Now the north side of the school apartment 10 has been cordoned off, with signs, and it is forbidden to approach; Students from 20 bedrooms on the first floor to the fourth floor on both sides of the north and east bathrooms have moved out, and the students who have moved out have been properly resettled; Toilets on the first to fourth floors in the east are out of use and closed. Jilin Building Materials Industry Design and Research Institute is carrying out safety inspection on the whole building. According to the current field investigation, it should be a local problem, which will not involve the safety of the whole building. At present, arrangements have been made to demolish all the external walls of the East Toilet on the 1st to 4th floors in the North, so as to eliminate potential safety hazards. The design institute will design a wall repair scheme to repair the demolished wall as soon as possible. According to the final test report, determine the appropriate scheme and notify it in time.