Current location - Education and Training Encyclopedia - Educational Knowledge - Model essay on project engineer's annual work summary (selected 10)
Model essay on project engineer's annual work summary (selected 10)
Time flies. After a year's work, I have a lot of new insights and understandings about my work. Writing the annual work report of the post is a satisfactory work answer sheet for the past year, and you can see your growth by writing a work summary. What aspects should be focused on in the annual summary of posts? Worrying about you, I collected and wrote a model essay on the annual work summary of project engineers (selected 10) for my friends. Welcome to read, I hope it will help you.

The project engineer's annual work summary is like a flying sun, and time flies like a meteor. I have been engaged in design work in the design institute for more than a year. In this more than a year's work, I realized the freshness of just stepping on the job; I feel the hard work and fatigue of the designer. In the first half of the year, I tried to adapt myself to the new working environment; The focus of the second half of the year is to cultivate their good study habits and earnest and down-to-earth learning attitude, and make unremitting efforts for the initial employment of assistant engineers.

As a "double new" designer, she just joined the work, which coincides with the recent reform of the college. She just left school and entered the design institute. Although the environment has changed a lot, she still focuses on learning. In this short year, I am both excited and excited. With the enthusiastic support and help of leaders and bosses, I have done a good job in design and actively completed various tasks assigned by the institute. I have many thoughts and feelings about my business and design work. Now I will give a brief report on my work in the past year:

First, political and ideological aspects.

In this year's design work, I deeply realized that the engineer's work is trivial and heavy, and every link from design scheme to completion acceptance can't be slack. In the design process, I keep learning and reflecting, making progress in learning and growing up in reflection, so that I can become an excellent engineer one day in the future. Clear design purpose, correct attitude, study business and work hard. Love your career, unite with colleagues, ask for advice modestly, and abide by labor discipline. Participated in xxx donation activities, which enhanced the collectivism spirit of the staff in the hospital. Strengthen the cultivation and improvement of one's own quality, and start from oneself. The particularity of the engineer's profession determines the inevitability of people-oriented and safety first.

Second, business ability.

Between work, through heart-to-heart talk and communication with several old engineers, we have a preliminary understanding of architectural design and structural design in a relatively short period of time. Secondly, under the leadership of the boss, we learned the new version of the code in 20xx, and gave us guidance on design methods and psychological counseling on safety awareness. We also conducted psychological counseling on some newly graduated students' inferiority, anxiety and disappointment caused by only designing annex buildings, which stimulated our self-confidence and cultivated our enthusiasm for design.

What impressed me deeply was that the director inspired me to be the owner of my own house, and gradually cultivated my ability to take charge of the project boldly, so that our newly graduated students enhanced their sense of responsibility, actively participated in management, formed a United, willing and responsible design team, and promoted the common progress of the members of the hospital. In addition, the director also taught us that in the process of negotiation with Party A, we should "keep our word", put people first and put honesty first.

Under the tide of new code reform in 20xx, all engineers and I joined the wave of learning new code. Since the implementation of the new standard, the bosses have actively cultivated our independent learning ability and scientific inquiry spirit in the process of drawing review. They don't force design specifications on us, but let us explore, ask questions, analyze problems, find problems, solve problems, draw conclusions, verify conclusions and apply them to solve problems. Paying attention to process training and summarizing the key points of drawing examination have improved our interest in learning and cultivated our creative spirit. Carefully designed and humbly asked for advice. As a young designer, in order to improve my design level, I always look at the standard atlas of architecture and often find some excellent architectural design drawings from the Internet to study hard. At ordinary times, consult experienced bosses earnestly and humbly, learn from their experience and serious and responsible attitude towards the project, constantly improve their design level and understand the design art among them. Mr. Lu Xun once said, "There are a thousand Hamlets among a thousand readers." I want to say that a thousand designers will have a thousand design styles, and each style has its own unique and charming flash side, and I hope I am a hard-working bee, able to learn from others and try to design excellent works!

Third, performance.

