Summary of on-site safety production month activities (5 general remarks)

After a colorful activity, I think everyone has a deep feeling. Now, what kind of summary will you have? Let's refer to how the activity summary is written. The following is a summary of the monthly activities of site safety production that I collected for you (generally 5 articles). Welcome everyone to learn from and refer to. I hope it helps you.

Summary of on-site safety production month activities at Shen-Dan Railway Passenger Dedicated Line Station 1 No.4 Work Area "Safety production month" activities were carried out in accordance with the unified arrangements of the bureau and the company. Under the correct guidance of the project leader, the activity plan and implementation plan were formulated, the guiding ideology and work objectives of "Safety Production Month" were defined, efforts were made to popularize the work center of safety production knowledge education, focus on special rectification of the construction site, and implement various rectification measures. After a month's activities, the expected results have been basically achieved. Related activities are summarized as follows:

I. Main practices and achievements

1. Carefully organize and strengthen leadership.

In order to seriously carry out the "Safety Production Month" activities, the four workers carried out their work in four stages: publicity, self-examination and self-correction, inspection and acceptance, and summary and improvement. All the work is closely linked and organically combined, and the activity plan of "Safe Production Month" is formulated, the work objectives and measures are defined, and documents are distributed to all construction teams, and a regional safety production inspection is organized to seriously summarize the activities of "Safe Production Month".

2, serious publicity, extensive ideological education.

This year, the "Safety Production Month" in Shendan No.4 Work Area closely revolves around the theme of "safety responsibility, focusing on implementation", and all levels in the work area have launched extensive and in-depth publicity and education work. During the whole activity, the project department of No.4 work area made full use of various forms and means such as blackboard newspaper, bulletin board, training, education and pre-shift meeting to carry out publicity and launch, which set off an upsurge of learning safety knowledge and enhancing safety awareness in the whole work area, and really created an atmosphere of "everyone stresses safety, everything stresses safety, always stresses safety and prevents accidents everywhere". According to statistics, six construction teams participated in the activities of the 4 work areas. There are 3 hanging bars (horizontally). The construction team organized training and education classes for more than 200 times, held mobilization meetings for 4 times, and organized learning by teams and groups 12 times. More than 20 hidden dangers were found in the activity.

3, with the construction site management and safety production data inspection as the breakthrough point, highlight the special safety management.

Construction site and safety production materials are the focus of safety production supervision and management. Eliminating hidden dangers on site and improving preventive ability are the basis of safety work. Therefore, in this activity, combined with the special rectification work, we pay close attention to the implementation of the on-site safety system, investigate the signs of various accidents, and implement on-site protective measures. Focus on special treatment: focus on preventing and monitoring construction sites that may lead to accidents such as construction collapse and scaffolding overturning, as well as construction sites such as demolition, hoisting and aerial work. During the activity, the construction team worked closely around the work objectives and achieved remarkable results, and the safety protection level of the construction site was significantly improved. During the whole activity, the supervision of four work areas was strengthened, and four notices of rectification of hidden dangers were issued during the activity, so that those who failed to make rectification would never be spared, which effectively promoted the safety management of all construction teams.

4. Don't go through the motions to find problems and sum up experience seriously.

Finding problems is to nip the signs of accidents in the bud and avoid major accidents. During the activity, the project department of the fourth work area found out a number of hidden dangers and problems, and found out the weak links of safety management of the construction team. According to the principle of "three decisions", all hidden dangers and problems were rectified, and the causes of the identified weak management links were carefully analyzed and countermeasures were formulated. On June 15, the safety inspection team led by project manager Guo Zhenwu conducted a comprehensive safety inspection of our work area. The inspection team went deep into each construction site, consulted the relevant materials of safety production on the construction site and checked the inspection methods on the construction site. After the inspection of each work site, according to the inspection situation, organize a site feedback meeting to inform the inspection situation. During the inspection, the inspection team pointed out the potential safety hazards existing in the construction site, such as the non-compliance of safety production materials, poor on-site protection, and confusion in temporary power consumption, and put forward specific rectification requirements, requiring serious rectification of the problems detected and timely verification of the rectification situation.

