Summary of big discussion activities
Four summaries of selected big discussion activities

Summary is to analyze and study the relevant situation at a certain stage and make written materials with guiding conclusions. It can make us more efficient. Let's sit down and write a summary. How should I write a summary? The following are four summaries of the big discussion activities I organized for you, hoping to help you.

Summary of discussion activities 1 In order to further improve employees' safety awareness, build up employees' safety ideological defense lines, effectively prevent safety accidents, and create a good safety atmosphere in the overall situation. Recently, Xingren Power Supply Bureau of Guizhou Power Grid earnestly implemented the requirements of the Notice of China Southern Power Grid Corporation on Carrying out the Great Reflection on Safety Production Violations, and carried out the great reflection on safety production violations on a global scale, aiming at further drawing lessons from accidents and improving employees' safety awareness and safety skills.

In the discussion activities, firstly, I learned the safety learning materials such as "Express Report of 5.7 Electric Shock Accident in Guilin Power Supply Bureau of Guangxi Power Grid" and "6.20 Personal Electric Shock Falling Accident in Liushun Power Supply Bureau of Pu 'er Power Supply Bureau". Through re-learning, re-analysis and re-thinking of typical safety cases in China Southern Power Grid system recently, the hidden dangers and unsafe behaviors in the work are found by analogy.

It is understood that during the reflection and discussion, the majority of employees combined with the case, mainly aimed at the safety hazards existing in the field operation safety control and operation and maintenance process, conducted in-depth and detailed combing, deeply analyzed the reasons for violations, and put forward reasonable suggestions and opinions on the shortcomings existing in our safety management. At the seminar, with the theme of "anti-violation", the bureau carefully studied the relevant cases of safety accidents, and deeply thought and analyzed the violation facts, violation process and reasons of each accident. In view of the safety deficiency exposed by the accident, combined with the actual situation of our department, and compared with the problems exposed by safety risk assessment, safety spot check and on-site operation violation, this paper puts forward a series of targeted measures to prevent personal accidents and misoperation. In view of the problems exposed by the accident, such as failure to implement safety responsibilities, inadequate safety education and training, lax implementation of rules and regulations, loose management organization of on-site operation safety, and poor safety supervision, all departments are required to reflect on whether there are problems such as dereliction of duty, dislocation and failure to strictly implement the responsibility of safety production organization process, especially to strengthen safety control and analysis of dangerous points at the operation site and strictly implement safety regulations, "two votes and three systems" and safety production rules and regulations. Formulate and implement safety organization measures and technical measures for on-site operations in advance, improve safety control measures and hazard point analysis, and ensure the safety of various job sites.

It is reported that the bureau requires all departments to conscientiously implement various rules and regulations, resolutely fight against the three major security enemies of "violation of regulations, paralysis and irresponsibility", carefully find out the dangerous points and unsafe factors in the work, formulate preventive measures, enhance the awareness of self-protection and mutual protection, and strengthen the safety management and control of on-site operations and the investigation and management of potential safety hazards to ensure the safe and stable operation of people, power grids and equipment, and ensure the annual safety goal of zero accidents.

Summary of discussion activities 2 According to the deployment and requirements of safety production discussion activities in our mine, our team carried out safety production discussion activities from 6 to 28 February in 20xx/KLOC-0. By using pre-shift meetings and other meetings to organize employees and party member cadres to study the documents of the discussion activities of the University of Mining and Technology, and to carry out special discussions and rectification, the safety situation of our team has been obviously improved, the safety awareness of employees has also been improved compared with the past, and the "violation" behavior has also been significantly reduced, and the discussion activities of safety production have achieved remarkable results. The work in each stage of safety production discussion activities is summarized as follows:

First, intensify the propaganda and study of safety production, and earnestly do a good job in the basic work of safety production discussion activities.