Works of xXX Architectural Design Institute in XX City:

XX city inspection institute facade renovation scheme, xx road and xx road facade renovation scheme, xx city office building scheme, xx city armed police detachment second squadron facade renovation scheme, xxX scheme, xx city hospital medical office building structure, xx city xxx building structure, xx city xxx company office building, xx city XX company transformer room building structure, Xx Highway Hotel Elevator Reconstruction Building Structure, xx Scheme, xx Garage Building, xx Scheme, xx Funeral Home Gate Arch Building Structure, xx Building, XX Village Relocation Residential Area Private Saving Scheme, xxx Scheme. ...

Works of the Second Architectural Design Institute of xx City:

Xx management Committee guangde temple two bridges (vehicle bridge and pedestrian bridge) building structure, xx children's welfare home planning scheme (revised part), xx first people's hospital old inpatient surgery building reconstruction scheme (structural reinforcement construction drawing, water pump room building structure), xx industrial park building construction drawing (cleaning and polishing workshop, material warehouse, finished product warehouse, casting workshop) and gate fence affiliated building structure, xxx residential district planning scheme, Office building scheme of xxx Electric Group Co., Ltd. (revised part), structural construction drawing of xxx welfare home (xx building, office building, teaching building, baby dormitory, children's dormitory), staff building structure of xx Light Industry Association, building structure of xx comprehensive building, building scheme of commercial and residential building of Xinjie in xx city, building structure of xxX hotel gate of xx College, building scheme of xxx in xx city and building scheme of XX company. ...

Over the past year, under the careful care and guidance of leaders and colleagues, through my own study and study, I have compared the theoretical knowledge learned from books with the actual work, deepened my understanding of the actual work with theoretical knowledge, verified the theoretical knowledge learned with practice, and strived to quickly accumulate design experience, so that I can integrate myself into the work faster and better.

Fourth, the direction of future efforts.

① Improve your design level, listen more, think more, do more, communicate more, make persistent efforts and work hard.

(2) Always learn from old engineers, you can learn more knowledge from masters, and you can be independent;

(3) Always look at the standard atlas and constantly enrich your experience and skills in practice.

④ Improve your design quality and professional ethics.

⑤ Actively prepare for the exam: registered structural engineer, two construction division, first-class constructor, registered cost engineer and registered supervision engineer, focusing on the first three items.

In the future, I will further strengthen technical study, work hard, give full play to my personal advantages and make more contributions to the hospital. Design experience is accumulated bit by bit. A little progress every day is a process of continuous progress. There is no best, only better. Haste makes waste, and we must improve step by step.

Design work is an ever-changing and never-ending work. A flower in spring, a fruit in autumn, let me turn my desire for design into a fire for architecture and dedicate my most precious love to architectural structure design. I believe that the flower buds in my heart today will bloom beautifully tomorrow.

This year, it was a whole year in which I grew up rapidly with sweat. But this is just the beginning. "The road is long, and I will go up and down." .

Project engineer's annual work summary. This year's main work and completion

According to the company's work arrangement, this year I mainly completed the supervision of the delivery of Longkaikou Power Station, the expansion of Baoan converter station, the expansion of substation and the deicing of ground wire of converter station. Under the correct leadership of leaders at all levels of the company and with the active cooperation of all departments, I led my team to complete this year's supervision task safely, with high quality and high efficiency, and the achievements were unanimously affirmed by the construction unit and the company leaders.

Second, the highlights and shortcomings in the work

The experience summarized in the work mainly includes the following leaders' reports: First, based on design documents, national electric power construction regulations, construction contracts and supervision contracts, do a good job of two management, four control and one coordination. The second is to learn from experienced colleagues, study hard, think hard and work hard. Third, unite your own team and build a harmonious team. Fourth, boldly explore new technologies and new processes and optimize the construction scheme. Fifth, strengthen the rules and regulations of China Southern Power Grid and the company, actively promote and apply the requirements of integrated management of infrastructure projects, and carry out quality control according to the established WHS points. Seventh, standardize the supervision diary of our team and strengthen the management of engineering image data.