Second, the existing problems and the next step

This "Safety Production Month" activity has achieved certain results in enhancing the safety production awareness of all employees, promoting the safety production management in our work area and improving the safety protection level of the construction site. However, we are also clearly aware that there are still many problems and weak links in the management of production safety in our region: there are still a few enterprises, especially those in charge of enterprises, who are not aware of production safety, pay attention to production but not safety, pay attention to progress but not guarantee, and pay attention to efficiency and management; The rectification of hidden dangers of accidents, education and training of safety production and the promotion of basic work of safety production need to be further strengthened.

In view of the shortage of safety production month activities and the outstanding problems existing in the current safety production work in the whole region, we should strengthen management and strive to improve the overall management level, focusing on the following points:

1. Consolidate, develop and improve the achievements of "Safe Production Month", lay a solid foundation for long-term production management, and strive to achieve the annual goal of safe production.

2, to further strengthen the improvement of ideological understanding, especially the safety first responsible person. Supervise and urge the construction unit to further improve the safety organization, fully equip with full-time security officers, improve various safety management systems, and implement the responsibility system for production safety.

3. Conscientiously implement the Regulations on the Administration of Safety Production in Construction Projects, further implement the responsibility for safety production, and form a good situation of joint management.

4, continue to strengthen safety supervision and management, put an end to the vicious accidents of mass casualties. For the links with poor safety management, we should intensify rectification, and we will never let go of those that are not in place.

5. Seriously investigate and deal with production safety accidents. Strictly implement the provisions of the accountability system for production safety, accident reporting system and accident investigation. Adhere to the "four don't let go" and seriously investigate and deal with the construction units that have accidents; Teams and individuals who conceal accidents, make false reports or report accidents late will be severely punished in accordance with relevant regulations, and the punishment will be aggravated.

The "Safe Production Month" activity has been successfully concluded and achieved the expected results. Our work area will continue to consolidate the results. In the second half of the year, we will strengthen safety production management, implement various safety responsibility systems, strengthen civilized construction and safety supervision on the construction site, and strive to achieve this year's safety production target.

Summary of On-site Work Safety Month Activities 2 According to the requirements of the Notice on Carrying out Work Safety Month Activities for XX Years in Material Plan 195, our company earnestly carried out the following activities:

1. The leaders of the company attached great importance to this "Safety Month" activity, and set up a "Safety Month" activity leading group with Duan xx, the general manager of the company (who is also the director of the Safety Committee), and Liu xx, the chief engineer, as the deputy heads, earnestly organized and carried out the spirit of the superior documents, and took the "Safety Month" activity as an opportunity to create public opinion with great fanfare, laying a good foundation for ensuring the safety production of our company.

1. We have defined the theme of "people-oriented, safety first", focused on the implementation of the Law on Work Safety, the Decision of the State Council on Further Strengthening Work Safety, the Regulations on Work Safety License and the Regulations on the Administration of Work Safety, and vigorously publicized the principles and policies of the Party and the state on work safety through the "Safety Month" activities. Vigorously create an increasingly strong atmosphere of "caring for life and paying attention to safety", comprehensively implement employee education and training, improve the safety culture quality of all employees, grasp the core of "strict requirements", achieve "three no injuries" and ensure a good safety production environment for our company.

2. Jixian Safety Supervision Bureau ordered 3 sets of monthly safety publicity wall charts, 3 sets of xx safety production management regulations publicity wall charts and 60 separate volumes, and distributed them to all units for posting, learning and printing more than 200 safety publicity materials.

3. Strictly require all units to carefully check themselves, not to follow the trend, especially important operations such as blasting operation, aerial work and hoisting operation, and to be more careful and make serious rectification when hidden dangers are found. Organize all employees to take more than 350 closed-book exams on basic safety knowledge, and those who fail to reach 60 points are ordered to be laid off for study to improve the safety awareness of all employees.

4. Make exhibition boards and participate in the safety production consultation and publicity day organized by the Safety Committee of Jixian County.

Second, conduct a safety production review. On 5th, the general manager led a team to Jidong construction site,13rd, the Ministry of Security went to Pangu Project Department for reexamination, and on 24th, General Manager Liu led a team to inspect the factory building.

