The whole construction preparation process of aluminum formwork system is as follows:
Complete the design of architectural drawings and structural drawings → The drawings are reviewed and quoted by aluminum formwork technicians → Discuss the cooperation content and sign it → Technicians design the template assembly drawing (template assembly drawing) → Make it according to the drawing → Factory pre-assembly → Inspection qualified → Factory delivery → On-site construction.
Construction technology of gold standard aluminum formwork;
Wall formwork → beam formwork → stair formwork → formwork acceptance → concrete pouring → quality acceptance → formwork removal (installation before disassembly) → transportation to the next floor for construction.
Aluminum formwork assembly