Current location - Education and Training Encyclopedia - Educational institution - Environmental protection agreement
Environmental protection agreement
10 terms of environmental protection agreement.

With the step-by-step development of society, agreements are more and more widely used in life, and signing agreements has legal support. I'm sure most people have a headache about drafting an agreement. The following is the 10 agreement on environmental protection that I collected, hoping to help you.

Environmental Protection Agreement 1 Party A:

Party B:

Due to the construction, Party B needs to carry out the construction within this scope. Based on the principle of "mutual benefit, common development, environmental protection and benefit for mankind", in order to ensure that Party B can reduce environmental pollution during the construction, both parties hereby sign this agreement:

Party B shall meet the following requirements during the construction:

1. 1 All operations of Party B in the construction process must meet the requirements of national, local and industrial laws and regulations on safety and environmental protection.

1.2 Party B shall actively take measures to control pollutants (waste water, waste gas, solid waste, noise, etc.). ) Exceed the standard in the construction process, and formulate feasible schemes to meet the national or local emission standards within the specified time limit.

1.3 Party B shall set up obvious identification signs for the storage places of dangerous goods and hazardous wastes during the construction period.

Party A has the right to inspect Party B's construction working environment at any time. The main contents of the inspection are:

2. 1 Whether the construction environment of Party B meets the requirements.

2.2 Whether the wastewater, solid waste and noise discharged by Party B meet the standards.

2.3 Whether Party B has other environmental violations.

For the above requirements, in order to solve the environmental pollution problem without affecting the construction progress, Party A shall pay the environmental pollution mortgage of RMB10,000.00 Yuan. The deposit will be returned to the construction unit by Party B after the construction is completed and there is no environmental pollution.

This agreement is made in quadruplicate, one for Party A and three for Party B.. This agreement shall come into force as of the date of signing.

After the signing of this agreement, if it needs to be amended, it must be agreed by both parties through consultation.

Party A (seal): Party B (seal):

Representative (signature): Representative (signature):

Date: Year Month Day Date: Year Month Day

Part II of Environmental Protection Agreement Party A: Tel:

Party b: XXXXX co., ltd. tel: XXXXX

Through consultation, both parties agree that in normal economic and trade activities, both parties must abide by the following environmental protection agreements:

1. All activities, products or services of Party A must comply with national, provincial and local laws and regulations on environmental protection.

2. Party A must take active measures to prevent and continuously improve environmental pollution, ensure that environmental pollution emissions meet local standards, and promise to continuously improve.

3. In order to ensure that the environmental impact of Party A's activities and products or services can be continuously and effectively controlled, Party A must establish an environmental control system, and at the same time establish a system for regularly evaluating environmental impact and environmental control.

4. Before providing products or services to Party B, Party A must provide Party B with a written explanation of the possible impact of the products or services on the environment and get Party B's confirmation. For the products or services provided by Party A to Party B before the signing of this Agreement, Party A shall promptly supplement Party B with written explanations after the signing of this Agreement.

5. During the delivery of products or services, Party A must take effective measures to identify the possible environmental impacts of products or services, so that Party B can effectively control them after receiving them. According to relevant laws and regulations, such identification measures should include environmental identification and other content identification on the product packaging box.

6. During the delivery of products or services, Party A must take measures to control and continuously reduce the environmental impact of delivery activities, including the transportation, packaging, labeling and loading and unloading of products.

7. After Party A provides products or services to Party B, it must promise to assist in handling the subsequent environmental impact of the products or services. This commitment shall include the free recovery of solid waste brought by products or services provided by Party A, and assistance to Party B in controlling and managing other environmental pollution.

8. Party A must establish a set of emergency response procedures for environmental accidents, and regularly test and evaluate the applicability and effectiveness of the procedures.

9. Party A shall establish procedures for receiving and meeting other environmental requirements put forward by Party B, and actively inform Party B of such other requirements, including written and oral requirements. If Party B makes environmental complaints against Party A, Party A shall respond in time.