1, Jidong Project Department hangs two big banners and posters, posts various safety propaganda slogans and wall charts in living quarters and construction sites, and buys formal safety signs. At present, the mining of Mingshan mountain and the highway up the mountain are all completed, and there are no hidden dangers. The concrete pouring of the crushing chamber has been completed and the equipment installation is under way. Emphasize strengthening safety protection, pay attention to the safety of electricity use, and prohibit illegal operations.

(1) Continue to maintain the system of regular safety inspection, and participate in the joint inspection of nine units under construction organized by the cement plant every Tuesday and Friday, and make timely rectification when hidden dangers are found.

(2) In terms of electricity consumption, one machine, one brake and one leakage protection are achieved.

③ In terms of equipment use, the brakes, direction, lighting and operation of the car are in good condition.

(4) Adhere to the daily team inspection.

2. Under the personal organization of the project manager, Pangu Project Department carefully organized and studied the relevant documents, laws and regulations of superiors, made four banners to hang in the living quarters, production sites, transit warehouses, crushing and other construction sites, made 40 colorful flags to be inserted in the 1 belt corridor, wrote more than 100 safety slogans, and posted and hung 20 safety warning signs at the construction site respectively.

(1) Adhere to the one-day inspection system of the shift.

(2) The hoisting of high-altitude steel structure is basically in place, and there are only three spans left in the high-voltage line. When the power is cut off and the line is changed, it is necessary to contact the power supply bureau for hoisting. It is required to wear protective equipment and command in a unified way. It is forbidden to operate illegally to ensure safety.

(3) The arrival of equipment is uneven, and it is impossible to install all the equipment in place. However, attention should be paid to the safety of electricity and gas use, especially for welding and hoisting at high altitude, and safety belts (ropes) must be worn.

On March 3rd and 24th, General Manager Liu led a team to inspect the safety of the workshop. They all insist on the daily inspection of the team. The building has good environmental sanitation, the guards on duty are serious and responsible, and the electricity and gas are standardized. It is required to turn off the main power supply and gas supply before work, and check whether there are cigarette butts littered by guests in the guest room. The workshop site is relatively standardized, with warning signs and posters posted on the wall, but an individual was ordered to correct the improper use of labor protection articles on the spot.

4, 30, in the second quarter, building, workshop percentile assessment.

5. Other units have also carefully organized safety month activities, safety production self-inspection and reporting materials.

3. According to the people's government document (J 1 1) Opinions on Implementing Hundred-point Assessment in Safety Production, during the "Safety Month" activity (28th), the leading group of hundred-point assessment in Jixian County came to the company to conduct hundred-point assessment on General Manager Duan and General Manager Liu. There were no casualties in our company in the first half of the year, and the assessment score was 84%. The evaluation team affirmed our work safety in the first half of the year and put forward some suggestions for improvement, which promoted our work safety and improved our understanding of the importance of safety in production. We will work hard and strive for better results in the next six months.

Through this safety month activity, the safety awareness of all employees in our company has been greatly improved, and employees have realized the fundamental change from wanting me to being safe, which has laid a solid foundation for our company's safety production.

Summary of On-site Work Safety Month Activity 3 In order to conscientiously implement the Notice of Beijing No.2 Municipal Company on Work Safety Month Activity Plan, the project department compiled the work safety month activity plan of the project department in combination with the actual situation of the project department, and carried out work safety seriously according to the planned deployment. The safety work of "Safety Production Month" is summarized as follows:

First, strengthen leadership and management.

In order to strengthen the organization and leadership of this safety production month activity and ensure the implementation of various activities in safety month, the project department set up a 20xx safety production month activity leading group. Team leader: xxX (project manager); Deputy leader: xxX (production manager); Members: composed of project safety department, technical quality department and construction team leader, responsible for leading and organizing the implementation of this activity. Therefore, the management of the project department attached great importance to the safety month activities, and held, studied and carried out a special mobilization meeting with the theme of "strengthening the red line awareness and promoting safe development".

Second, strengthen publicity and create a safe atmosphere.

In order to create a good atmosphere for safety production month activities, our project department closely followed the theme of this year's Beijing safety production month activities, "Stick to the red line awareness and ensure urban safety", purchased 50 posters and 5 safety month publicity banners and posted them on the construction site. During the safety production month, the number of publicity gardens such as columns and blackboard newspapers will be set twice. On June 13 and June 20th, he participated in the experience activities of Chaoyang District Safety Museum; On June 14, an emergency drill for flood control was conducted. On June 16, migrant workers were organized to carry out on-site answering training activities in Safety Month.