In order to do a good job in the publicity and study of the first stage of the safety production discussion activities, our team held a meeting of team members and team leaders after receiving the notice of the safety production discussion activities to discuss the plan of the safety production discussion activities. Make full use of the discussion activity documents of the University of Mining and Technology before and after going to work every day, the spirit of the speech made by the leaders of the group company at the safety emergency meeting of Hebi Coal Industry Company on June 5438+ 10/4, and the spirit of the safety production documents of each group company, constantly strengthen the theoretical mind of employees, educate employees to truly establish the idea of obeying the rules and discipline and putting an end to "three violations", and create a positive, healthy and upward learning atmosphere among the cadres and workers in the team.

The second is to do a good job in special discussion and correct some unsafe factors in self-construction.

In the second stage of safety production discussion, our team started with the safety concepts of "starting from scratch and striving for zero" and "never taking one or two pieces of blood coal".

With the clue of how to do a good job in safety production in the unit and correct some unsafe factors that affect the construction, the staff and cadres of the whole team spoke interactively with the party branch, team and leading cadres, talked about their feelings and experiences, and put forward some solutions to the problems, so as to truly unify their thoughts and actions with safety production. After carefully absorbing the opinions of each employee, the leading cadres of the team held a discussion meeting with the team members, focusing on how to change their work style and do a good job in safety management and technical management. Then everyone spoke freely, carefully analyzed themselves and found out the loopholes and deficiencies in safety management, which further enhanced their enthusiasm and sense of responsibility and truly realized the concept of "doing things with heart and pursuing Excellence" of the group company.

Third, strictly implement the problem rectification and seriously write the experience of big discussion.

In view of the problems and unsafe factors reflected in the workers' special discussion stage, the team made detailed records and strictly implemented the problem rectification. After the problem is required to be rectified, someone will supervise the implementation, completely solve the problem and eliminate hidden dangers. At the same time, according to the "deployment" of the big discussion, every employee in the team is required to write his own experience, strive to change the old concept that "dry coal mines can't become immortals", establish the concepts of "starting from scratch, striving for zero" and "doing things with heart and pursuing Excellence", and change post-event investigation into pre-event prevention.

The development of the safety production discussion activity has opened up a good situation of our team's safety work in the past 20xx years, made the mental outlook of our team's employees look brand-new, made us see the continuous improvement of the coal mine safety situation, and created a good working environment for employees to participate in coal mine construction. I believe that as long as we make unremitting efforts, we will be able to do a good job in coal mine safety and realize the prosperity of coal mine workers at an early date.

The third part is the summary of the discussion activities. According to the spirit and requirements of the document "Implementation Plan for Carrying out Railway Construction Safety Inspection Activities" (issued by Liaoning Company of Beijing-Shenyang Passenger Dedicated Line 20xx-70) and the actual situation of our work area, the third part is the "Special Action for Investigating and Rectifying Construction Safety Hidden Dangers", which was carried out in April in order to implement the deployment of the party group of the Railway Corporation to carry out safety inspection, comprehensively and thoroughly investigate and rectify construction safety hidden dangers, effectively curb all kinds of safety accidents, ensure that no major accidents occur during construction, and resolutely hold the safety red line. In order to eliminate all kinds of hidden dangers of accidents and effectively curb the occurrence of serious accidents, a safety inspection activity was carried out in combination with the actual production situation in our work area. The inspection situation is summarized as follows:

First, carefully organize and strengthen leadership.

Our work area attached great importance to this activity, promptly publicized and implemented the spirit of the Notice on Carrying out Safety Inspection, and set up a safety inspection activity leading group headed by the main leaders to ensure that the inspection work was put in place.

Two, the provisions of the inspection content, determine the inspection method.