10. Party B will regularly investigate Party A's environmental protection work every year, and Party A shall actively cooperate with the investigation, and Party A shall take improvement measures for the unqualified items confirmed by the investigation.

1 1. Party B will assist Party A in environmental protection training by sending environmental protection knowledge training or environmental protection materials to Party A free of charge every year, so as to continuously improve Party A's environmental awareness.

12. The director of Party B's office is responsible for explaining the above environmental protection requirements to Party A, and Party A may consult Party B at any time.

13. If either party violates this agreement, the other party has the right to take appropriate economic penalties.

14. This agreement is made in duplicate, with each party holding one copy. The contents of this agreement shall be implemented as of the date of signing by both parties.

Representative of Party A: Representative of Party B:

Seal of Party A: Seal of Party B:

Date of signature: year month date of signature: year month day.

Part III Environmental Protection Agreement In order to comply with national and local occupational safety and health and environmental protection laws and regulations and the company's environmental policies, objectives and indicators, and exert effective influence on the occupational safety and health behavior and environmental protection behavior of the general contractor and the subcontractor directly designated by the owner (hereinafter referred to as Party B) in the construction process, Party A and Party B reached the following agreement through pre-control and supervision:

1. Our company (hereinafter referred to as Party A) undertakes the reconstruction and resettlement project of the old dangerous house of the original special purpose vehicle factory, and the management department is responsible for implementing the safety, health and environmental protection requirements in the construction stage and the supervision and management in the process.

2. During the whole construction process, Party B shall strictly abide by national laws and regulations, local government regulations and Party A's rules and regulations.

3. Party B shall protect the environment around the construction site and prevent improper damage to the natural environment.

4. Before Party B re-enters the site, all personnel shall be educated on occupational safety and health behaviors and environmental protection behaviors to reduce and prevent accidents.

5. In the process of construction, Party B shall formulate a formula to reduce the pollution of dust and noise-grade waste to the surrounding environment.

6. Party B shall abide by the labor safety, health and environmental protection management procedures specified by Party A in the construction site management.

7. The canteen and living quarters shall meet the requirements of Party A and the relevant regulations of Tangshan on hygiene, safety and health, strengthen energy-saving management and meet the safety, health and environmental protection requirements of Foer Company.

8. Party B shall bear the consequences caused by violating the terms of the above agreement.

Party A: Tianjin Branch of China Railway Construction Group

Representative or person in charge of Party A

Date, year and month

Party B:

Party B's Representative or Customer

Date, year and month

Agreement on Environmental Protection 4

In order to fully implement the contents of the construction agreement signed by Party A and Party B, further clarify the safety responsibilities of both parties in the construction process, protect the safety and health of construction personnel, and prevent all kinds of accidents, unified implementation and unified management are implemented according to the People's Republic of China (PRC) Construction Law, the People's Republic of China (PRC) Safety Law, the Law of the Ministry of Public Security No.61,the Owner's Regulations on Safety Management of Construction Projects and other relevant laws and regulations.

Second, the security objectives

1, no minor injuries or personal injury accidents.

2. No fire accident.

There are no traffic accidents.

4. The environmental pollution accident at the project site is zero.

5, no food poisoning and infectious diseases caused by diet and drinking water.

6. No safety accidents with economic losses of more than 6,543,800 yuan+0,000 yuan.

7. There will be no production events with serious social impact in this project.

Three. Party A's security responsibilities.

1. Responsible for reviewing Party B's qualification.

2. Assist Party B to find out the dangerous sources (points) and construction boundaries of the construction-related environment.

3. Assist Party B to provide rules and regulations and related requirements that must be observed, and provide Party B with necessary safety training.

4. Party A has the right to stop and punish the illegal operation of Party B's construction personnel in the construction process until the contract with Party B is terminated.

5. On the premise of ensuring safety, Party A will do its best to provide Party B with work convenience so that the project can be successfully completed.

6. If Party B fails to carry out safety management rectification in accordance with relevant safety and environmental protection laws and Party A's requirements during the construction, Party A will use the security and civilized construction deposit specified in this contract to invest in safety management and hidden dangers rectification. If the cost of safe and civilized construction measures is not clearly listed in the contract, Party A will invest 5% of the contract amount and deduct it from the contract.

