In a progressive society, agreements are used more and more frequently, and signing agreements can ensure the happy cooperation between the two sides. Let's refer to how the agreement is written. The following is a sample of waterproof construction agreement (5 selected articles) I collected for you, for reference only. Welcome to reading.

Waterproof construction agreement 1 Owner: Project Department of Yihe New Town Area B of Chengdu xx Construction Co., Ltd.

Contractor: Chengdu xx Waterproof Engineering Co., Ltd.

In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, following the principles of equality, voluntariness, fairness and good faith, and in order to clarify the rights, obligations and responsibilities of both parties, the Contract is signed by both parties through consultation.

I. Overview of the Project

Name:

Location:

Construction content:

Hongyuan or Samsung brand 4mm thick SBS modified asphalt waterproofing membrane, national standard level 1.

Hongyuan or Samsung brand 4mm thick SBS modified asphalt waterproofing membrane, enterprise standard level 2.

Hongyuan or Samsung brand 400g/㎡ polyethylene SBC- 120 waterproofing membrane

contract for labour and materials

Second, the contract unit price:

4mm thick SBS modified asphalt waterproofing membrane, national standard grade I, material unit price: _ _ yuan/㎡;

4mm thick SBS modified asphalt waterproofing membrane, second-class enterprise standard, material unit price: _ _ yuan/㎡;

300g/㎡ polyethylene SBC- 120 waterproofing membrane, unit price of material: _ _ _ Yuan/㎡.

The expenses of other labor and auxiliary materials shall be settled according to the list consumption quota of Sichuan Province in 20xx and relevant supporting documents.

Third, the quality requirements:

Qualified products are tested according to relevant national standards.

The warranty period of this project is five years. During the warranty period, in case of any quality accident, the subcontractor shall provide free warranty. If there is no quality accident due to the subcontractor's construction, the subcontractor will not bear the warranty responsibility, but the subcontractor can assist the general contractor in handling it, and the expenses will be borne by the responsible party.

Four. Payment method:

Pay 60% of the completed project on a monthly basis, and the balance will be paid to 97% of the total project price three months after the project is completed and accepted, and the remaining 3% will be used as warranty money, which will be paid in one lump sum after the warranty period expires (excluding interest).

Verb (abbreviation of verb) liability for breach of contract

If the waterproof materials provided by the contractor do not meet the national specifications and relevant inspection standards, all losses caused thereby shall be borne by the contractor.

Sixth, other things.

1. This contract shall come into effect after being sealed by both parties, and shall become invalid after the construction is completed.

2. This contract is made in quadruplicate, with each party holding two copies.

3. Matters not covered shall be settled by both parties through negotiation.

Employer: Contractor:

Authorized Agent: Authorized Agent:

Date: Date:

Waterproof construction agreement 2 Party A:

Party B:

Both parties have reached the following agreement on the basis of equality and voluntariness:

1. Project location: backyard of Henan Street Unicom.

Second, material name: Panjin Yuxiang waterproofing membrane 4 mm.

3. Project cost: 1, about 1 000m2, RMB _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

2. Other expenses are calculated according to actual costs.

Four. Work of Party A: Party A is responsible for providing temporary space for Party B, cleaning the roof, and supervising and inspecting the project quality.

Verb (abbreviation of verb) Party B's work: organize the construction as required, and complete the construction tasks on time with good quality and quantity.

Payment method of intransitive verbs: When Party B's materials and construction personnel enter the site, Party A pays a down payment of RMB 25,000.00 Yuan only, and finally pays off the entertainment expenses in one lump sum according to the actual area after the acceptance of the project, leaving no quality guarantee.

7. Warranty period: The warranty period is five years (from April 25th, 20xx to April 25th, 20xx).

Eight. Division of responsibilities:

1. During the maintenance period, Party B shall arrive at the site within 48 hours after receiving the notice of Party A's division of responsibilities, and negotiate to solve the maintenance matters. In case of force majeure, man-made damage, grass-roots expansion due to moisture, wall cracking and other issues, Party B will not be responsible. If the material is naturally damaged and the bonding is not firm, Party B will repair it free of charge.

Nine. Matters not covered in this agreement shall be settled by both parties through consultation, and the agreement may be supplemented. This agreement is made in quadruplicate, with each party holding two copies.

Party A: Party B:

Person in charge: person in charge:

Date: Date:

Waterproof construction agreement III Construction unit: _ _ _ _ _ _ Company (hereinafter referred to as Party A)

Contractor: _ _ _ _ _ _ Co., Ltd. (hereinafter referred to as Party B)

After Party A's examination of Party B's construction professional qualification, it is agreed to entrust Party B to undertake the construction of xx waterproof project of our company. In order to clarify the rights, obligations and responsibilities of both parties in the construction process, and in accordance with the principle of ensuring project quality, project progress and project safety, the following contract terms are determined through consultation for common compliance and implementation.