The activity survey began in June and ended at the end of August. The inspection was carried out by the project department, and all the construction points in our work area were comprehensively investigated and combined. The inspection contents include: ideological understanding and sense of responsibility, system construction and effective operation, on-site operation control and investigation of potential safety hazards (scaffolding construction safety, tunnel construction safety, bridge construction safety, flood control and geological disaster prevention), illegal subcontracting, subcontracting and linking, and implementation of fire safety in residential quarters (including implementation of fire responsibility system, daily fire inspection, effectiveness of building fire-fighting equipment and facilities, emergency plans and drills). , the implementation of the accident "four don't let go", the situation of safe production and response to natural disasters in flood season, including whether to carry out hidden danger investigation and hidden danger reinforcement in flood season, and whether the key hidden dangers have declined.

Supervision and inspection of monitoring measures such as physical support and tracking, emergency plans and drills, and emergency material reserves.

Third, strict requirements were put forward for the inspection team.

1. Strengthen the organization and leadership, and fully promote the safety inspection.

The work area attaches great importance to this safety inspection. According to the work requirements of "full coverage, zero tolerance, strict assessment and effective results", the work arrangement of the railway head office is fully implemented, and the main leaders personally grasp it, establish an organization, formulate an implementation plan, clarify the work focus, implement the work responsibilities, and promote the safety inspection work in a deep and solid manner.

2. Highlight the key points of investigation and vigorously rectify potential safety hazards.

It is necessary to earnestly strengthen the comprehensive investigation of key projects, key parts and key links. Carefully classify and sort out the problems found in the investigation, establish problem files, formulate rectification plans, clarify the rectification time limit, implement rectification responsibilities, and timely accept the rectification results in strict accordance with closed-loop management requirements. For the construction site with major safety hazards, rectification measures must be taken immediately to stop work, and construction can be resumed only after the safety conditions are confirmed.

3. Strengthen assessment and implement safety management responsibilities. Inspection teams at all levels should go deep into the scene, do their best and investigate carefully. The inspection work must be carried out in the form of inspection, and the inspection responsibility must be implemented. For units and construction sites that fail to organize investigation and rectification, fail to implement rules and regulations, and have outstanding safety hazards, if safety accidents occur or cause serious consequences during the investigation and rectification process, it is necessary to increase penalties in strict accordance with regulations to ensure that safety hazards are completely eliminated.

4. Strengthen information communication and work report.

Clarify the competent department and responsible personnel, carefully report the information during the safety inspection, and make a work summary once a week, including the main practices, achievements and outstanding problems found in the inspection activities, and attach 1 ~ 2 typical positive and negative cases, and form a work summary and "safety" before every Saturday 1 1.

Statistical report on the investigation and rectification of all problems, and summarize the major inspection work every month.

Fourth, summarize the detected problems.

My work area summarizes the inspection situation every week and month, logs in the account, carefully analyzes and studies, and makes a summary.

Up to now, 54 problems have been found, 54 problems have been rectified and 0 problems have not been rectified. Nine penalty notices were issued. 34 rectification notices.

The main achievements of verb (verb's abbreviation) activity

(1) ideological understanding and sense of responsibility.

Through this activity, cadres and workers at all levels in our work area have a good understanding of safety thoughts, actively participated in this activity, and their sense of responsibility was obviously enhanced, and they performed their safety management duties with high vigilance and responsibility. For example, the site management of 1.3km subgrade is chaotic, the safety awareness of site technical directors, technicians and construction workers is generally low, and the site safety management and control ability is low, so it is impossible to find, rectify and implement safety production problems in time and effectively. After this activity, Liu Baoquan, the site supervisor, Chou He, the technician, and the construction personnel on the site have generally greatly improved their safety awareness, strictly implemented the requirements of "three simultaneities" in safety production, and the safety status of the construction site is good and controllable, ensuring the construction safety.

(2) Institutional system construction and effective operation. First, revise and improve the safety management system; Second, the safety management system with responsibility system assessment as the main content runs effectively, safety work is arranged, inspected, analyzed and assessed, violations are corrected in time and effectively, safety rules and regulations are seriously implemented, and staffing and safety education and training meet the requirements; Third, the safety risk management in the construction stage was strengthened, risk identification and process control were in place, and a risk management ledger was established.