Among them, I think it is most important to unite our own team and build a harmonious team. As the saying goes, everyone paddles to open a big boat, and one fence has three piles, showing the strength of the team. The experience and practice in the past few years have proved that only by relying on the collective wisdom can we overcome all difficulties and show the company's image to the outside world until we finally win. The role of internet information technology in engineering. Sixth, positive consistency.

Third, the problems encountered in the work and the handling situation

At work, I often encounter some problems and troubles, but I never avoid them. First of all, I want to think calmly and understand the ideas and methods to solve the problem. I should give full play to the wisdom of the masses for difficult problems. Brainstorm and learn from others. For some problems that really can't be solved within their own ability and authority, report to the relevant leaders for instructions in time to avoid the expansion of difficulties and contradictions and strive for time to solve the problems. So over the past year, the team I led has been able to successfully complete the tasks assigned by the company. Thank you again for your concern and support. Without your care and support, it is hard to imagine.

Four. Opinions and suggestions on the company

I hope our company is as full of vigor and vitality as the rising sun in the morning. Of course, I also hope that our life is full of sunshine. In view of this, I suggest that the company: First, actively expand its business, increase revenue and reduce expenditure, improve work efficiency and optimize the human resource structure. Two, increase the cost of staff education, cultivate a group of high-quality supervision talents, and adopt some incentive policies to encourage the advanced and spur the backward. Create a positive learning atmosphere. Third, wage reform should be carried out to improve the treatment of outstanding employees with good performance, good dedication and dedication.

Personal Work Summary of Construction and Installation Engineer Annual Work Summary of Supervision Engineer Responsibility Letter of Chief Supervision Engineer of Supervision Unit

Project Engineer's Annual Work Summary Fan Wensan Dear Company Leaders:

Hello!

My name is xx. 20xx joined xx Engineering Management Consulting Co., Ltd. as a consulting engineer on June 2/KLOC-0. In the past three months, I have actively studied the company culture and system, quickly integrated into the company collective and departmental groups, and cooperated with department managers and other colleagues to complete various tasks. Now I will report to the leader the summary, prospect and planning of my work achievements in the past three months.

I. Summary of work achievements

Since I entered the company for three months, I have received seven projects, including six re-examination projects and the re-examination project 1.

The review items are xx respectively.

Second, the work plan

1. Complete the unfinished projects before, and actively improve and improve the work efficiency according to the problems existing in the previous projects;

2. Accomplish more achievements and coordinate and communicate with various projects.

Third, the work prospects

To become an excellent cost practitioner as the goal.

1, actively learning relevant professional knowledge and having excellent professional quality;

2. Strive for the first-class cost engineer;

3. Excellent team spirit and communication and coordination skills;

4. Actively study the company system and culture, and have a strong sense of responsibility and mission.

The above is my work summary and career path planning.

Please criticize and guide the leaders.

The fourth measurement of the project engineer's annual work summary model is the eye of the project. As surveyors, we are engaged in surveying work based on the principle of seeking truth from facts, and everything is based on data. In the investigation of xxxx Sisi Expressway, some experiences and lessons are summarized in order to better carry out the work in the coming year.

Before the survey, we should be familiar with the drawings, formulate the survey plan, and formulate a set of survey procedures for specific structures and road routes to facilitate the survey work.

Main contents of full-line survey work

1, the traverse leveling points of the whole line are regularly surveyed and encrypted, and the traverse points of adjacent blocks are jointly measured.

2. Subgrade: excavation (no fill in this project) mainly monitors the width of excavation opening line, the width and elevation of excavation slope and excavation platform, and the position, width and elevation of middle pile after subgrade forming.