Four. Safety responsibilities that Party B should undertake.

1. The person in charge of the project authorized by Party B is the first person responsible for the safety of this project, and shall be fully responsible for the safety management of this project and earnestly perform safety duties.

2. Party B must establish a safety responsibility system, formulate safety technical operating rules for each type of work, so that all construction personnel can master the engineering characteristics and construction safety measures.

3, special (equipment) operators must obtain a valid qualification certificate issued by the relevant national recommendation department to mount guard;

4. Party B shall be responsible for the physical quality, mental state, skill level and safety behaviors in operation of its employees, provide three-level safety education to the construction personnel, and take up their posts only after passing the examination and physical examination, and submit the examination results to Party A for review and filing.

5. Party B shall identify the possible hazards and potential safety hazards during the construction of this project, conduct risk assessment according to the hazards, form a list of important hazards and potential safety hazards, and formulate safety management measures.

6, there are dangerous factors in the workplace equipment and facilities should be set up in accordance with the provisions, obvious safety warning signs.

7. Party B shall formulate emergency plans, prepare materials and measures, train the emergency plans, organize drills in time and keep training and drill records according to possible critical situations, hidden dangers of accidents and emergencies.

8. Party B shall identify the environmental factors in the construction site, formulate environmental management and protection measures, and timely rectify the complaints and opinions of the owner and the general contractor.

Verb (abbreviation of verb) Matters not covered in this contract shall be settled by both parties through consultation in accordance with the Law of People's Republic of China (PRC) on Work Safety and relevant regulations of Party A's industry.

This agreement is made in duplicate, one for each party.

This agreement is an annex to the contract and has the same legal effect as the contract. It takes effect with the entry into force of the contract and terminates with the termination of the contract.

Party A (seal):

Representative (signature):

Person in charge of safety:

Date: Year Month Day

Party B (seal):

Representative (signature):

Person in charge of safety:

Date: Year Month Day

Article 5 of Environmental Protection Agreement Party A: Environmental Protection Bureau of High-tech Zone

Party B: Xi Xianyang Airport Construction Times Square Project Department

In order to jointly protect the environment and prevent environmental pollution, Party A and Party B shall strictly implement the provisions of the current National Atmospheric Environmental Quality Standard and Surface Water Environmental Quality Standard. In order to avoid air pollution, waste water pollution, etc. In order to promote the construction of civilized construction site, Party A and Party B have reached the following agreement through consultation:

I. Party B shall be responsible for:

(a), the construction site air pollution prevention and control measures:

1. When cleaning up construction waste, it must be strictly required. Construction waste should be cleaned up and transported in time, and properly sprinkled with water to reduce dust.

2 when cleaning the ground and stairs, you should sprinkle water first, then clean it, reduce dust pollution, and clean the garbage bags.

3. In order to reduce dust pollution, this project adopts commercial concrete.

(2), the construction site waterproof and pollution prevention measures:

1. Untreated muddy water is strictly prohibited to be directly discharged into urban drainage facilities.

2. It is forbidden to backfill toxic and harmful wastes with earthwork, so as not to pollute groundwater and the environment. The site should be cleaned at any time to keep it clean and tidy.

3. A special paint booth shall be set up at the site, with special personnel in charge to prevent oil leakage, dripping, leakage and water pollution.

4. The sewage and domestic garbage produced in the canteen should be discharged and cleaned up in time to prevent environmental pollution.

Two. Party A shall be responsible for:

1. Strengthen the supervision of the construction site and actively cooperate with the project management department to create a civilized construction site.

2. Party B has the right to stop any violation of the relevant provisions of this agreement, propose a solution after consultation between both parties, and order Party B to make rectification within a time limit.

Three. This agreement is made in duplicate, one for each party.

IV. After the completion of this project, this agreement will automatically become invalid.

Party a: XXX

Person in charge: XXX

Party b: XXX

Person in charge: XXX

20XX x month XX day

Article 6 of Environmental Protection Agreement Entrusting Unit (Party A): Labor Service Unit (Party B):

Project Name: ContractNo.:

Building area: Contract amount:

Date of labor service: MM DD YY to MM DD YY.

