Developer: Caesar Urban Renewal Group (Shenzhen) Co., Ltd.
Building type: tower
Planned households: 924 households
Latest opening time: 2019/12/10.
Estimated delivery time: 202 1/04/30.
Kaiser New World Building is located at exit B of Shabu Station, Dongmen Middle Road, Luohu District, Shenzhen, with a land area of 599 1.5 1 m2 and a total construction area of 57,580.07 m2. There is only one Caesar New World Building with 30 floors and an altitude of 99.05 meters. The elevation of the commercial podium is 18m, with 4 floors in total. The format is commercial, apartment and garage, and the apartment is hardcover delivery standard. The New World Building Project is located at the exit B of Shabu Station, Dongmen Middle Road, Luohu District, Shenzhen, with a land area of 599 1.5 1 m2 and a total construction area of 57,580.07 m2. There is only one project, with 30 floors and an elevation of 99.05 meters. The elevation of the commercial podium is 18m, with 4 floors in total. The format is commercial, apartment and garage, and the apartment is hardcover delivery standard. Caesars New World Building has high-quality educational resources and rich park facilities, which is a rare mature area in the current market. The New World Building Project is located at the exit B of Shabu Station, Dongmen Middle Road, Luohu, next to the 2.05 million square meter landmark of China Resources Hubei Old Reform. The northwest side is close to the bustling Shennan Avenue and Luohu "Golden Triangle". The project is close to Exit B of Sunbu Station of Metro Line 3 and the bus stop, with traffic reaching the whole city, mature surrounding living atmosphere, high-quality educational resources and abundant park facilities.
Details of new world building.