Speech of supervision meeting
Venue: Supervision Meeting

Time: 20xx65438+1October 10.

Focus event: Xu Yexin's chat record in Jiaxing Gas Group.

Speech form: give a speech on the focus events in the form of engineering comments.

Speech content:

A, municipal engineering project summary:

Article 9 Municipal Engineering

Four roads have been handed over: Xinfeng Road (Shenlong Wang Long) Sujia Highway (Guolian Lv Xiongchun)

Jiahu Highway (Liaoyuan Tanghaiqiang) Huayuan Road (Liaoyuan Huqilong)

Two items were handed over: Jinger Road (Shenlong Wanglong) and Mei Feng Road (Guolian Machengwei) cleaning 1 Item: Xincheng Avenue (Zhongyuan Pingping).

Two items of medium voltage inspection: Chenggong Road (Liaoyuan and Hu Qilong)

Xin Meteorology Road (Green Energy Xu Yexin)

Chat record a

When the new meteorological road was purged, Shaoxing Lvneng failed to meet the purging requirements put forward by Sanquan Supervision (hands on the air outlet, no foreign body feeling) and stopped working.

Supervisor's speech: In order to prove fairness, I would like to ask the six responsible persons present whether the acceptance standards are consistent and whether the construction unit thinks the acceptance standards are too high; Meet the acceptance criteria

Whether it is difficult; Whether the construction unit can meet the acceptance criteria. In the future, the construction unit must conscientiously implement the resolutions reached at the construction site, and shall not shirk without reason.

On-site management: For example, regarding the masonry of valve wells, although the construction unit (Liaoyuan Hu Qilong) of "Yuanlu Project" has no qualification and experience, the construction unit carries out the masonry of valve wells in strict accordance with the standards, and the quality and appearance meet the standards. "New Meteorological Road Project (Green Energy Xu Yexin)" valve well masonry is not implemented according to the standard at all. Compared with other construction units, the quality and appearance of valve well masonry are the worst, so (Green Energy Xu Yexin) should seriously consult other construction units after the meeting. For example, regarding the purging of medium-pressure pipelines, the "New Meteorological Road Project (Green Energy Xu Yexin)" actually uses safety valves for purging. Which specification can this purging method meet? There are only seven construction units, and the purging plan was submitted at the urging of the "Owner's Representative (Lin Youyi)". The project leader (Green Energy Xu Yexin) of this project (New Meteorological Road Project) does not understand the inspection procedures, relevant specifications and construction management, which will directly affect the project quality. Compared with the construction workers of other construction units, "the construction workers (Ye) of New Meteorological Road are the worst (Ye:" Blowing one year is not qualified ",and a 40-year-old person actually said such a thing, what kind of master and what kind of slave." Shaoxing Green Energy Company is qualified, but a project leader who doesn't understand specifications, construction procedures and construction management should affect a company's reputation.

Second, the community project overview:

Community courtyard 7 Chu

Four places have been completed: Yulong Jiayuan (Song Jianhua, Fu Jia) and Shi Sheng Haoting (Zhongyuan Pingping)

Jinqiao Mingyuan (Central Plains Dingping) Lichi Manor (Lv)

Three projects under construction were stopped: Egret Apartment, Rome City (Dai Xiaoneng, Fu Jia),

Become the famous capital of China (green energy Xu Yexin)

Chat record b

Xu Yexin (376398070)11:42: 29

The project of the pipe network company is calculated according to the actual workload. Of course, if you don't sign, you won't do it.

Supervisor's speech: During the courtyard pipeline construction of "Lichi Manor Project (Green Energy Xu Yexin)", our supervision project department issued a supervision notice to the construction unit "Shaoxing Green Energy Company", requiring the construction unit to rectify, but such incidents still occur repeatedly in the "Central Famous City Project (Green Energy Xu Yexin)". Compared with other construction units, similar problems in engineering construction are also the worst in "Green Energy Xu Yexin".

On-site management: During the construction of "Lichi Manor Project and Zhongcheng Du Ming Project (Green Energy Xu Yexin)", the construction unit (Green Energy Xu Yexin) failed to rectify the projects required by the supervision office in time, thinking that procrastination would delay the project. My supervision project department specifically asked the construction unit (Green Energy Xu Yexin) to rectify within a time limit at the supervision meeting, but the construction unit could not put it in place, which led to this working attitude of the construction unit.

Management level leads to this kind of engineering quality. I hope that the construction unit (Green Energy Xu Yexin) can practice its internal strength in three aspects: project quality, construction management and working procedure, and dare to talk nonsense without basic skills. Did the pipe network company ask you (Xu Yexin Green Energy) to do this project? You (Xu Yexin Green Energy) are bidding. Make no mistake, such remarks will definitely affect your (Green Energy Xu Yexin) future bidding. From now on, the remaining parts of "Zhongcheng Du Ming Project (Green Energy Xu Yexin)" and the concealed works to be carried out must be submitted for inspection in accordance with the Code for Construction Engineering Supervision (GB503 19-20 13), and then be signed on site, and our supervisors will be present on time. Remember that if you don't give me face, give me three full faces and take the norms seriously, I will never give him face. The words are a bit heavy and fierce, but they are thought-provoking and inspiring. You can't even reflect on yourself. That is to die, and you can't blame me.

Three, residential riser installation project overview:

Residential riser installation at 1 1:

Yangming Road Demolition and Resettlement Community, Shi Xue Apartment B, C (Shenlong Wanglong) Shi Xue Apartment A (Guolian Ma Chengwei)

Wanqing Jiayuan Shi Xue Apartment D (Liaoyuan Tiger Riding Dragon)

Baziqiao Demolition Resettlement Community (Fu Jia Song Jianhua)

Granying County Xiangti Mansion Yundong Apartment (Guolian Lvxiongchun)

Hua Ting, Lv Jing (Zhang Tianming, Fu Jia)

Chat record c

Xu Yexin (376398070)11:57: 37.

Zhejiang province installation project budget quota indoor and outdoor galvanized steel pipe (threaded connection) subtitle

Peel off the contents of the raw material belt on the unthreaded buckle. Attention, brothers. If you want to peel the skin, you must sign the bill.

Supervisor's speech: the person in charge (Zhang Tianming) of "Green View Hua Ting Project (Zhang Tianming, Fu Jia)" has the worst quality, and the construction workers (Xu Pida and Wang Yuhong) have poor quality, which requires strict education. Remember that if you can't keep up with my management rhythm, people or units that are slow to rectify will be criticized by name.

Fourth, summary.

In 20XX, our supervision project department will strictly implement the national standards and design documents, continuously track the implementation of the resolutions of the supervision meeting, the implementation of the owner's supervision requirements and the implementation of various rectifications, and continuously improve the construction status of various construction units. The expected result will be the continuous improvement of project quality.

Engineering quality depends on manufacturing, not management, but only by adopting effective management means can the improvement of engineering quality become a reality. There is only one reason. Good children have milk to eat, and they will starve to death.

There is no absolute fairness in the world, nor here. I don't believe that a messy construction unit like you wants the same treatment as a good construction unit and the same visa? Then I want to ask, if they are all the same, it will be really natural and difficult to supervise.

Shenyang sanquan engineering supervision consulting co., ltd

Jiaxing projects department

20XX 65438+ October 10