Quality engineering summary report 1
Over the past 20 years, under the training and guidance of the station leaders, I have kept pace with the times and worked hard, successfully completing various tasks assigned by the organization and the station leaders, and made my due efforts to complete the project quality work tasks. This year's work is summarized as follows:
I. Daily supervision work
This year, I participated in the supervision and management of newly started projects with a total area of _ _ _ _ _ million square meters; Carry-over project with an area of _ _ _ _ _ million square meters. There are _ _ carried-over projects that have been accepted, _ _ projects that have been newly opened, and _ _ projects that are being accepted. On-site supervision and inspection for _ _ _ _ times, and the qualified rate is 100%. According to the arrangement of the station leader and the relevant requirements of our station, we will strictly implement the "three systems" such as written commitment, permanent signs and information files, increase the daily supervision and spot checks, and strengthen the daily supervision and guidance services during the construction process. For the problems and hidden dangers found, rectification notice and shutdown notice shall be issued according to relevant specification documents and actual conditions.
Second, implement the supervision and reporting system.
At the beginning of the implementation of the "supervision report system", our station was identified as one of the _ _ pilot units, and in accordance with the requirements of the notice, the supervision report system was fully implemented in _ _ _ construction projects. This year, as the specific contact person of this work, I summed up some experiences in the process of implementing this system. In order to make the supervisor fill in the form more standardized, intuitive and easy to understand, I designed and formulated a special form according to the system requirements, which was also recognized by the main station. Before the introduction of the formal system, at the request of the central station, we assisted in formulating the "Weekly Report" of the supervision report, and put forward some suggestions on the draft system, which was adopted by the central station.
Third, the statistical work of engineering quality supervision
In order to provide accurate data for the unit at any time and analyze the project quality regularly in the completion of the project quality work goal, I have done a lot of engineering statistics this year under the guidance of the station leaders. In promoting the accreditation, a statistical table of projects not accepted for filing in _ _ _ _ District was made; In the implementation of "Engineering Quality and Safety Improvement Action", submit the regional engineering quality report to the main station every quarter; In the analysis of engineering quality situation, the basic data of engineering quality supervision in the first half, the second half and the whole year in _ _ _ _ _ area are counted, and many statistical tables are made in _ _ _ _ _ area.
Four. Completion of financial work
In addition to the daily supervision and management of project quality, I also undertook the cashier work in the station this year. I haven't studied finance systematically, but I haven't slacked off at all. After two years of accounting guidance and self-study and exploration, I am now familiar with and master related businesses, and successfully complete monthly bookkeeping, closing and accounting treatment within 20 _ _ _. Declaration and payment of work-related injury insurance, medical insurance, individual tax, provident fund and other items; Business dealings between banks and other departments and payment of various daily office expenses.
Quality engineering summary report II
Time flies, time flies. On this day of saying goodbye to the old and welcoming the new, I look back on my work in the past year. With the support and help of company leaders and colleagues, relying on my own professional foundation and work experience, in accordance with the company's unified deployment and requirements, closely around the _ _ _ construction project, with low consumption, high efficiency, quality assurance and on schedule as the goal, I fully fulfilled the management functions of the engineering department. Do everything possible to ensure the realization of the set goals throughout the year and better complete the tasks assigned by the company, and the overall construction of the engineering department has also jumped to a new level. The work of the past 20 years is briefly summarized as follows:
I. Completion of tasks throughout the year
It is both an opportunity and a challenge for me to get in touch with ground source heat pump at the beginning of the year. It is more important for me to meet such a challenge. To this end, I use my spare time to collect and learn more about ground source heat pump, so as to consolidate my professional knowledge and meet the challenge. Do a good job in bidding for pile foundation construction units and supervision units. After the measured road elevation is inconsistent, the four-line diagram provided by the plan is inconsistent with the actual surveying and mapping data of the parcel, and then it is reflected to the design institute, which adjusts the overall evaluation with the actual measurement data. Draft supplementary agreement and earthwork leveling contract between supervision unit and pile foundation unit.
