40 diaries of on-site security personnel
On-site safety diary:

Before the second phase (xx building) project of xx family started, the project department made up its mind to build this project.

As a "provincial civilized construction site", the company leaders and the project department attach great importance to the safety production of this project.

The company gave a powerful

Support, the project department set up a leading group to strive for "civilized construction site" and fill in the provincial "civilized construction site" declaration form before starting construction.

Put the safety production policy of "safety first, prevention first" in the first place, and our goal is to create high-quality projects and "provincial civilized workers"

Land ",the tree enterprise is brilliant.

Put the goal of striving for a provincial "civilized construction site" in the safety management of the whole construction process and implement it as a whole.

Members' thoughts and conscious actions. During the construction of this project, the project department strengthened the management of safe production and civilized construction, and implemented it.

Standardization and standardized management. Before the project starts, according to the actual situation of the project, carefully prepare the construction organization design scheme and safety special facilities.

Work plan.

(construction electricity scheme, tower crane disassembly scheme, scaffolding disassembly scheme, formwork engineering scheme) effectively guide the construction site.

Safety construction and safety management data shall be filed in a timely and orderly manner. Some achievements have been made. The specific measures of our project department are:

First, strengthen leadership, establish and create a provincial "civilized construction site"

At the beginning of the leading group project, we set up a leading group with the project manager as the leader and the functional managers as members. Re-creation

Under the unified leadership of the construction team, clear responsibilities, make plans, be responsible for each piece, implement measures, carefully organize their implementation, and conduct regular assessment.

Second, the implementation of the responsibility system for production safety

In order to fully implement the responsibility system for production safety, the company and the project department, the project department and the construction team signed the responsibility book for target management of production safety.

In fact, the construction team signed a safety production responsibility letter with the employees. Finally, the project department worked out a site plan to create a provincial "civilized construction site".

Management regulations require strict implementation in place.

Three, the full implementation of safety education and partial safety technical disclosure, strengthen on-site safety management.

All construction workers who entered the site received three-level safety education, conducted safety examination papers for different types of work, and passed the examination.

, fill in the three-level safety education card, sign the responsibility book for production safety, and issue the post card before entering the construction site.

The project department often organizes all employees to learn the safety operation procedures of each type of work and the "Safety Common Sense Reader for Construction Workers".

In the construction of partial projects, we all carefully carry out pre-construction safety for bricklayers, carpenters, steel reinforcement workers and special operators.

Comprehensive technical disclosure.

The project department will hold a special safety meeting for all staff of the project once a month; Use the amateur school for migrant workers to conduct skills training and legal system every week.

Education. And for typical accident cases, illegal operation, illegal command, violation of labor discipline, uncivilized construction on site.

Education.

For each type of work operation procedures, safety knowledge reader, "Building Law", "Safety Production Law" and "Yangzhou Construction Industry xx Year"

Safety work opinions ",the municipal construction bureau documents, to learn, and strive to continuously improve the safety quality of all employees.

Pay special attention to the pre-job safety activities of the construction team. Safety officers and foremen often go deep into the team to attend the pre-work meeting to comment on the safety construction and safety.

Pay full attention to some disclosures.

Strict reward and punishment system, severely punish violations of discipline. Post safety banners, safety slogans and safety wall charts on site, and make various safety signs to create a safe atmosphere.

Fourth, we are willing to invest in safety to ensure that all kinds of safety protection facilities are in place in time.

1, construction electricity shall be strictly implemented in accordance with regulations, and three-phase five-wire system shall be adopted, and lighting and power shall be separated, from the power distribution room to the on-site electrical box.

Code for laying lines. Mid-range electrical boxes are grounded and equipped with contact protectors that meet the requirements. The fuse of the knife is equipped reasonably, and one is implemented.

One machine, one box, one brake, one leakage protection and one lock realize three-level distribution and two-level protection, and use electricity safely.

2, tower crane and other large mechanical equipment and small machinery, safety insurance device is complete and effective, all kinds of large mechanical equipment shall be the responsibility of the professional company.

Small and medium-sized machinery is also installed by professionals. After inspection and acceptance meet the requirements, put into use, hold relevant certificates, and operate by special personnel.

Operators should check and maintain all kinds of machinery and equipment, deal with problems in time, and ensure the normal operation of machinery.

