2 supporting fees are mainly used for the construction and maintenance of municipal public facilities other than construction projects, including urban primary and secondary roads, water supply and drainage, power supply, gas supply, street lamps, public transportation, environmental sanitation and landscaping. They are a supplement to the municipal infrastructure construction fund, and some charging items are merged with various urban construction funds to appropriately reduce the charging standards.
Question 2: When should the supporting fees for real estate enterprise development projects and urban construction occur? 1. Urban infrastructure supporting fee refers to the urban infrastructure construction fee paid in the form of capital construction, renovation, real estate development and sporadic construction according to the newly built or expanded construction area for industrial and civil construction projects within the urban planning area.
Second, the "Administrative Measures on Collection of Urban Infrastructure Supporting Fees" has different legal provisions in different regions, and the payment time is also different to some extent. In most areas, it is required to pay before applying for a construction project planning permit, and in some areas, it is required to pay before applying for a construction project construction permit.
Question 3: Do you need to pay the housing matching fee?
Question 4: What is the matching fee when buying a house? Supporting fees should be legal, generally including: cable TV and broadband access fees; Urban heating and gas access fees; Greening maintenance fee ...
Question 5: Do I have to pay the matching fee for buying a house? At the same time, you have to pay the maintenance fund. The matching fee is paid to the developer when you get the key. Water and electricity have been connected, and cable TV, broadband and gas are all connected by themselves.
Question 6: Do I still need to pay the matching fee to buy a house now? Hello!
Property right fee: it will not exceed that of 50 yuan (there is personal fee: running errands). Decoration deposit: Ann requires that the decoration is not deducted, but it can be refunded (the general construction unit can pay in advance: this can also guarantee your decoration, but the decoration team will not do it because of negotiation skills). You can also pay the property fee of 1 year in advance. After all, it is the management service fee supporting fee: what supporting fee should be explained and analyzed in detail. Door: If you don't write it in the contract, you can only be fooled. When decorating yourself, you should check with the property in advance. If not, don't modify it. If you force it, you will deduct the decoration deposit and change it back within a time limit! ! Be careful whether the maintenance obligation is included in the property fee: yes, for example, changing the light bulb or leaking the faucet or roof at home, you won't need this item at home. Ha ha ha ha property fee 1.2 yuan/square meter: This can be agreed (the financial situation of the property company will be determined after a long stay, generally referring to the charging standards of surrounding buildings) 1.2 yuan is not too high in developed cities. Shenzhen has a property management (good, safe, considerate and harmonious) maintenance fund of 8 yuan, 40 yuan/square meter, which can only be done later (he has to pay 100). Depending on when the 40 yuan is spent there, it can be supervised with the neighborhood Committee.
Thank you, Gsycf. I'm happy to answer your questions!
Question 7: Can the supporting fee for urban infrastructure be exempted? 1. What is the scope of the matching fee?
Matching fee is a special financial fund for the construction of urban infrastructure facilities connected with the urban backbone network outside the red line of project planning. This policy adjustment will increase the scope of supporting fees from 9 items to 15 items, including: roads, water supply, rainwater, sewage, water treatment, sanitation, greening, street lamps, transportation facilities, power trench civil works, heating, fire hydrants and bus shelters; Planned kindergartens and compulsory primary and secondary schools.
Second, what is the charging standard for supporting fees?
The collection standard of supporting fees in our city is 400 yuan/square meter, which is calculated according to the above-ground construction area approved by the construction project planning permit. In the past, the collection standard of supporting fees included underground area. This time, in order to encourage intensive land conservation and support the construction of underground space, all the underground parts of the construction project are free of supporting fees. Jimo city, jiaozhou city, pingdu city, Laixi city within the administrative area of supporting fees collection standards, can be determined by the local * * * within this standard.
The scope of application and charging standard of supporting fees were formulated in 2002. In recent ten years, with the rapid development of economic construction, the improvement of people's living standards and the rise of prices, the scope, standards and costs of supporting construction in actual engineering construction have changed greatly, so this new policy has been adjusted together.
Three, which projects can be reduced or exempted from supporting fees?
There are 8 categories of projects that implement supporting fee reduction and exemption:
(a) shantytown renovation project;
(two) low-cost housing, public rental housing, affordable housing projects;
(3) socialized transformation project of military logistics support;
(4) Industrial plant projects;
(five) all kinds of old-age service institutions;
(6) Public transport infrastructure projects;
(seven) supporting the construction of junior high schools, primary schools and kindergartens;
(eight) other construction projects that comply with laws and regulations and the national and provincial policies for reducing and exempting supporting fees.
Four, which projects to implement financial subsidies?
There are four types of financial subsidies for supporting fees:
(a) private primary and secondary schools, kindergartens and various ordinary high schools, secondary vocational schools and other non-profit educational facilities;
(two) public rain sewage pumping station, treatment station, water supply (reclaimed water) public pressurization station, heat exchange station, garbage disposal station (transfer station), independent public toilets and other urban public facilities;
(three) independent construction or equipped with parking projects;
(4) Non-profit public welfare construction projects such as libraries, museums, welfare homes and hospitals refer to public welfare public service facilities such as neighborhood committees, community service centers (stations), community cultural activity centers (stations), elderly activity centers (stations) and old-age care centers.
According to the amount of supporting fees paid by the construction unit, financial subsidies will be given to the above projects.
5. When will the new policy be implemented?
Question 8: Is the matching fee paid when buying a house reasonable? I haven't even heard that this fee is not included in the house price.
(1) Taxes payable for the sale of commercial housing:
1, deed tax
2. Housing transaction fees
3. Stamp duty on sales contract
4. Public Maintenance Fund
5, housing ownership registration fee
6. Stamp duty on house ownership
7. Warrant fees
Question 9: What civil works are included in the construction supporting fee? Some hydropower projects are assigned by Party A to another construction unit. In the construction project, the civil construction unit of cable well has a dispute with water and electricity. Civil engineers believe that civil engineers have no obligation to leave wells for hydropower. Hydropower believes that cable wells and pipeline wells should be civil works.
Question 3: The general contractor thinks that the hydropower construction unit should pay the general contractor a certain fee in addition to the supporting fees (the reason is that the cable shaft construction is difficult and the formwork consumption is high). And the general contractor is not responsible for the repair work caused by water and electricity.
Question 10: Who collected the supporting fees for urban infrastructure? Functional departments monopolize water supply and drainage, heating, electricity, etc.