(3) Safety management and control on the construction site.

First, prepare and review the construction plan, work instruction and technical disclosure in strict accordance with the regulations, and seriously implement them. Second, the construction procedures for large-scale mechanical equipment are complete. Third, large-scale mechanical equipment can be inspected and maintained according to regulations, and there is no problem of running with illness through this activity; Strictly and conscientiously compile and implement the safety operation rules, and rectify the illegal operation and illegal use; The follow-up guarantee for cadres was put in place. Fourthly, the construction of tunnels, bridges and scaffolding should strictly comply with the requirements of relevant safety laws and regulations. Fifth, protective reinforcement or relocation measures have been taken for key flood control sites; An early warning mechanism has been established to ensure the timely evacuation of personnel in case of emergency; Formulate and improve emergency plans and organize emergency rescue drills, establish emergency rescue teams, and prepare sufficient flood control materials and tools.

VI. Main problems

1. The safety awareness level of all employees needs to be improved.

Through this safety inspection activity, the safety awareness of employees in our work area has been improved to a certain extent. In the process of construction, the safety situation is controllable, but there are also shortcomings. In the construction and production activities, it is still necessary to maintain a high degree of safety awareness at all times, so as to pay equal attention to production and safety.

2. The security system needs continuous improvement.

After this safety inspection activity, although the safety system has been improved, there are still some shortcomings. All departments in the work area need to actively implement the responsibility for production safety according to their own characteristics, and carry out serious and profound exploration, discovery, supplement and improvement in the follow-up work, carry out production safety inspection throughout all work, and be brave in reflection, discovery, strict rectification, summary and continuous improvement.

Always persevere in safety inspection activities, constantly sum up experience and lessons, study new situations and new problems, gradually improve the level of safety management, strive to create a new situation of safety production, and truly achieve comprehensive safety production standards. On the basis of the previous work, our work area will further perform its duties, earnestly implement preventive measures, do a good job in all safety production, do a good job in inspection and supervision, ensure all work is safe and orderly, and promote the sound and rapid development of the work area with a good safety production environment.

Summary of the big discussion activities 4 In order to implement the spirit of the big discussion on emancipating the mind in the whole region, further promote the development of the big discussion on emancipating the mind in our school, strive to solve the contradictions and problems that affect the scientific development of school education, strive for the first place, pass the provincial education supervision and evaluation with high standards, and achieve new breakthroughs in ideas and ways of thinking, new changes in working methods and styles, and new improvements in leadership level and development achievements. According to the requirements of the Party Committee of Education Bureau to discuss emancipating the mind, our school attaches great importance to solving the outstanding problems in the process of "promoting the scientific development of ancient metallurgy education and striving for high standards to pass the provincial education supervision and acceptance", and has carefully organized and carried out emancipating the mind discussion activities in combination with various work, and achieved initial results. The activities are reported as follows:

The first is to establish a mechanism to ensure implementation.

At the beginning of March, the school held a team meeting, set up a leading group for emancipating the mind with the principal and secretary as the team leader, set up office documents (general branch office), and formulated an implementation plan for emancipating the mind in our school, which ensured the vigorous development of activities.

Second, the basic situation and main practices.

(1) Learning and education stage.

On the afternoon of March 8, the headmaster told all the teachers the purpose and significance of emancipating the mind and mobilized all the teachers to actively participate.

Using the network platform of the school, teachers and staff are organized to study the spirit of the document on the development of large-scale discussion activities in depth, and the large-scale discussion activities are fully deployed in combination with the actual situation, so as to further unify their thinking, guide party member cadres and workers to study theory, clarify their thinking and raise their awareness. At the same time, party member cadres also combined with their own work practice, writing experience.

(2) Centralized discussion stage.