Third, do a good job in safety education and training.

During the "Safety Month", the project department will provide entrance safety education and training for new and on-the-job teams, and guide employees to firmly establish the idea of "safety first" from the aspects of construction production safety and fire protection work by using the "night school for migrant workers and fire lecture hall" to improve their awareness of safety production. Grasp the safety work in essence, so that the safety work is deep, detailed and practical in the minds of operators. This time, more than 30 people were trained in safety production.

Fourth, carry out in-depth safety inspection work and put it in place.

The project department conducts joint inspection once a week to find out the safety problems and hidden dangers this week, as well as the implementation of hidden dangers last week, and pays special attention to the safety work of key parts. The project department carefully investigates the hidden dangers of the project equipment, safety protection, working environment and safety awareness of workers, and supervises the rectification and follow-up to eliminate all kinds of accidents in the bud. Check twice this month, investigate and deal with 5 hidden dangers in production safety, and rectify 5 cases.

Five, continue to do a good job in safety, to ensure the smooth completion of the work.

Through the activities of "Safety Production Month", we will pay close attention to safety work in future work, and carry out supervision and inspection during construction as the work progresses. In particular, those dangerous parts and major hazard sources should be strictly controlled, the scheme should be implemented well, and the safety technical disclosure should be in place, so as to successfully complete the Anningzhuang East Road project.

Monthly summary of on-site safety production 4. On-site safety work has always been the top priority of all work. As a safety officer, I have been adhering to the principle of "people-oriented, safety first, prevention first, combining prevention with elimination" and insisting on the combination of management responsibility and specific measures. With the strong support and leadership of the leaders, combined with the actual work, I re-formulated the fire emergency plan, conducted fire emergency drills, and organized regular daily safety inspections. During the inspection, constantly improve the site safety system to eliminate all kinds of safety hazards. Since the beginning of this year, Qihoo 360 Project has carried out joint fire safety inspection for as many as five times, fire safety knowledge and skills training 1 time, fire emergency fire-fighting drills 1 time, carried out self-examination and self-correction activities for many times, and held a fire safety meeting once a week.

First, pay attention to fire safety work to ensure safe production.

1, hidden trouble investigation.

Investigate hidden dangers in the construction site, office area, living area, processing plant and warehouse, focusing on fire control and electricity consumption during construction. After the inspection, timely sort out hidden dangers, strictly implement the responsible person, time, funds and measures, and quickly rectify.

2. Security system.

Fire safety management system, hot work approval management system and fire safety inspection management method were introduced. Hot work must apply for approval, so as to achieve "five hot work in place", that is, "hot work approval in place, flammable items in place, special care in place, fire-fighting measures in place, and fire-fighting equipment in place". Do a good job in daily fire safety inspection. Implement the public security patrol system, set patrol points in office area, living area, construction site, material yard, warehouse and other risk points, arrange public security safety supervisors to patrol and sign in every day, and feedback the patrol situation.

Second, the implementation of posts, publicity and education for employees.

1, safety education.

Focus on employees to watch the video of Tianjin 20xx building system security comprehensive emergency drill. This drill simulates the collapse of tower crane and formwork support, and the accident reporting procedure and emergency rescue procedure are carried out in an orderly manner.

2. Training instructions.

The branch manager gave a wonderful explanation on the practical application effect and prospect of the combination of smart site application and safety management in recent years, and all employees had a further understanding of the project's safety standardized physical facilities, smart site application and good civilized construction image.

3. Emergency drills.

Actively carry out hidden dangers investigation and effectively realize safety affairs. In each project department, I actively established a hidden danger investigation and management system, earnestly carried out hidden danger investigation and registration, carefully monitored and guided the management process, listened carefully and collected reasonable safety suggestions and opinions from employees, effectively reflected employees' safety wishes to superiors, enhanced the safety awareness, self-awareness and prevention awareness of construction personnel, and continued to pay close attention to the identification and control of major hazards. Effectively implement the "one post and two responsibilities" for safety production, constantly consolidate the foundation of safety development, and ensure that safety management measures are implemented.

