stomach on the morning of the physical examination, do not eat breakfast or drink water;

(4) Please bring your ID card during the physical examination.