I. General principles

1. Project name: Buildings 2 and 3 of Meilin production and living base of the company.

2. Project location: in the compound of Shanghai Meilin Shenhua Stone Company.

3. Project content: According to the requirements of the company's xx project construction contact list and design change notice, polymer cement-based waterproof coating (1.5 thick) is used for kitchen and bathroom waterproof engineering, and polyurethane "85 1" waterproof coating is used for roof waterproof engineering (leveling layer is used for basic treatment).

Second, the way of contracting:

The general contracting mode of Party B includes contracted projects, materials, quality, management, safety and progress.

Third, the project cost: the polymer waterproof in the kitchen and bathroom is RMB _ _ _ _ _ per square meter; Roof "85 1" polyurethane waterproof per square meter _ _ _ _ _ yuan. According to the actual area of settlement.

Four. Quality standard: Party B shall ensure that the waterproofing works of Building No.2 and Building No.3 of Meilin Life and Production Base of the Company reach excellent standards, strictly refer to the new Guangdong waterproof engineering standard dbj 15- 19-97 and the current relevant standards in Shenzhen and Party A's requirements, and ensure that the coating works are not peeling, hollowing, delaminating, dew-free, flat and uniform, and are consistent with the basic level.

Verb (short for verb) Responsibility of both parties:

1. Party A's responsibilities:

(1) Put forward the construction plan in advance, arrange the working face to meet the waterproof construction standard, and submit it to Party B for construction.

(2) The construction period plan should be put forward, but the construction period should be postponed in consideration of the inevitable factors such as weather and manpower.

(3) Cooperate with Party B in construction, such as providing necessary on-site vertical transportation and workers' accommodation.

(4) Party A has the right to supervise and inspect Party B's engineering quality during the construction process, and has the right to require Party B to make rectification within a time limit when problems are found.

2. Party B's responsibilities:

(1) Party A informs that the waterproof material will enter the site immediately, and submit the waterproof material certificate, test report and license issued by Shenzhen Construction Bureau, which will be used after the on-site person in charge of Party A passes the sampling inspection. If necessary, Party A will select the municipal "Engineering Institute" and use it after it is qualified.

(2) Cooperate with the overall progress of Meilin Living Base of Urban Construction Company, and carry out the construction according to the construction plan put forward by Party A. Except for inevitable factors, there shall be no artificial delay.

(3) Party B shall abide by the rules and regulations of the construction site and shall not violate the rules, otherwise it will be punished by Party A in various forms.

(4) Construction shall be carried out in strict accordance with waterproof engineering standards. If problems are found, solve them in time to ensure the quality of the project to reach excellent standards. The project is guaranteed for three years.

Payment method of intransitive verb: there is no advance payment for the project, and Party A shall pay the progress payment according to Party B's progress. After all the projects have passed the completion acceptance and reached the excellent standard, Party A shall pay _ _ _ _% of the total project payment to Party B, and keep _ _ _ _% of the project payment as warranty money. After the expiration of the three-year warranty period, if Party B has no quality problems, Party A shall pay the balance.

Seven. Others:

This contract is made in duplicate, one for each party, with the same legal effect. After the expiration of the three-year warranty period, this contract will automatically become invalid after Party A pays off the balance. Matters not covered shall be settled by both parties through consultation.

Party A: (signature) Party B: (signature)

Representative: representative:

Waterproof construction agreement 4 Construction unit: _ _ _ _ _ _

(hereinafter referred to as Party A)

Contractor: _ _ _ _ _ _ Co., Ltd.

(hereinafter referred to as Party B)

After Party A's examination of Party B's construction professional qualification, it is agreed to entrust Party B to undertake the construction of xx waterproof project of our company. In order to clarify the rights, obligations and responsibilities of both parties in the construction process, and in accordance with the principle of ensuring project quality, project progress and project safety, the following contract terms are determined through consultation for common compliance and implementation.

I. General principles

1, project name: 2, project location: 3, project content: According to the requirements of the construction contact list and design change notice of Tang De Garden Project (Bid 2) of our company, polymer cement-based waterproof coating film (1.5 thick) is adopted for kitchen and bathroom waterproof engineering, and polyurethane 85 1 waterproof coating film is adopted for roof waterproof engineering (leveling layer is adopted at the grassroots level).

Second, the way of contracting:

The general contracting mode of Party B includes contracted projects, materials, quality, management, safety and progress.

Third, the project cost:

Polymer waterproofing between kitchen and bathroom is RMB _ _ _ _ _ _ per square meter; Roof 85 1 polyurethane waterproofing is RMB _ _ _ _ _ per square meter. According to the actual area of settlement.

Fourth, the quality standard:

Party B shall ensure that the waterproof project of Tang De Garden Project General Contract (Bid Section II) of our company reaches the excellent standard, strictly refer to the new Guangdong waterproof project standard dbj 15- 19-97 and the current relevant standards in Guangzhou and Party A's requirements, and ensure that the film coating project is free from peeling, hollowing, delamination, dew point and flatness, and has certain adhesion with the base to meet the quality requirements such as design thickness.