4. Promote inspection through training.

In terms of safety production, the activity of "promoting inspection through training" was carried out, and new safety management regulations for dangerous sub-projects were promulgated, and three obvious differences were extracted from the document No.87 of 20xx. Through the detailed analysis of production safety accident report and production safety accident disposal, the key points of enterprise emergency management are expounded, so as to fully understand the rich connotation and management methods of safety management and effectively ensure the production safety of enterprises and projects!

5. Strengthen education.

From "I want to be safe" (passive management) to "I want to be safe" (active pursuit), we will improve the safety awareness and skills of all staff through various types of education and training, such as admission three-level education, pre-shift safety publicity, daily safety education and training, monthly safety education and various special safety education, with emphasis on safety education and training.

Third, strengthen internal management and effectively eliminate potential safety hazards.

1, the whole staff continued to innovate and applied safety ropes in many places. In view of the common safety problems in construction and production, special safety innovations were planned with emphasis, and the combination of dredging and blocking was made to try to break the common safety problems one by one from the root of the problems.

2, the preparation of production safety accidents comprehensive emergency plan. With the progress of engineering construction, prepare various special emergency plans for deep foundation pit construction and fire fighting. All employees, including managers and operators, disclose the emergency plan in time to ensure that everyone knows the division of responsibilities and measures for emergency response.

3. According to the progress of the project, timely plan and organize various types and forms of emergency drills such as fire fighting and electric shock. Conduct simulated emergency tests from time to time to check the emergency response of the general contractor and subcontractors. Conduct desktop emergency drills regularly every month. Through high-frequency desktop emergency drills, discuss emergency skills, strengthen the emergency atmosphere, let everyone know their emergency responsibilities, and always tighten the string of emergency.

4. Organize weekly safety inspection. Introduce the safety inspection system, inspect the inspection points in the office area and living area every day, and the safety supervisors inspect the inspection points in the construction site every day, fill in the inspection records and supervise the rectification. Introduce safety inspection system. Put forward the concept of "everyone is a safety officer", upload photos of violations or hidden dangers to the safety inspection system, push them to the responsible person at the first time, and implement rectification according to the principle of "four decisions". If the rectification is not in place within the time limit, remind and deal with them at different levels.

5. Hold weekly safety meeting and monthly safety production team meeting, summarize and analyze the operation of safety management system in the construction process, and deploy the key points and measures of safety control in the next stage. Evaluate in time after each safety inspection to improve the inspection effect.

Safety work is the top priority. We should further enhance our sense of hardship and responsibility, not be careless in our work, and try our best to strive for effective measures to improve the level of supervision and comprehensive management. On the basis of summing up the achievements, we will continue to find the gaps, find the weak points, clarify the direction of efforts, and strive to push the safety work to a higher level.

Summary of Work Safety Month on Construction Site 5 Life is precious and safety comes first. In many factories, safety production summary is made once a month, not only to remind employees to have safety awareness at all times, but also to check production loopholes, avoid safety problems and nip in the bud.

I. All kinds of accidents in the whole region

By the end of X, all kinds of accidents occurred in the whole region, including deaths and injuries, and no serious accidents occurred in production safety.

1. Enterprises (including buildings): Up to X/X, there were 1 incident of employee casualties in enterprises (including buildings) in the whole region, with death 1 person and serious injury 1 person, and no serious production safety accidents occurred.

2. Fire: By the end of X, there were basically many fires in the whole region, causing casualties and direct economic losses of about 10000 yuan. No major fire accident occurred.

3. Road traffic: As of X-day, the units and residents under the jurisdiction of the town have suffered road traffic accidents, deaths and injuries, and there has not been a major or extraordinarily serious road traffic accident with more than one death.

Second, the main work situation

(1) Establish regulations and strengthen safety planning and system construction.

1. Carefully prepare the 11th Five-Year Plan for urban safety production. In order to implement the concept of "safe development", in accordance with the requirements of the county party committee, the county government and the county safety supervision bureau, closely around the goal of building a harmonious and safe society in an all-round way, after extensive investigation and repeated revision and demonstration, the Eleventh Five-Year Plan for Town Safety Production was compiled as a key special plan of our town and incorporated into the Eleventh Five-Year Plan system for national economic and social development of our town.