Cooperate with _ _ _ _ to apply for a construction permit. In the early stage of bidding, I conducted a comprehensive understanding and research on the bidding work and became familiar with the policies and regulations of key links. Solve the water and electricity problems in the construction site. Due to the tight working time and heavy workload of _ _ _ _ _ _ site leveling, I arranged all earthwork leveling work at the site, and adopted the method of stubble pressing, interlocking and overall promotion to do a good job of connecting the upper and lower links in time to ensure the normal development of pile foundation construction. In the process of pile foundation construction, due to the complex geological conditions, the design length of pipe pile does not meet the actual geological requirements. I organized personnel to conduct geological exploration again, which overcame the difficulties of water cut, power cut and temporary construction, assisted the exploration unit to complete the geological exploration task on time, and ensured the smooth progress of pile foundation work.
Due to the tight construction period and the heavy tasks of foundation pit support and earthwork, the construction unit has to carry out a lot of night construction besides daytime construction. In order to ensure the construction progress, I often go to the site to track the construction at night under unfavorable natural factors such as winter and rainy days, which creates conditions for the construction unit to coordinate and solve the problems encountered at any time, and also creates conditions for the main project of earthwork construction period to start ahead of schedule. Because of the complexity involved in the construction, I haven't had a day off since the project started. I have to leave the construction site after 9: 00 every night, giving up the opportunity to rest on holidays, and always insisting on timely coordination and solving various problems encountered in the construction.
Second, strengthen self-study and improve professional level.
Years of accumulated work experience have made me feel a heavy burden on myself, and also made me deeply feel the importance of learning. Only by constantly maintaining and improving one's work and study ability can one have sustained fighting capacity and work innovation ability. Over the past year, I have worked hard to broaden my personal knowledge, strengthen my study of real estate specialty and related legal knowledge, strengthen my understanding of the context and trend of real estate development, as well as the surrounding environment and the development of the same industry, deeply understand the overall planning of the company, and know all kinds of situations of the company like the back of my hand. In the coming year, I will continue to take study as an important work plan to improve my practical working ability and professional quality, adapt to the development of the times and the company, and contribute my due strength to the development of the company.
Three, grasp the quality of the project _ _ _
_ _ _ _ project is a key project, so it is particularly important to pay special attention to the quality of the project. In management, I always adhere to the concept of "carving by digging", comprehensively implement refined and scientific management, conscientiously implement various measures to create excellence, carefully do every working procedure and every link, and strictly supervise and control. While assisting the engineering supervision company, it has gradually formed its own engineering quality supervision system. Give priority to supervision, supplemented by self-construction, and strive to build _ _ _ project into _ _ _ project.
Four, complete the _ _ _ _ project foundation engineering
In order to successfully complete the main project of the _ _ _ _ project, especially the basement and waterproof layer construction in the main construction stage, considering the rainy weather, improve the company's capital utilization rate and save the company's resources, such as using small well point precipitation in the construction process, overcoming the problems of high groundwater level and rainy season construction, and successfully completing the foundation project.
Looking back on the work in the past year, although some achievements have been made and affirmed by the company leaders, these achievements can not be achieved without the support and help of the company leaders, the encouragement and help of various brother departments and the efforts of the engineering team to sum up the achievements. I still see many shortcomings, such as strengthening the on-site management experience and better improving the company's resource utilization. The summary of the results only makes me face the actual work situation more objectively, and also encourages me and my team members to make persistent efforts to achieve better work results next year and make progress and growth together with the company.
Quality engineering summary report 3
Leaders:
Hello! First of all, I would like to thank the company for providing a good working environment and the leaders for their encouragement and support. In the work of this department, I have always been strict with myself, conscientiously do every task assigned by the leaders, humbly ask my colleagues for professional knowledge, and constantly improve and enrich myself.
In production, the products are inspected in strict accordance with the process flow, and the first product is self-checked against the sample standard before production to ensure normal production. First product inspection, first process confirmation. Patrol inspection at work and inspection at the production site to find problems in time and prevent the occurrence of nonconforming products. Carry out process control, whether the fluctuation of quality data is reasonable and whether the process is in a stable state, cooperate with relevant departments to analyze and find out the causes of nonconforming products, and take corrective and preventive measures to prevent the occurrence and recurrence of nonconforming products. Participate in the handling of quality anomalies, and follow up corrective and preventive measures to confirm their effects.
Do a good job of supervision in the inspection process, find and correct the problems in the inspection process in time, and strictly control the processes with high quality requirements. Continuously improve the quality according to the production situation and further improve the qualified rate of products.