In accordance with national laws and regulations such as the Law of People's Republic of China (PRC) on Work Safety and the Law of People's Republic of China (PRC) on Environmental Protection and the provisions of the contract signed by both parties, Party A and Party B have reached the following agreement through consultation to prevent safety accidents and environmental pollution:

1. Party B's personnel must strictly abide by national laws and regulations on safety and environmental protection and Party A's safety and environmental protection rules and regulations, and accept the supervision and management of Party A's management personnel. When performing this contract, Party B shall take the initiative to obtain relevant occupational safety, health and environmental protection management systems from Party A, and convey them to Party B's employees to educate them to abide by them.

2. Party A has the right to educate Party B's employees on safety, health and environmental protection.

3. Party B must identify hazards and environmental factors, and formulate perfect safety technical measures, environmental pollution control measures, emergency plans and rules and regulations; Party B shall be equipped with full-time (or part-time) safety and environmental protection management personnel, who shall be responsible for safety and environmental protection management in the process of labor service and promptly investigate and deal with on-site violations and hidden dangers. The main person in charge, the safety officer and the on-site administrator shall obtain the safety management qualification certificate issued by the Safety Supervision Bureau.

4. Party B must do a good job in safety and environmental protection education and safety and environmental protection technical disclosure for workers, and make records. Newly recruited (replaced) employees must pass the three-level safety education and have a certain apprenticeship before they can work independently. At the same time, it must report to Party A's regional department in writing, and Party A shall conduct training in branches, workshops and security teams. Special posts should hold relevant operation qualification certificates.

5. Party B's personnel must wear labor protection articles in accordance with the regulations when entering the workplace, and the safety helmet must be fastened with a hat strap; Wear masks, protective glasses and flame-retardant work clothes for operations such as smelting and pouring water; Wear a mask in dust and toxic environment; Earplugs should be worn in the environment with high noise influence; Wear goggles when working with open flame; Wear safety belts, soft-soled shoes and protective nets when working at height; Electricians must wear insulating shoes.

6. It is forbidden for Party B's personnel to use Party A's various mechanical and electrical equipment, instruments and meters, valve switches, etc. Casual;

7. Under the on-site guidance of Party A's personnel, Party B shall connect energy media (including water, electricity, wind, gas, steam, hydraulic pressure, etc.). ) the required position and go through the necessary examination and approval procedures. Limited space operation, gas facilities maintenance, aerial work, etc. Manage according to dangerous operations and perform examination and approval procedures.

8. When Party B's vehicle is driving in Party A's factory, it must strictly abide by the speed limit and loading regulations, and it is not allowed to park on Party A's road at will. In principle, parking at the parking place allowed by Party A shall not exceed 24 hours.

9. Party A has the right to evaluate Party B's violations and hidden dangers. The assessment standard is 100-300 yuan, and the assessment of major hidden dangers and accidents is RMB 500-20xx, and Party B shall be informed in time. The assessment amount shall be deducted by the Finance Department of Hongyu Company when settling Party B's labor remuneration.

10. When Party B works in the management area of Party A, it shall report to Party A's on-site employer and enterprise management department within half an hour in case of personal injury or death; In case of personal injury or death of Party B's personnel on the job, if there are no Party B's management personnel on site, Party A's on-site employer shall notify Party B in time.

1 1. Party B shall take full responsibility for the safety accidents caused by its own reasons, and bear the fines imposed on Party A by Party A's superior departments ... All industrial accidents of Party B's employees shall be properly handled by Party B in accordance with the provisions of industrial injury insurance. Upon analysis, if it is the responsibility of Party A, Party B shall claim compensation from Party A. If personal injury, equipment damage, production accident and environmental pollution accident are caused by Party B, Party B shall bear the responsibility, compensate all losses and bear the fine imposed on Party A by Party A's superior department. Otherwise, if personal injury or equipment damage is caused by Party A, Party A shall bear the above amount to Party B. If both parties are responsible for the accident, they shall negotiate to bear the above amount according to the size of the responsibility.

