Current location - Education and Training Encyclopedia - Educational institution - School gate maintenance application report
School gate maintenance application report
School gate maintenance application report (select 1 1)

The school gate is extremely important and is the first line of defense for children's safety. The following is the application report of school gate maintenance compiled by the application network, hoping to help you.

School Maintenance Application Report 1 County Education Bureau:

Since Shechong Middle School was merged into Fengshan Middle School, our school has been boarding in the former site of Shechong Middle School. The present school gate is an old school gate, with an old structure and unsightly appearance. In addition, the school gate is less than 2 meters from the road outside the school gate. In the past, some students were almost hit by a car running on the road outside the school gate, which was a big safety hazard and easy to cause safety accidents. It is urgent to tear down the old school gate and rebuild the new one.

Now I apply to the county education bureau for the new school gate and guard room, and the estimated cost is about 654.38+200,000 yuan. I sincerely hope that the superior will support me in time!

Xx central primary school

20XX May 25th

School Gate Maintenance Application Report 2 Guild Town Central School:

Last year, our school built a new comprehensive building with the special education funds of the central government. Because the supporting project has not been completed, it has not been used so far. In order to ensure the safety of the school and facilitate the management of students, the school team discussed and decided to install aluminum rolling gates on the two stairs of the new comprehensive building, with a total cost of two thousand five hundred and five yuan (RMB 2,505.60) (the unit price is calculated by 80 yuan per square meter). Therefore, the report is submitted to the superior for approval.

The above instructions, no, please indicate.

Guild central school

20XX.9.2

3. School gate maintenance application report school:

Our center conducted a safety inspection of the teaching building and the experimental building, and found that there was a broken glass door in the east building of the teaching building, a broken glass in the classroom of teaching building 522, and a broken glass in the stairwell on the third floor of the northwest building of the experimental building, which was a potential safety hazard. Our center consulted the Infrastructure Office of the Logistics Department on maintenance matters. At the suggestion of the Infrastructure Office, we made an inquiry to the merchants as follows:

1. 6mm tempered glass door (height 228cm, width 94.5cm) in the east building of the teaching building.

2.522 classroom glass window of teaching building (height 44.05cm, width 1 1.47cm)

3. Stair glass (9 1.70cm, 1 1. 12cm) of the third floor in the northwest of the experimental building.

The total material cost (including installation cost) of the above three items is 3.7㎡×200 yuan /㎡=740 yuan, and the warning bar of tempered glass door is 40 yuan. The total cost of materials (including installation fees) is 780 yuan, which is to be paid from the maintenance fee of teaching equipment.

Whether to implement, please give instructions!

Teaching service center

April 13th, two thousand xx

School maintenance application report 4 Dear leaders of the Education Bureau:

There are 78 doors in primary schools, 66 doors in middle schools and 36 doors in kindergartens. Due to years of disrepair and serious damage, the battens of many doors have been completely damaged, the door panels have been damaged, the glass can not be embedded, and the door reinforcement can not be carried out; There are many cracks in the joint between the door frame and the wall, the cement blocks in the inner wall often fall off, and the front and rear doors of the classroom are difficult to open, and a little breeze will be blown away, which will affect the teacher's class. When the wind is strong, the glass of the door often falls off, which brings great security risks to students. In order to eliminate this hidden danger, the school has also taken many measures to strengthen the classroom doors many times, but it can not fundamentally solve the problem. In order to ensure the personal safety of teachers and students and the property safety of the school, so that teachers and students have a safe and comfortable learning and working environment, our school urgently needs to replace the wooden doors and windows of the wing classroom.

I especially apply to the bureau leaders, hoping that the leaders will solve it as soon as possible.

Xx No.24 Middle School

20xx September 16

School Maintenance Application Report 5 General Manager Lu and Vice President Hu:

Hello!

The door of the living area has been repaired many times. At present, both the hub and the door are broken. Fire inspection, the door of our living area is too small, which does not meet the fire protection requirements. It is required that our door be widened 1.5 meters or more. At the same time, the gate of our living area faces Xingci Sixth Road, which has an impact on our intuitive image, in order to ensure compliance with fire protection requirements and enhance the company's external image; The administration department applied for replacing the gate of the living area with an electric gate.

At the same time, apply to widen the living area gate 1.5m to 2m.

Hope the leaders can give recognition!

Applicant:

time

6 yinshan town Municipal People's Government School Maintenance Application Report:

Yinshan town Zhangshanwo Primary School was rebuilt in September, 1990. The school is located in Wo Village, Zhang Shan City, yinshan town, with an area of 2,400 ㎡ and a building area of 1024㎡. Teaching building 1, 6 bungalows.

The main building of the school was built in the 1990s and has been in disrepair since then. Cracks, water seepage and water leakage occurred in many places on the roof of the school, which damaged some teaching facilities and affected normal education and teaching. Therefore, the buildings were reinforced at 20 10 and 10. The roof is cast, but the thickness is only 10 cm, and the waterproof effect is poor. Students can't attend classes normally in summer, so it is urgent to build insulation layer. The maintenance area of the top of the teaching building in this school is about 430 square meters, and each square meter needs 60 yuan, which costs 25,800 yuan. The floor of the teaching building is uneven and needs maintenance. The area is about 860m2, and each square meter is 16 yuan, 13760 yuan, and the garbage removal is 2000 yuan. The total cost is 4 1560 yuan.

