Processing identification process
1: Provide qualified industry and commerce.
2. Buy the lock of survey and design system and its reader in Beijing Jianxinyuan Company.
3. Personnel with professional titles shall provide design experience and relevant achievements.
4. Input the data into the survey and design system, and generate the submitted data (online declaration and printing form the attachment materials). Personnel and performance need to be filed.
5. Extract enterprises and personnel from Henan government affairs network and report relevant information materials.
6: Go to the provincial office and submit the application form.
7 submitted to the provincial construction department for approval, approval time is generally 20 working days (excluding expert argumentation time).
8: Publicity before approval-Announcement after approval-Certificate collection
It will take about three months.
It is my business philosophy to empower with the greatest intention and solve worries. Welcome the survey and design enterprises in Henan province to inquire and negotiate! I will give you the most professional answer.
Qualification standard
1 Qualification and reputation
(1) is an independent enterprise legal person.
(2) It has a good social reputation with a registered capital of not less than RMB 654.38+0 million.
2 technical conditions
(1) The professional equipment is complete and reasonable, and the number of major professional and technical personnel is not less than that specified in the staffing table of major professional and technical personnel in the qualification standards of the application industry.
(2) The main technical person in charge or chief engineer of the enterprise should have a college degree or above, have more than 10 years of design experience, preside over not less than 1 item of engineering design for large-scale projects in the application industry, or not less than 3 items of engineering design for medium-sized projects, and have registered professional qualifications or senior professional and technical titles.
(3) Among the personnel specified in the main professional and technical personnel staffing table, the unregistered personnel in the leading major should be the professional and technical leaders and have presided over at least two medium-sized projects in the application industry, or at least 1 large projects.
3 technical equipment and management level
(1) It has necessary technical equipment and a fixed workplace.
(two) a sound quality system and technology, management, personnel, finance, file management system.