12. Party B shall pay work-related injury insurance premiums for the employed employees.

13. This agreement shall come into force from the date of signing until Party A and Party B fully perform this contract and all obligations under this agreement. This agreement is made in triplicate, with Party A, Party B and Party A's enterprise management department holding one copy respectively.

Attachment: Contact Form of Safety and Environmental Protection Management between Party A and Party B (to be filled in when signing this Agreement)

Party A (official seal) and Party B (official seal)

Person in charge of the competent department (signature): person in charge of the project (signature):

Person in charge of safety (signature): person in charge of safety (signature):

Year, month, sun, moon, sun.

Article 7 Environmental Protection Agreement In order to ensure the environmental protection of XXXXXXXXX project, the following environmental protection agreement was signed by both parties with mutual consent, in order to conscientiously implement the Law on Prevention and Control of Water Pollution in People's Republic of China (PRC), the Law on Prevention and Control of Solid Waste Pollution in People's Republic of China (PRC), the Law on Prevention and Control of Air Pollution in People's Republic of China (PRC), the Law on Prevention and Control of Environmental Noise Pollution in People's Republic of China (PRC) and other relevant laws, regulations and measures.

I. Both parties to the agreement

1. Name of company: (Party A)

2. Name of unit (Party B)

2. During the construction, Party A and Party B must strictly implement the policies, laws, regulations, standards and systems on environmental protection promulgated by the state, Jiangsu Province, Yangzhou City and superior units. In the process of construction, it will not cause adverse social impact and fines to the other party's construction because of its illegal construction. The two sides will work together to realize civilized and safe construction and create a green garden-style construction site.

Three. Party A shall be responsible for introducing the basic situation of the construction site to Party B's construction projects, and shall meet Party B's requirements for matters that Party B requires Party A's assistance according to the contract.

4. Party B's canteen should be equipped with exhaust fans and grease traps to reduce environmental pollution. The grease trap should have low AG and secondary precipitation.

Five, Party B's workers should be clean in their daily work, and the construction waste should be lifted in containers, and it is forbidden to throw it in the air.

Six, Party B's construction project should be in accordance with the provisions of their own workers admission safety education, and educate workers to abide by Party A's construction site environmental protection management system, such as illegal construction or illegal operation, Party A has the right to punish.

7. Party A is responsible for formulating water and electricity saving measures, and Party B must abide by the relevant requirements in the measures and seriously implement them.

Eight. Toxic and hazardous wastes generated by Party B's personnel in important environmental posts shall be sent to the designated place for storage in time.

Nine, Party B in the construction process due to Party A's facilities do not meet the requirements of the social adverse effects and social fines, by both parties through consultation in accordance with state regulations. ..

X. Party A shall not be responsible for the social adverse effects and social fines caused by Party B's illegal command, illegal operation or damage to Party A's facilities during the construction. Party B shall be solely responsible for handling and reporting to the superior unit.

XI。 Supplementary terms (the project department will decide according to its own situation):

This agreement is made in duplicate, one for each party, and signed and sealed by both parties.

Signature and seal of Party A:

Seal and signature of Party B:

20XX x month XX day

Article 8 of the Environmental Protection Agreement Party A:

Party B:

In order to seriously implement the national laws, regulations and rules on safety production and environmental protection, clarify the responsibilities and rights of relevant parties in safety and environmental protection management, effectively supervise and coordinate the safety and environmental protection management measures and personnel behaviors of relevant parties, prevent all kinds of accidents, and ensure the normal operation of the company's environment and occupational safety and health management system, both parties agree to sign this agreement at the same time as signing the project contract through consultation, and consciously abide by it.

I. Overview of the Project:

1, project name:

2. Project location:

3. Implementation time:

4. Contract term: YY to YY.

Two. Responsibilities and rights of environmental and safety management of Party A and Party B:

(I) Responsibilities and Rights of Party A

1. Party A has the right to request relevant qualification certificates and documents from Party B and check the qualification.