2. Strengthen the construction of safety production. Do a good job in docking, revising and perfecting the original safety production system documents in the two towns, and formulate the Work Rules for the Investigation and Handling of Production Safety Accidents, Opinions on the Safety Accident Reporting System in our town, Emergency Plan for Extraordinary Safety Accidents in the town, Emergency Plan for Dangerous Chemical Accidents in the town, Working System of Patrol Squadron for Production Safety in the town (for Trial Implementation) and Emergency Plan for Major Hazard Sources in Three Towns. At the same time, in order to further promote and implement the responsibility system of administrative law enforcement in production safety, the subject, basis and behavior of law enforcement in production safety are sorted out.

(two) to strengthen the responsibility system for production safety, to prevent serious accidents.

1, strengthen the safety responsibility target assessment. First, in June of 1 year, safety production target management assessment was carried out in all administrative streets and functional departments of the town, and rewards and punishments were cashed. Second, according to the safety production control indicators issued by the county, combined with the actual situation of our town, layers of safety production responsibility letters were signed. And public security, safety supervision, construction, economy and trade (transportation, tourism), culture, environmental protection, sanitation and other departments responsible for the supervision and management of production safety will be included in the scope of assessment. The third is to formulate detailed rules for the assessment of safety production target management in streets and related functional departments, and monitor, analyze, supervise and inspect the implementation of safety targets in a timely manner. Fourth, all streets and relevant functional departments signed letters of responsibility for production safety with enterprises within their jurisdiction to promote the implementation of production safety work.

2. Strengthen the construction of safety production institutions and improve the safety production supervision network. The first is to adjust and enrich the members of the town safety Committee. Incorporate the District Federation of Industry and Commerce into the Safety Committee to play its coordinating and communicating role in safety production; Establish and improve the system that the street safety committee and relevant functional departments regularly report to the town safety committee. The second is to strengthen the construction of safety production law enforcement and supervision team, and improve the intensity and professional level of safety production management. According to the establishment of administrative law enforcement agencies issued by the city, the town safety production law enforcement brigade was established, and a number of personnel were openly recruited and transferred. The third is to strengthen the construction of street safety production inspection team. Production safety patrol squadrons have been set up in all streets of our town, which has effectively improved the situation of insufficient street supervisors and passive work in our town.

(three) to implement the main responsibility of enterprise safety production, and to consolidate the foundation of enterprise safety production.

Implementing the main responsibility of enterprise safety production is a very important work in our town this year. Combined with the reality of our town, the pilot work plan of implementing the main responsibility of enterprise safety production in the town was formulated, and a work leading group headed by the deputy mayor in charge was established. In the first half of the year, home furnishing enterprises first carried out pilot work and achieved remarkable results. In the second half of the year, it began to be fully promoted in the whole town, and the following work was done specifically: First, strengthen publicity and launch, popularize the pilot experience, and create a good working atmosphere. From June 1 day to June 3 1 day, a one-month publicity campaign was launched. The second is to refine the work plan and strengthen the guidance service. At the end of X, the town safety supervision department conducted training and counseling for the first batch of units that promoted the main responsibility of enterprises, so that enterprises could clarify their responsibilities and tasks.

The third is to strengthen training, raise awareness and clarify work ideas.

In the first ten days of X, the District Safety Supervision Bureau organized two "Counseling Reports on Implementing the Main Responsibility of Enterprise Safety Production in the Region" to explain the importance, necessity and operability of implementing the main responsibility to the responsible persons of 22 streets in the region and the first batch of enterprise leaders and specific staff who implemented the main responsibility. After the meeting, each street took active actions, set up a leading group, improved the work plan of promoting and strengthening the main responsibility, and determined the first batch of enterprises responsible for promoting safety production in each street, totaling 13.

The fourth is to sum up experience and implement measures.

The first batch of eight pilot enterprises, combined with the standard requirements of the "Guidelines for the Evaluation of the Responsibility Degree of Small and Medium-sized Enterprises in the City", were docked again, and the supporting measures and perfect systems were fully implemented. At the beginning of X, our district made a comprehensive acceptance of 8 pilot enterprises.

;