3. Bridge: Bridge pile foundation mainly includes center position, pile foundation bottom elevation, aperture inspection during construction and elevation control of pouring surface; Abutment, abutment, bearing platform, tie beam and thin-walled pier are mainly used for measuring lofting and rechecking before formwork erection, lofting and rechecking of various embedded parts, formwork bottom elevation and formwork geometric dimensions, elevation control of concrete top pouring surface, axis deviation detection after molding, etc. Axis of tie beam, bottom elevation of formwork, geometric dimension of formwork, elevation control of pouring top, axis deviation detection after molding, etc. Column: it is mainly used for setting out and rechecking the center point, controlling the elevation before formwork erection, the verticality of column formwork, the elevation of concrete pouring surface, and measuring the center deviation after molding. The capping beam mainly includes the geometric dimensions of the formwork, the elevation of the bottom plate, the elevation and transverse slope of the pouring surface, the position of embedded steel bars and the measurement of axis deviation after molding. Setting out and rechecking the axis of bearing cushion stone, controlling the elevation of pouring top surface, and checking the geometric size and direction of formwork, etc.

4. Communicate and coordinate with the monitoring unit in time, master the deformation of subgrade, tunnel and later hanging blue bridge pieces, listen to the guidance and suggestions of the monitoring unit, handle problems in time when found, and provide accurate construction basis for on-site construction.

Handover of traverse points and leveling points

Construction lofting shall be carried out according to the design drawings after the construction contract comes into effect. Before construction lofting, surveyors should be fully familiar with design documents and supervision regulations, and accept conductor piles, leveling points, coordinate data of design institute pile by pile and other piles handed over by supervision engineers or design units. Under the auspices of the supervision engineer, the design unit shall deliver the pile directly to the contractor on site according to the drawings. If more than two control piles are found to be lost or damaged, the design unit shall be required to make up for it. After receiving the pile bitmap, coordinates, elevation and other information sent by the design unit and handing in the pile on site, the contractor shall conduct self-inspection within the specified time limit (usually 14 days), and shall conduct on-site supervision during the inspection. If there is no error and the accuracy meets the design and construction requirements, it should be formally accepted in written form and be responsible for future maintenance and use. If the contractor disagrees with any survey marks and data, the supervision engineer shall submit a form listing the positions of pile points and correction data that are considered to be wrong. The re-inspection test results of the contractor shall be reported to the supervision engineer for review, and can only be used as control points after being confirmed by the supervision engineer.

Pile delivery is a very important job, and any mistakes that may affect the project should be avoided in the process of pile delivery. The surveyors shall re-survey the new pile point in time, and conduct two-point joint survey with the adjacent blocks by using the attached traverse method to see whether it meets the relevant technical requirements of the secondary traverse. Traverse points often can't meet the survey requirements, and are far from the road center line, and there are many obstacles, so support points must be added. When selecting points, follow the following principles:

Traverse points should be selected in places with high terrain and wide vision, which is convenient for surveying the surrounding terrain. Intervisibility between adjacent points is convenient for measurement.

The traverse points shall be set on the flat, solid and undamaged ground. It is convenient to set up the instrument. The side lengths of wires should be roughly equal, and the adjacent side lengths should not be too different.

Traverse point measurement

After the new point is selected, mark it on the ground. For traverse points that need to be preserved for a long time, they should be buried in stone piles or concrete piles and marked with crosses. The angular distance and height difference of this point can be measured by two known points and closed with another traverse point. Calculate the adjustment by measuring the mirror surface, then determine the coordinates of the point and record the results. Ensure the correctness of the data of control piles and control points handed over. Encryption of control nodes

The traverse points and leveling points submitted by the design unit were established in the design stage to meet the design requirements, which can not fully meet the needs of construction site survey and template application, and some pile points will be covered, destroyed and disappeared during the construction process. Therefore, before the start of construction, surveyors should encrypt and control the network points to ensure that all parts of the route and structure can be accurately located, and after individual pile positions are lost in the construction process, the pile positions can be restored with sufficient accuracy. After the surveyors formally accept the pile positions of traverse points and leveling points, they should immediately encrypt the construction survey control points according to the site conditions and the requirements of construction technical specifications. Burying piles, surveying, network construction and calculation of encryption control points are all independently completed by surveyors. The personnel who finish this work should have qualified qualifications and work experience, and the instruments used must be inspected and calibrated to meet the accuracy requirements. Make a security plan for encryption control network layout. After completing the work of encryption control network, surveyors shall submit reports and calculation data to the supervision engineer in written form. The supervision engineer shall recheck the test results and confirm that they are accurate and meet the requirements before using them.