2. Party A has the right to urge Party B to abide by national laws, standards and enterprise rules and regulations on safety and environmental protection, and to provide services and activities for the Company in an orderly manner.

3. Party A has the right to supervise and inspect the implementation of Party B's safety precautions, and has the right to stop and correct hidden dangers of accidents and illegal and risky behaviors. Party A has the right to stop its operation and give it a yellow card warning and economic punishment if there are great potential risks or management confusion and it does not obey the supervision and coordination of Party A..

4. When Party B has a safety and environmental accident in our company, Party A shall try its best to help rescue and protect the scene of the accident and report it in time, and shall have the right to conduct or participate in the investigation and handling of the accident.

5. According to the nature of the project, Party A has the right to collect the security risk management deposit of 0.5-65,438+million from Party B, and assess the security risk management deposit paid by Party B when the safety and environmental protection technology and management measures are not in place, employees violate regulations, project quality and safety accidents occur.

6. The on-site representative designated by Party A is the person in charge of the supervision and management of safety and environmental protection on the project site of Party A, who carries out daily supervision and management on behalf of Party A and assists the supervision and assessment of the safety management department of Party A..

(II) Responsibilities and Rights of Party B

1. Party B shall take the initiative to provide Party A with a copy of legal business license and valid certificate or qualification certificate, handle the pass formalities for employees in time, and wear the pass correctly to enter and leave the work site.

2. Party B shall take the initiative to pay the security risk deposit to Party A, abide by Party A's various management systems, strictly implement operating procedures, implement safety precautions, use labor protection articles correctly, and special operators shall hold relevant certificates.

3. Party B's personnel should seriously study and implement Party A's safety notice, designate special personnel to be responsible for safety and environmental protection management, strictly implement the project coordination meeting system, and accept Party A's supervision and unified coordination management.

4. Party B shall timely apply to Party A for the examination and approval procedures for temporary electricity use, hot work and dangerous operations, and strictly do a good job in guardianship.

5. Party B shall take the initiative to report to Party A and accept Party A's safety inspection and supervision of its own equipment, facilities and construction site, consciously do daily management and inspection, and correct and rectify unsafe hidden dangers.

6. Party B must set up safety fences and warning signs in the construction area to ensure construction safety.

7. When there are two or more construction units in the same construction area, Party B shall sign a safety agreement with a third party to clarify the safety responsibilities of both parties and implement safety measures to prevent accidents caused by cross-operation.

8. When Party B has a management responsibility accident or an accident that causes casualties and property losses of Party A or a third party due to Party B, all responsibilities shall be borne by Party B, and Party A shall consciously accept the assessment of its security risk management deposit.

9. When the project is completed, it is necessary to clear the materials after work, and it is strictly forbidden to dump the "three wastes" at will.

10. Other outstanding matters shall be settled by both parties through friendly negotiation.

4. This agreement shall come into force as of the date of signature. This agreement is made in triplicate, two for Party A (one for the Safety Management Department and one for the organization and implementation unit) and one for Party B. ..

Party A: (signature) Party B: (signature)

Representative: representative:

Year, month, sun, moon, sun.

Safety and Environmental Management Representative: Safety and Environmental Management Representative:

Year, month, sun, moon, sun.

Article 9 Environmental Protection Agreement Party A: (hereinafter referred to as "Party A")

Party B: (hereinafter referred to as "Party B")

In view of the good cooperative relationship between Party A and Party B, in order to effectively carry out environmental education activities for primary school students (hereinafter referred to as "environmental education for primary school students"), Party A and Party B, based on the principle of mutual assistance and common development, reached the following agreement on the cooperation of "Green Home" Environmental Volunteers Association of Anhui Agricultural University in establishing an environmental education base for primary school students in Hefei Amber Primary School through friendly negotiation:

I. Cooperation projects

(1) Cooperation Project: Primary School Students' Environmental Education Base of "Green Home" Environmental Volunteers Association of Anhui Agricultural University.

(2) Cooperation time: long-term cooperation.