Be more careful in your work, carry forward your advantages, improve your shortcomings, clarify your work ideas, improve your work efficiency, do your job with a modest attitude, work actively and enthusiastically, create value for the company, and create a better future with your colleagues.
Quality engineering summary report 4
The _ _ _ project has been going on for more than a year since it was officially launched. In this more than a year, the project department has always insisted on "implementing comprehensive management and strengthening implementation" as the core concept of project management and the guiding ideology for carrying out various tasks. Seriously study and implement the provisions of the company's management system, carefully design and plan according to the characteristics of the project and the quality requirements of the owner, and establish and improve the internal quality management system and related program documents of the project. The job responsibilities and basic working ideas were clarified, which laid the foundation for the smooth and orderly development of housing construction. The quality management work this year is summarized as follows.
First, the improvement of the internal quality system of the project and the implementation of the quality responsibility system
Combined with the actual situation and engineering characteristics of this project, _ _ _ _ Project Department has established a quality assurance system with the project manager as the core, and implemented a quality management responsibility system under the leadership of the project manager. Make the work functions and responsibilities of each department, team and post clear, the competent elements clear, the professional interfaces closely linked, the quality management of each department coordinated, and the quality management information channels unblocked to ensure the efficient and orderly operation of the internal quality system of the project.
The project leading group also analyzed the key and difficult points of the project structure and quality control work together with the members of the project department, as well as the weak links of the previous project quality management work, carefully planned and deployed, so as to control the key parts, and each major working procedure has a special person responsible for quality management and control. For the _ _ _ _ _ building currently under construction, the project has newly determined the responsible person, and has truly been responsible for the post, the person and the process. According to the requirements of the company's management system, identify the laws and regulations involved in the project construction and the standards and specifications to be adopted to ensure their effectiveness and practicability. Effectively implement continuous improvement and constantly improve the quality management system of the project department, so as to better guide the work of the project department, ensure the smooth realization of the quality objectives set by the project department, and complete the construction tasks with high quality and efficiency.
Two. Compilation and implementation of quality management procedures and systems
According to the requirements of the company's system documents and the key and difficult points of project control, the special process documents and implementation plans are formulated in a targeted manner. In view of the changes in the current construction process, the project has revised a number of quality management systems and partial construction schemes, such as document preparation regulations, project quality plan, project measuring instruments and equipment management regulations, project quality inspection plan, project nonconforming product treatment regulations, and quality work reward and punishment rules. Strictly implement the technical disclosure system, and earnestly do not disclose or construct. Before the start of each work, detailed technical disclosure shall be made to all construction management personnel involved in major sub-projects and processes, and the construction procedures, technological processes, operation points, quality requirements and safety precautions shall be defined.
According to the determined inspection and test objects and methods, select all kinds of inspection, measuring and test equipment that meet the accuracy requirements as required. Before all measuring and measuring instruments and equipment used in this project enter the site, it is necessary to check whether the measuring instruments and equipment are in good condition, whether there are qualified verification reports and whether the appraisal results are within the validity period. It is forbidden to use measuring instruments without measurement verification certificates or beyond the validity period for inspection and test related to the project quality. Register the qualified measuring instruments and equipment entering the site, and establish a measuring account.
Make an inspection plan for measuring instruments and equipment in advance, take back the measuring instruments and equipment in use and about to expire in time, and prevent unqualified measuring instruments and equipment from affecting the engineering quality and even causing rework. Establish an effective incentive mechanism to stimulate the enthusiasm of employees. The project department has formulated the detailed rules of rewards and punishments for quality work, and conducted weekly/monthly appraisal and selection, giving praise and material rewards to the personnel and individuals who have outstanding performance in project quality management and excellent quality of engineering entities.
Third, quality education and training.
Since the beginning of this year, the project department has organized two _ _ _ _ labor competitions, two system internal audits and one system external audit. The owner, the superior competent unit and the leaders of the development zone have come to our project department for special inspection activities many times. It can be said that all kinds of inspection and welcoming work run through the whole construction process of the _ _ _ _ project. Numerous inspection and quality activities put forward higher and more severe challenges to the project quality management team, and also brought opportunities and platforms for the training team. Taking this opportunity, the project department has done a lot of effective quality publicity work, which has strengthened the quality awareness of managers at all levels and all contractors.