Verb (short for verb) Responsibility of both parties:

1. Party A's responsibilities:

(1) Put forward the construction plan in advance, arrange the working face to meet the waterproof construction standard, and submit it to Party B for construction.

(2) The construction period plan should be put forward, but the construction period should be postponed in consideration of the inevitable factors such as weather and manpower.

(3) Cooperate with Party B in construction, such as providing necessary on-site vertical transportation and workers' accommodation.

(4) Party A has the right to supervise and inspect the engineering quality of Party B during the construction process, and ask Party B to make rectification within a time limit if problems are found.

2. Party B's responsibilities:

(1) After receiving the notice from Party A, immediately put the waterproof material into the site, and submit the waterproof material certificate, test report and permit issued by Shenzhen Construction Bureau, which will be used after the sampling inspection by the person in charge of Party A's site. If necessary, Party A will pump it to the Municipal Institute of Building Research for use after passing the inspection.

(2) Cooperate with the overall progress of Meilin Living Base of Urban Construction Company, and carry out the construction according to the construction plan put forward by Party A. Except for inevitable factors, there shall be no artificial delay.

(3) Party B shall abide by the rules and regulations of the construction site and shall not violate the rules, otherwise it will be punished by Party A in various forms.

(4) Construction shall be carried out in strict accordance with waterproof engineering standards. If problems are found, solve them in time to ensure the quality of the project reaches excellent standards, and the project is guaranteed for three years.

Terms of payment for intransitive verbs:

There is no advance payment for this project, and Party A shall pay the progress payment according to Party B's progress. After all the projects have passed the completion acceptance and reached the excellent standard, Party A shall pay _ _ _ _% of the total project payment to Party B, and keep _ _ _ _% of the project payment as the maintenance deposit. After the expiration of the three-year warranty period, if Party B has no quality problems, Party A shall pay the balance.

Seven. Others:

This contract is made in duplicate, one for each party, with the same legal effect. After the expiration of the three-year warranty period, this contract will automatically become invalid after Party A pays off the balance. Matters not covered shall be settled by both parties through consultation.

Party A: (signature and seal)

On behalf of:

On behalf of:

Party B: (signature and seal)

Waterproof Construction Agreement 5 Party A: _ _

Party B: _ _

The total area of Party A's waterproof project is about _ _ square meters, and now Party B is entrusted to use the following waterproof materials for overall or partial waterproof treatment. The actual area shall be subject to the actual measurement by the representatives of Party A and Party B. ..

(1) Contract method (only for Party A's choice)

A. When Party A purchases materials, Party B sends technicians to provide on-site technical guidance, and the technical guidance fee is RMB _ _ per person per day, which is paid in one lump sum.

B. When Party A purchases materials for Party B's construction, both parties agree that the construction fee is RMB per square meter, which will be paid in one lump sum after the construction is completed.

C. The materials shall be contracted by Party B, and the grade and quality standard of the materials used shall be determined by Party A. The total cost per square meter shall be RMB yuan through negotiation between both parties, with one-time warranty.

(2), quality requirements

A no matter which contracting method is adopted, Party B shall complete the construction tasks assigned by Party A with good quality and quantity, and shall not shirk the responsibility for any quality accident.

B. Organize the construction according to the waterproof engineering specifications, and do not cut corners.

(3) Duration: _ _ days. Party B will enter the construction site within _ _ days after receiving the notice and will finish it within _ _ days. If the weather changes or other reasons affect the construction time, it will be postponed.

(4) Settlement method: implementation of project progress payment. After the materials construction personnel enter the site, Party A shall pay% of the total project cost to Party B, amount in words shall pay the rest to Party B according to the progress of the project, and finally pay it in one lump sum.

(5) When Party B enters the construction site, it shall be safe and civilized, and the materials shall be clear after work, and the construction waste shall be neatly stacked. Party A shall designate the stacking place, and Party B shall organize the removal. Major and minor accidents in the construction process shall be handled by Party B, and Party A shall not bear any responsibility.

(VI) During the construction period, Party A and Party B shall cooperate with each other, unite and cooperate, and Party A shall provide Party B with necessary construction conditions, accommodation, water and electricity, etc.

(VII) Warranty method: All kinds of waterproof works handled by Party B are guaranteed for five years free of charge. During the warranty period, it is really a problem of construction quality. During the warranty period, Party A can enjoy the free warranty with the card, and Party B should be on call and not delay for any reason (note: enjoy the free warranty without deducting the quality deposit).

(VIII) Party A must remit the project payment to the account provided by Party B. If it is paid to Party B in cash, the payee must hold the power of attorney of Party B as a legal person, otherwise the responsibility shall be borne by Party A..

(9), warranty credit card, the number is _ _.

(X) This Agreement is made in duplicate (each party holds one copy).

1 1. This agreement shall come into effect after being signed and sealed by the representatives of both parties.