In order to make the school work smoothly, we implore the yinshan town Municipal People's Government to allocate maintenance funds 4 1560 yuan.

School gate maintenance application report 7 Dear leaders of the school security department and the security department of the Education and Sports Bureau:

Hello!

Cao Fang Primary School in Beiyangzhai Township was put into use on September 20 10. At present, many places on the roof have been leaking water for more than a year, which has caused all the circuits, fans and fluorescent lamps on the third floor to be damaged, which has affected the normal education and teaching of our school, and students can't attend classes normally in each room. Now is the flood season, and it is urgent to waterproof and maintain the wall of the teaching building roof. In addition, most of the wooden doors in the teaching building of our school are deformed and damaged, and need to be replaced again. (with photos)

Description of the specific situation of the house to be repaired:

Building area of teaching building and student dormitory: 700 square meters.

Maintenance plan: the floors of the two buildings are waterproof, and the internal and external walls are repaired and painted. Budget funds: 250,000 yuan.

The allocation budget for doors and windows is 50,000 yuan, totaling 300,000 yuan.

The above situation has caused great hidden dangers to the personal safety of teachers and students and seriously affected the normal teaching order. Due to the limited funds of our school, it is impossible to maintain it. Now we apply to the superior leaders for repairing the doors and windows on the top of our teaching building.

Hereby apply

Xxx primary school

School gate maintenance application report 8 Dear leaders of Education Bureau:

Hello!

Since our school moved into the new campus on September 20 12, the special classrooms have been improved one after another. However, because all the special rooms in our school (the third floor of the west building of the school) were built in the 1990s, the floors were seriously damaged, the walls were shelled, and the doors and windows were outdated, so they had to be repaired again.

I urge the superior leaders to consider the actual situation of our school and do some urgent and special things for our school to study the maintenance of our special rooms and houses. We are grateful and eager to be solved.

Hereby apply!

Attachment: Description of the specific situation of the house to be repaired:

Building area of West Building: 1744.9 m2.

Maintenance plan: waterproof floor, painting of internal and external walls, painting of doors and windows.

Budget funds: 98,000 yuan.

9. Education Bureau School Maintenance Application Report:

The east wall of our school (formerly Huaining Teachers College) was built in July 1992, and it has been 2 1 year. Due to the merger of Shipai Senior High School (formerly huaining middle school) in 20xx, the East District was neglected and abandoned for six years. In addition, on June 65, 438+February 5, 20xx, the influence of weeds, miscellaneous trees and rain caused a section of the fence at the east reservoir to collapse about 65,438+05 meters, and no one was killed or injured. There is also a fence over 45 meters, and the slope damage is getting more and more serious, and it is in danger of collapse at any time.

? This wall is located beside the main road of the former residents. Pedestrians come here at a trot, for fear of falling and getting hurt. Residents have repeatedly reported to the school that they are stranded due to economic problems. In order to ensure the personal safety of past residents and eliminate hidden dangers, this situation was reported to the bureau leaders.

I am here to convey

Salute!

Xx senior high school

Xx,xx,XX,XX

School Maintenance Application Report 10 Leaders,

Our school is a public full-time institution. The existing school buildings are all built in 1996. There are currently 27 classrooms, offices and function rooms.

Due to various objective reasons such as disrepair, there are great hidden dangers in the safety of school buildings. The rafters on the roof of the school building hung down and eight bricks on the roof slipped down. At present, school buildings have become dangerous buildings, posing a serious threat to the lives and property of teachers and students. Now it can be maintained. It is planned to remove the rafters and eight bricks and replace them with wooden roofs. It is estimated that each room is more than 5,000 yuan, totaling about 6.5438+0.5 million yuan. But at present, the school is short of funds, and there is no source of funds in the village, so it is impossible to update and maintain.

In order to solve the urgent need, I look forward to applying for repair funds from superior leaders.

School Maintenance Application Report 1 1 School Security Department of Education Bureau:

On April 24th, 20xx, the wall behind our school dormitory collapsed due to heavy rain. The collapsed fence is about 38 meters long and 2.5 meters high. The bricklayer's maintenance and reinforcement cost a total of 5200 yuan (unpaid). In addition, the walls in other areas of the school are inclined due to the exposed bricks and the subsidence of the foundation, which is in danger of collapse at any time.

? Now the bricklayer's budget needs about 30 thousand. Our school is short of students and funds, so it is impossible to squeeze out funds from public funds to maintain and strengthen the fence. In order to make our teachers and students have a comfortable and safe learning and living environment, please ask the leaders to come to our school to verify the situation and allocate 35,000 yuan for the maintenance and reinforcement of the fence.

xxx

20xx year x month x day

;