Organize special discussions with grade groups, party branches and departments as units. The members of the team, combined with their own work practice, started discussions around "promoting the scientific development of ancient metallurgy education and striving for high standards to pass the provincial education supervision and acceptance", found out the problems in their thoughts, behaviors and styles, deeply analyzed the ideological roots, and listened to the opinions put forward by other comrades with an open mind. The teaching staff participated in the discussion of many factors affecting the development of school education and teaching, and put forward many constructive suggestions.

(3) consultation.

The school solicited opinions from all the staff and parents of some students through the network platform, and then Ren Changchun, the general branch director, summarized and classified the opinions, and * * * sorted out three problems that restricted the development of the school:

1, the construction of teaching staff needs to be further improved;

2. Efficient classroom reform in schools needs to be further deepened.

3. The formative education of students needs further improvement.

(4) Methods and measures

The school held a special meeting to discuss three main problems affecting the development of the school and formulate improvement measures.

1. Countermeasures for "the construction of teaching staff needs to be further improved"

The school has formulated the "XX Implementation Plan for Strengthening the Construction of Teachers' Team and Shaping Teachers' Soul". Improve teachers' morality and cultivate teachers' style through the "forum for promoting schools" at the school level.

First, it is guided by teachers' morality (goal and general program) and based on the school motto of "understanding, honesty, cooperation and learning";

Second, take the construction of teachers' morality as the starting point and team building as the guidance.

Thirdly, learning model and tree model.

Fourth, inherit teachers' love and carefully create teachers' behavior culture.

Fifth, embody charm and implement the construction of teachers' morality.

6. Grasp the key points and conduct self-examination and self-correction.

2. The measures of "efficient classroom reform in schools needs to be further deepened".

After several rounds of discussion, the school decided to explore efficient classroom reform from the "Seven 8th grade" and summed up the "532 efficient classroom reform model" of our school: five major activities in classroom teaching: autonomous learning, cooperative inquiry, display feedback, evaluation and arrangement, reflection and improvement; Three key supports: independence, cooperation and inquiry; Two development goals: improving students' comprehensive quality development and improving teachers' professional quality development.

Through several months of teaching practice, we have achieved certain results, and the education and teaching level of our school has been significantly improved.

3. The countermeasures of "students' cultivation education needs to be further improved"

Take the big break as the starting point, promote students' development education, show their spiritual outlook, and rely on activities to educate students' consciousness of self-awareness, self-confidence, self-reliance and self-improvement to cultivate healthy and independent spiritual character.

Cultivating students' personality development, all-round development and all-round development is the third requirement of the education policy. Our school's big recess activities have a long history and are our brand of moral education. While continuing to deepen this activity, our school fully develops and excavates the connotation of big recess, so that students can get aesthetic education, team consciousness, life ideal and responsibility consciousness education, and spread this good education to all aspects, give play to the effect of moral education, and make students receive education imperceptibly. With the help of activity requirements and results display, students are educated to gradually form the consciousness of self-cultivation, self-improvement and self-confidence that I can do and I am good at, and then education can enhance self-reliance ability, step out of the pace of self-improvement, develop a healthy and independent spiritual character, and realize the essential requirements of education.

Third, achieve results.

Since the discussion on emancipating the mind was launched, the mental outlook of the whole school has been improved, the cohesion of the school has been further enhanced, the mental outlook of teachers and students has taken on a new look, a new working and learning atmosphere has been formed, the work discipline has been further strengthened, the work style has been changed, the service consciousness and innovation consciousness of cadres and workers have been further improved, and the enthusiasm, initiative and creativity of work have been further enhanced.

In short, through the activities of emancipating the mind, our school's future development ideas are clearer, and our confidence and determination for development are more firm. In the future work, we will continue to emancipate our minds, broaden our horizons, establish and improve a long-term working mechanism with new ideas and new styles, and strive to achieve the benign development of education and teaching in our school.

;