According to the spirit of various activities, the project department has carried out corresponding special education and learning on quality culture and professional and technical knowledge. In practical work, we should pay attention to the spirit of mutual assistance, create a competitive atmosphere of "catching up, helping and surpassing" and cultivate a good learning atmosphere. Organize skilled and experienced workers to the conference room to give lectures to other construction workers and share their work experience. Everyone spoke extensively to discuss the quality problems in the construction process, summed up the experience and skills of improving personal technical level, learned from each other's strong points and improved together.
In education and training and daily work, make friends with every worker's master, so that young technical cadres can be educated in various quality education and training, be improved and get practical results, and let every employee in the project department establish the concepts of "my quality, my responsibility, my commitment" and "endless pursuit, products represent character", which promotes the majority of employees from "learning from me" to "advanced from me"
Fourth, the construction stage quality control
The quality management of the project department adheres to the on-site management system of "weekly plan control and monthly plan compulsion". The quality department should coordinate and analyze the key points of quality control and construction difficulties of each sub-project, formulate feasible solutions in detail and formulate detailed measures. Establish a number of communication platforms such as pre-shift meeting, technical disclosure meeting and special meeting, strengthen the quality inspection and acceptance of the construction process, strengthen communication, and ensure the smooth flow of quality information channels of the project department, thus ensuring the quality of engineering construction.
Organize technical leaders and team leaders of various disciplines to extensively carry out the comprehensive inspection of "comprehensive inspection, special treatment and elimination one by one", and make it a project quality management system and make it normal. Combined with the inspection situation, formulate corrective and preventive measures, and write a written notice, implement the model to guide the way, praise the advanced, and spur the backward. Obey the inspection, guidance and supervision of the construction unit, supervision unit, design unit and quality inspection station, understand their suggestions with an open mind and cooperate with the construction unit and supervision unit with heart.
The key, difficult and weak links of engineering quality control are listed as the theme of weekly quality work. Concentrate on tracking and checking the key points, difficulties and weak links of quality control one by one, and carry out quality theme week in cycles. Each major shall establish a perfect on-site inspection database, analyze the on-site quality data, summarize the quality rectification situation this week, and formulate the quality work plan for next week. Engineering and technical quality personnel should follow the classes and solve technical problems in construction at any time. The quality inspector has the right to reject the quality. If they are found to have violated the construction procedures and used unqualified materials, they have the right to stop them. When they find problems, they immediately report to the competent leaders and quickly propose solutions to nip quality problems in the bud.
Five, do a good job of project completion and acceptance.
At present, it is very close to the delivery date next year, and _ _ _ is a special project. After the handover next year, it needs the acceptance of construction and supervision units, as well as the acceptance of small owners. In order to ensure the smooth completion and acceptance next year, the on-site quality inspection and acceptance shall be strictly controlled in accordance with the quality inspection plan approved by each unit. Each subdivisional work must be closed one by one according to the inspection grade and control point requirements determined by the quality inspection plan. Before the acceptance of the project, organize relevant departments and personnel in the project to conduct pre-acceptance, list the problems detected, determine the necessary responsibilities, personnel, measures and rectification time one by one, and track and check the rectification results. Through the above measures in construction and self-inspection measures before completion acceptance, the project can pass the completion acceptance smoothly.
In the past year, through the joint efforts of all members of the project department, the project department successfully passed various inspections and reviews, and the quality work was well received by the owners, supervisors and interested parties. We believe that as long as the quality managers at all levels in the project department, Qi Xin and Qi Xin, work together with one heart and one mind, will be able to complete all the quality work in the project, continuously improve the quality management level, and successfully complete the project construction tasks and quality objectives.
Quality engineering summary report 5
The year's work is coming to an end. In the overall construction of this year's project, I deeply realized the importance of teamwork, some of my own shortcomings, team harmony and so on are the key factors affecting the smooth progress of the project. To this end, this year's project quality work is summarized as follows:
I. Time limit for a project
In the early stage of project construction, with the joint efforts of the whole company, the overall operation was good, and the project showed a good trend in terms of safety, quality and progress, but raw material processing was an important link. Therefore, in the process of materials entering the site, the audit and acceptance of materials are related to the safety and progress of the project.
