Bidding technical scheme
1. Delivery place, delivery time, delivery method, transportation conditions and installation time:
2. Delivery place: the place designated by the user.
3. Delivery time: 0/5 days before signing the contract.
4. Delivery method: After the equipment arrives at the designated place, it can be accepted by the customer.
5. Transportation conditions: special-purpose car freight, the freight is borne by us.
The quality standards and acceptance methods of the bidding goods are as follows:
1. After the product arrives at the place designated by the user, the user will organize the equipment acceptance.
2. Acceptance criteria:
(1) Quality acceptance: product acceptance shall be conducted according to national standards, industry regulations or other relevant standards; Carry out product acceptance according to the product specification of the enterprise.
(2) Quantity acceptance method: According to the contract requirements and packing list, the product configuration list is consistent with the product parts, and a complete set of technical materials such as product specifications, product certificates and user manuals are attached.
Spare parts:
If the original equipment is damaged due to abnormal operation of the instrument, the company will provide corresponding spare parts according to the actual situation, and the company will provide users with enough wearing parts. The user's instrument operation provides strong support.
The duration of the problem during the quality guarantee period is:
If there is a problem in the use of the product, we promise to give an answer within 2 hours. If technicians are needed to solve the problem on the spot, we will arrange technicians to drive their own cars to the scene within 24 hours.
Bidding technical scheme:
According to the technical parameters of the products in the bidding documents and the actual situation of the users, our company chose the high-quality products above the mid-range to ensure the stable performance, reliable quality, low price and good quality of the instruments. Products.
Others:
The company signed a technical support contract with the manufacturer. The manufacturer undertakes all technical support. The technical specifications of the products represented by the company can meet the bidding requirements. In order to ensure that the responsibilities of suppliers, buyers and manufacturers are in place, the company plans to adopt a tripartite technical service agreement in its business operations to maximize costs. End users can always find relevant units and personnel to deal with their problems.
Reference technology scheme is a targeted and systematic method, response measures and related countermeasures to study and solve various technical problems. The contents can include scientific research scheme, planning scheme, planning scheme, construction scheme, design scheme, construction scheme, construction organization design, technical bidding documents in the bidding process, hoisting operation scheme, production scheme, management scheme, technical measures, technical route and technical transformation scheme.
In patent literature, technical scheme refers to a clear and complete description of the combination of technical features adopted by an invention or utility model to solve its technical problems.
References:
Baidu Encyclopedia-Technical Scheme