Second, the cooperation content:

(1) Party B provides Party A with an environmental education base for primary school students.

(2) Party A shall assist Party B to carry out environmental education activities for primary school students.

Three. Rights and obligations of both parties

(I) Rights and obligations of Party A

1, permission:

Party A cooperates with Party B to establish the "Environmental Education Base for Primary School Students of Anhui Agricultural University' Green Home' Environmental Volunteers Association", which will be established by Party A in Party B from the date of signing the agreement.

Environmental education base;

Party A can list at the gate of Party B's school (content: primary school environmental education base of "Green Home" Environmental Volunteers Association of Anhui Agricultural University), which can clearly indicate that Party B's site is Party A's primary school environmental education base;

The final interpretation right of each primary school environmental education activity belongs to Party A. ..

2. Obligations:

Party A shall assist Party B to improve primary school students' environmental awareness and enhance their sense of environmental responsibility through environmental education activities in primary schools;

Party A's primary school environmental education activities need to be held once a month, tentatively on the afternoon of the first Wednesday of each month;

As the organizer of activities, Party A plans, prepares and organizes every activity. Party A guarantees that all activities will be carried out steadily and orderly, and will keep in touch with Party B during the activities.

(II) Rights and obligations of Party B

1, permission:

Party B has the right to know the progress of environmental education activities in primary schools from Party A, and Party A must truthfully report it;

In case of emergency, Party B has the right to timely adjust Party A's primary school environmental education activities;

Party B may invite Party A to participate in other similar environmental education activities in primary schools, and Party A shall assist Party B to improve the environmental awareness of primary school students and enhance their sense of environmental responsibility.

2. Obligations:

Party B shall provide Party A with a place for each primary school student's environmental education activity, and arrange for primary school students to participate in it in an orderly manner;

Four. Dispute clause

This agreement is valid for a long time. This agreement shall not be unilaterally dissolved after being signed by both parties. If the agreement needs to be dissolved, it can only be dissolved after both parties agree through consultation.

In the process of implementation, if all possible disputes, objections and disputes arise due to unforeseen factors, they can be resolved through consultation between the two parties.

Verb (abbreviation of verb) supplementary clause

This agreement has three pages (excluding the cover) and is made in duplicate, one for each party, with the same legal effect. Matters not covered in this agreement shall be settled by both parties through friendly negotiation or supplementary agreement.

Attachment of intransitive verbs:

Anhui Agricultural University "Green Home" Environmental Volunteers Association Primary School Environmental Education Activity Program

Party A (seal): Party B (seal):

Representative (signature): Representative (signature):

Date: Year Month Day Date: Year Month Day

Environmental Protection Agreement of Party A's Learning Office in Xianning Vocational and Technical College 10

Party B: classes and individuals from all departments of Xianning Vocational and Technical College.

Name of the object: promoting health maintenance and health work of various departments.

In order to respond to the "double innovation" of vocational colleges, we should make adjustments in health work, actively put forward the requirement of banning the use of non-environmental materials immediately or gradually, and establish a green partnership. In order to ensure long-term and stable campus cooperation, Party A and Party B have reached the following agreement:

1. Party B shall clean the sanitation of each clean area on time according to the requirements of Party A. ..

2. The requirements and problems raised by Party B to Party A shall be handled in time and must conform to the actual situation of the campus.

Third, if the department finds that individual students affect the whole, it can seriously criticize individuals by providing a series of information.

Four, all departments must maintain the contents of this agreement, positive response, abide by the campus "ten noes" convention.

Five, comply with the "double innovation" work in vocational colleges, be responsible for health work and be civilized students.

6. Disputes arising from the execution of this Agreement shall be decided by an arbitration institution confirmed by both parties.

Seven. If Party B fails to countersign this Agreement without giving any explanation, it shall be deemed that Party A agrees to the terms of this Agreement by default.

Eight. This agreement is made in duplicate, one for each party.

Can't meet, please explain the reason:

Party A:

Signature and seal of manager:

Party B:

Signature and seal of manager:

Date: XX, XX, XX, XX