3. Scaffolding shall be constructed in strict accordance with the design scheme and relevant national codes.

According to the characteristics of this project, double-row steel pipe fastener scaffold is used below the sixth floor, and cantilever scaffold is used above the sixth floor, with scaffold geometric ruler.

Inch: frame width 1.05m (horizontal distance), step distance 1.8m, vertical distance of vertical pole 1.5m, scaffolding and wall shall be kept 20cm, and isolation protection shall be taken.

Hanging a dense mesh safety net on the outside.

The construction layer is covered with bamboo sheets, which keeps rising synchronously with the construction operation layer and keeps one step ahead of the construction layer.

Hand, make the measures to prevent falling in place.

4, the mouth of the cave limb protection measures in place in time, around each floor in a timely manner with dense mesh safety net for protection, stairs, reserved holes.

Standardized protection shall be carried out around the mouth, pipeline wellhead and bottom floor, and a double-layer protective shed shall be set at the entrance of the passage. All the railings are red and white.

A clear sign of two colors.

5, fire fighting equipment is sufficient, reasonable configuration, in the transformer room, wood yard, stairs, warehouses and explosive flammable places.

Don't equip yourself with fire fighting equipment.

6, strict "three treasures and one device" procurement system, no fake and shoddy products on site.

7. The site materials shall be placed according to the site layout, stacked in an orderly manner, marked, and the site shall be clean and civilized.

8, complete the work and living facilities, the project department from the date of construction site planning, surrounding Dang Wei, party micro design,

Names of supervisor and contractor.

There are obvious corporate signs on the gate, and there are people who are managed by the doorman.

Personnel entering the construction site must wear safety helmet and badge correctly. General situation of the project, site layout of safety warning signs and safety publicity.

Slogans and so on.

Five, to carry out safety inspection, control the hidden dangers of accidents.

The safety section of the company and the leading group for creating excellence shall conduct regular and irregular inspections every month according to the construction safety inspection standards of the Ministry of Construction.

(JGJ59-99) Check the safety production and civilized construction on the construction site, find problems, implement the "three-fixed" measures, and organize personnel in time.

Members carry out rectification.

Investigate and deal with the phenomenon of "three violations", nip the signs of accidents in the bud and ensure construction safety.

Through the effective implementation of the above measures, it is believed that this project has the ability to become a provincial "civilized construction site".

The above are the management practices of safe production and civilized construction of the project department in this project, and the shortcomings, please learn from them.

I believe that under the inspection and guidance of leaders, experts and guests, our work will be done well.

Do better, and our goal will be achieved.

Extended data:

If the site safety officer has a clear responsibility:

I am a security officer, so I want everyone to pay attention to safety, correctly abide by rules and laws, and strictly abide by operating procedures.

Chapter, observe the safety production law! I clearly understand that breaking the rules means going to an accident, hurting yourself, hurting others, and even dying.

Death. If you are familiar with the importance of breaking the rules, you won't have any luck.

I am also deeply aware that it may be an inadvertent violation.

Chapter, causing great harm or loss, becomes illegal. I will deeply feel the importance of safety. Enterprises will fail if they succeed in safety.

Therefore. Any accident is an irreparable loss to the enterprise and causes irreparable pain to the family and individuals, so

From now on, I must earnestly perform my duties.

I clearly understand that breaking the rules means having an accident, hurting others or even dying.

Death. As a day's safety supervisor, let the safety thought firmly take root in everyone's heart and let everyone know that if the sense of responsibility is not in place.

It will cause an accident.

Let us correctly realize that safety is not a problem of one person, but that you have me and I have you. This is an up-and-down relationship.

The chain of mutual insurance is an intricate and closely connected network. I want everyone to be a security officer, and I will advocate the unit.

The system of "sharing, co-insurance and mutual insurance" has been truly implemented. I will never engage in formal security and pursue the truth in content.

excellent

There are many hidden dangers and dead ends in post safety, and habitual violations are common, which restricts the safety production management level of the first line of oil production. If it's just a shape

Formally speaking, security is to be dealt with, so even if you invest more and pay more, there can be no substantial improvement in the security environment.

Security governance

The level can never be improved in essence! Only when each employee supervises, reminds and checks each other in their daily work can they find loopholes.

Loopholes and weak links to prevent unsafe factors; Du pieced together all the hidden dangers of accidents from small things.

Climb up the safety embankment.