Construction lofting audit

Surveyors should correctly locate the position and elevation of highway lines and ground structures according to the design requirements. In order to prevent errors in construction lofting measurement and bring losses to the project, the construction lofting of specific sub-projects can only be started after the construction surveying control network is perfected and approved by the supervision engineer. Before survey lofting begins, surveyors should submit survey lofting plan, and supervisors should stand by and watch the survey lofting process to ensure that the construction lofting method and measurement readings are correct. Before the start of construction, the inspection report and original records of lofting measurement shall be submitted to the supervision engineer for review and signature. First, the survey plan shall be prepared, and it shall be implemented according to the approved plan during the construction survey. Self-inspection and mutual inspection shall be carried out first, and then our supervisor shall review it after it is qualified.

In the new year, with the support of the owner and the cooperation of the construction unit, we will redouble our efforts to do a good job in supervision service. We are confident to successfully complete the task of survey supervision and make due contributions to the construction of Sisi Expressway.

Project Engineer's Annual Work Summary Fan Wen 5 During my years of on-site practice in construction technology, I have made great progress in politics, ideology and business level, improved my technology, and ensured the quality of the project I undertook. I have been learning and improving step by step. The relevant situation is summarized as follows:

First, rich professional knowledge is the premise of engaging in professional and technical work.

Since joining the work, the work has been guided and cared by the bureau leaders, and has been engaged in professional work related to highway survey, highway design and budget. After several years of work practice and study, I have accumulated some professional theoretical knowledge. I have been engaged in on-site construction projects of highway bridges and highway tunnels:

1, 20xx.5-20xx.7 Haitao Railway is divided into Lingshan Expressway, with a total length of 4560m and a bridge162.38m. The total project cost is 1257 10000 yuan. As a technician, I am engaged in construction management. The project was successfully completed on schedule, and passed the completion acceptance, and the project quality was qualified.

2. Bid A of Sanchahu Tourist Expressway in jianyang city, Sichuan Province, 20xx. 12-20xx. 10, tunnel: 436m left and right line of Gaoshi ladder, 4770m left and right line of single crystal, subgrade excavation 1.37 million cubic meters, filling of 930,000 cubic meters, bridge of 3024m, culvert. The project was successfully completed on schedule and passed the completion acceptance, and the project quality was qualified;

3.20xx. 10- Up to now, the inclined shaft of Tongluoshan in the second phase of Chongqing Metro Line 6 is 367.66m, and the left and right lines of the interval tunnel are 2634.3m, with a cost of 72.257 million yuan. As a technician, I am responsible for the management of site construction under the guidance of engineers, and supervise the site progress and quality completion. The project is currently under normal construction. Plans have been made to rationally arrange various processes and production factors. Do a good job in manpower, materials, equipment, technical preparation, peripheral relations and so on required for subsequent projects in advance. Ensure that when the follow-up work is implemented, there is no hurry, no shortage of east and west, and the construction period will not be affected. At work, personal work attitude is also very important, and the tasks assigned by the leaders must be completed as required, and cannot be delayed or perfunctory. Special circumstances can not be completed on time, should be reported in a timely manner. Convenient to solve the problem as soon as possible. The work of technicians is also hard. During the day, they have to climb up and down the construction site to guide the construction, and at night, they have to sort out the inner pages of the day and arrange the work for the next day. This requires a hard-working spirit, and the work of the day is completed on the same day, and it will never be put off until the next day. Technicians work in the construction line and are responsible for the quality, safety and progress in the construction process. Timely report the problems that need to be solved and improved in the construction, and put forward solutions to the leaders. In the work, we should deal with the relationship with the construction personnel and the supervision owner, and everything is based on ensuring the progress, quality and safety. All kinds of internal page data and quantity confirmation data formed in the construction process shall be signed by the supervision engineer in time, so as not to affect the later measurement.

Two, strict standards, strict requirements, and strive to make professional and technical work to a new level.