In foundation construction, weather and other irresistible factors are the biggest stumbling block that affects the smooth completion of the whole project. Therefore, the site management personnel should make corresponding adjustments according to the actual situation, Party A, weather and other factors, reasonably arrange the construction progress, and formulate practical and effective measures to catch up with the progress. Here, I also deeply realize my own shortcomings. In the face of rainy weather, I can't reasonably arrange workers to prepare for the later project progress, which leads to a corresponding extension of the construction period when conditions permit. When the progress of the project is accelerated, it is also my own management experience to rush to meet the construction period, which can not be completely reasonable and effective, so there are many places to learn in the future work.
Second, the engineering construction safety
On-site construction should truly realize that safe production is the premise and guarantee for enterprises and individuals to cast Zotye fine products. Can understand the social attitude of "people-oriented, safety first" and the importance and necessity of safety facilities investment, safety education and prevention. In the early stage of the project, do a good job in workers' safety education, sign the corresponding labor contract, make safety disclosure, and always keep in mind the safety awareness.
_ _ _ _ As the person in charge of the site, I have an unshirkable responsibility for the fall of workers during the construction of the reserved warehouse project. With the cooperation of Qi Xin, the leader of the company, I took corresponding emergency measures, which won the most precious rescue time for the injured in time and effectively, and provided a strong guarantee for the workers' final health recovery. So I also deeply reflected on myself and remembered my mistakes. In the future construction site safety management, we will always focus on "three treasures, four mouths and five boundaries", civilized construction on site, safety education for workers and investigation of potential safety hazards, and formulate specific safety implementation plans and measures to ensure the smooth progress of the project.
Third, the quality of engineering construction
Summing up a century-long plan, quality-oriented. The _ _ _ project has been completed, but there are still many thorny problems, such as water leakage at the joints of sunshine bricks on the roof panel and water leakage in the walls and windows, which have really affected the production of Party A and caused unnecessary losses to the company. I feel deeply guilty about this and have been working hard to fix it. In my opinion, in the process of engineering construction, we should always supervise its construction procedures to avoid workers' carelessness, sign technical disclosure with the operation team, sign quality agreement when necessary, and formulate corresponding quality inspection cycle, so as to solve the quality defects found in the construction process and make the quality problems truly within the dynamic management of quality inspection. In strict accordance with national norms, standards and household acceptance standards, quality implementation.
Fourth, cost control and project advance payment
At the initial stage of construction, a detailed construction budget and material consumption plan were prepared, and gradually improved according to the changes of site conditions, design changes, negotiations and other factors during construction. Each construction team picks up materials according to the task list, and the materials entering and leaving the warehouse are recorded in detail. Under the condition of ensuring the normal supply of materials, eliminate waste. Adopt new technology to reduce labor consumption, improve efficiency and increase benefits.
Advance payment clause in the construction contract signed with _ _ _ _ _ _ _ _ _ _ _ _ We have never defaulted on the labor contract signed with each ZuoYeDui, and occasionally we will postpone it. We also try our best to do a good job of appeasement at the scene to ensure that migrant workers can finally work safely and go home happily.
Looking back on this year's work, there are both growth and shortcomings. Clearly analyzing the shortcomings and advantages of one's own work, understanding the gap, accepting experience and drawing lessons, making full use of strengths and avoiding weaknesses in future work, and improving and improving construction methods are valuable assets for future work. In the future, I will gradually improve my point of view and consciousness, constantly improve my professional quality and level, strengthen my sense of responsibility, cultivate the spirit of love and dedication, be people-oriented, strengthen management and enhance the spirit of teamwork.
Quality engineering work summary report related articles:
★ There are five model essays on the work summary report of the Quality Department.
★ 20 16 model essay on work summary of quality engineer
★ Five selected year-end summary reports of the Quality Department.
★ Summary report of personal work of quality supervisor
★ Model essay on annual work summary of Quality Department in 2020
★ 5 selected articles of the annual work summary of the quality department of the company in 2020.
★ Five selected quality supervisors' annual work summaries.
★ Summary of quality inspector's engineering work, five short articles, 2020
Taken the quality supervisor half a year's work summary report
Taken the project quality management work summary report
Where is the new university town in Ningxiang?
Xiangshan University Town, Ningxiang County is located in Jidong New Town, Ningxiang County, Changsha City