This involves PDCA cycle. Since training needs follow-up, summary, feedback and improvement, it can be effective. In this case, you should set up an inspection team, then set up an inspection and evaluation form and report the inspection results. It is best to have relevant systems such as safety inspection, education, rewards and punishments. This will be very effective. There are many forms. Because I can't upload it here, I can only give you some reference. You can improve them according to the actual situation and your usual knowledge.

"4. 16" Safety and Site Management Inspection Report

1. inspection time: 201/April/afternoon of kloc-0/6/5: 00-16: 00.

Two. Inspection location: workshop and warehouse of the company.

Three. Inspectors: General Manager's Office (Yang Changshui) and Wang Jianfeng, director of non-standard workshop.

Four, check the content:

1. Safety production of equipment in each workshop;

2. Workshop site management;

3. Workshop labor discipline;

4. Workshop fire control facilities.

Problems with verbs (abbreviation of verb);

1, standard door sheet metal workshop:

① 3 sets of engine screws of stamping machine tool are not locked;

② 2 sets of motor impellers of stamping machine tool without protective cover;

(3) The original steel and wooden door workshop is messy;

④ The terminal of stamping machine 1 motor falls off.

2, the ground workshop:

① Too many films are placed in the corner of the furnace chamber (whether recycling can be considered after cleaning), which is a fire hazard;

(2) The problem of furnace chimney wire breakage has not been solved;

③ The sanitation and resettlement of idle areas are relatively poor.

④ The facade to be sprayed is in good condition now, and it is hoped to continue to improve.

3. Non-standard door sheet metal workshop:

(1) The protective cover of the rotating wheel of some equipment is loose (the equipment is old and the screws are not tight);

(2) the runner of a device has no protective cover (unavailable).

4. Assembly workshop:

(1) Poor hygiene and placement;

② The personnel did not smoke in the designated smoking place.

5. Warehouse:

Measures taken by intransitive verbs:

1. Each workshop is required to use the morning meeting to educate employees;

2. Require inspection of unqualified workshops for on-site management and rectification;

3. Please ask Wang Qinghua, the mechanic and electrician of the company, to repair the punch (electrical part) with problems in time;

4. Deduction by the workshop leader of the responsible department: Wang Hongqing's deduction 10 yuan; Lu Jianlin deducted 5 yuan; Zheng detained 5 yuan; Zhu Jiansheng deducted 5 yuan; Zhu Jianwei, Liu Feng and Zheng each detained 2.5 yuan.

Hereby inform you

Comprehensive economic office

09、 1 1、30