Since I became a technician, I have been strict with myself, applying theoretical knowledge to highway construction, and achieved some practice. Construction shall be carried out in strict accordance with the technical standards of highway engineering and the inspection and evaluation standards of engineering quality. As a qualified technical director, I have strict requirements on engineering quality, be a good assistant to the leader, dare to innovate and explore in technology, and sum up practical experience. During my years in office, I have performed my duties as a technician well. In recent years, I have done a lot of work for the society and the highway industry. In order to adapt professional technical level and professional technical working ability to highway development, it is necessary to continue to learn professional technical knowledge, constantly sum up experience, constantly enrich their professional theoretical level and actual construction ability, push professional technical posts to a new level, and do their duty for highway construction and development. Take the most timely and effective measures to deal with safety accidents. And do a good job of finding reasons, tracing responsibilities and summing up lessons afterwards, and educate employees to improve safety awareness with examples.

In the discussion of construction technology, we earnestly and assiduously explored the NATM, and achieved good results in tackling key technical problems, providing a lot of valuable experience that can't be found in books, providing beneficial construction experience for the Canning Tunnel of Luo Chang Expressway and the Watershed Tunnel of Haishu Railway, creating technical conditions for the smooth penetration of tunnels with the most complicated geological conditions, and winning a good reputation for the company.

In many years of construction management, I have summed up some experience in project management and rich experience in construction management, financial management and material logistics support management, and become a qualified management leader and technical backbone.

According to the requirements of NATM tunnel excavation and smooth blasting, the drilling and blasting are designed by professional technicians, and the construction personnel are instructed to excavate according to the design eye position on site to ensure the measurement quality. In strict accordance with the requirements of construction specifications, each construction procedure is strictly controlled and handled, so that the project after put into production has no worries and creates a high-quality project. The profound experience summed up from practice is that "today's quality is tomorrow's market". In the process of construction, I take the goal of high-quality model project as the starting point, establish and improve the quality management network, and check all the good drawings. The construction technology is well controlled, the reasonable construction progress is arranged according to the schedule, and all projects are completed at high speed and with good quality, without major safety accidents.

Third, improve technology in construction practice.

I have been working for more than 20 years, and I have constantly improved my technical level and construction technical management ability in practice, so that I can learn new technologies and new processes that are not available in textbooks, improve my ability to undertake, organize and coordinate the construction production and technical management of tunnel and subgrade projects, be familiar with design drawings, organize construction according to design drawings and relevant regulations, norms, procedures and construction organization, and solve technical problems; Be able to prepare construction organization and construction plan, and handle and plan major landslides. More importantly, how to control the procedure and management of the project from the quality and safety, so that the post-production project can have long-term quality assurance. Finally, the review of construction achievements In the process of construction for many years, I have always taken one goal as the principle, focusing on quality, safety, progress and engineering benefits to ensure the quality of the project. In highway tunnel engineering, due to the remote geographical location and harsh environment, there are always some common construction problems, such as weak surrounding rock in the tunnel, complex terrain changes and more broken, resulting in large-scale roof caving and collapse, which has a great impact on construction. After our team fought day and night, we carried out strict and scientific rescue according to the plan provided by our team to deal with the landslide, and successfully completed the task, which was rewarded by the construction department. The final acceptance of the project was rated as excellent. This shows that in the construction, not only quantity is "dry", but also scientific knowledge, theory and rich practical experience can make the project.

The project engineer's annual work summary is an evaluation of the civil engineer's work. From the summary of the report, we can see the working status and performance of civil engineers during this period. The following is a model essay on the annual work summary of civil engineering project engineers, from which we can learn a lot. We can also learn from his work and work out a set of ways and means suitable for our own work. Only in this way can we better improve our working ability.

My model essay on the annual work summary of civil engineering project engineers is like this. Whether as an ordinary engineering technician or as the technical director of a project, I think to do a good job in a project, we should not only strictly abide by the national construction norms and regulations, but also integrate theory with practice, study and apply flexibly, constantly sum up construction and management experience, and constantly improve and innovate in technology.

I came into contact with many chimneys in my work and realized that only by constantly innovating technology and constantly updating equipment can we create greater economic and social benefits.