Current location - Education and Training Encyclopedia - Educational institution - Summary of work of water conservancy professional and technical personnel
Summary of work of water conservancy professional and technical personnel
Summary of the work of professional technicians in water conservancy 1 Summary of the continuing education of professional technicians in Water Conservancy and Hydropower Engineering Bureau. The continuing education of professional technicians is a kind of follow-up education to supplement, update, broaden and improve the theoretical knowledge and practical skills of on-the-job professional technicians, improve their knowledge structure, improve their innovation ability and professional level, and meet the needs of scientific and technological progress and practical work. It is an important embodiment of "building a lifelong education system and creating a learning society", a necessary means to improve the comprehensive quality of professional and technical personnel and cultivate high-level professionals, and an important measure to rationally develop talent resources and realize the sustainable development of water conservancy. Through this training, professional and technical personnel's understanding of modern water conservancy has been further improved, new business knowledge has been further improved, knowledge structure has been further updated and improved, knowledge has been broadened, and the training has achieved the expected results. The training situation is summarized as follows:

First, leaders attach importance to it and are fully prepared.

This year, according to the notification requirements of the personnel departments of cities and counties, the competent business departments will organize the continuing education of professional and technical personnel. In accordance with the spirit of the document, our bureau attached great importance to it, held several special meetings to study and deploy continuing education, planned, started and arranged early, and determined special personnel to focus on this work, ensuring the smooth progress of the training work. A detailed teaching and training plan and training attendance system have been formulated, so as to achieve the "three implementations" of personnel, content and time, and ensure the smooth completion of training. We also specially purchased modern electrification teaching equipment and related professional knowledge CDs, and hired experts, professors and teachers from the Municipal Water Affairs Bureau and Shandan Training School to give special lectures on public courses and professional knowledge, which improved the training quality.

Second, it is rich in content and diverse in forms.

This training mainly includes learning some economics, computer applications, Gansu historical stories, and basic knowledge of water conservancy. Pay attention to the effectiveness of learning in content selection, and pay attention to new theories, new technologies, new skills, new information, new knowledge and new methods based on the principles of systematicness, advancement, scientificity, practicality and orderliness. It takes the form of on-site teaching, observation teaching and "menu-style" teaching method, with flexible methods and various forms.

Third, the key points are prominent and the results are remarkable.

This training focuses on the ability building of professional and technical personnel, aims at improving the overall quality and ability level of professional and technical personnel, adheres to the principles of teaching according to needs, seeking truth from facts, being practical and effective, and combines theory with practice, current with long-term, general improvement with key training to improve the ability and quality. During the training, everyone can seriously observe discipline, correct learning attitude, and show a positive attitude of being diligent and eager to learn. Through your teachers' simple lectures and students' careful lectures, our policy and theoretical level and professional quality have been improved to some extent.

Fourth, the existing problems and improvement measures

Although the continuing education and training of professional and technical personnel has achieved certain results, there are still some problems that cannot be ignored. First, individual grassroots leaders do not pay enough attention to the continuing education of professional and technical personnel, which is equivalent to general training. They have a negative attitude and cannot guarantee that professional and technical personnel will participate in training on time. Second, individual professional and technical personnel do not know enough about continuing education, have incorrect attitudes and lack the initiative to learn. They have to deal with it, so they can't take part in the training seriously. Third, the quality and benefit of continuing education for professional and technical personnel are still not high, and the infrastructure and management system are not perfect enough.

The existing problems in the world need to be solved and improved step by step in the future work. In 20xx, the continuing education of professional and technical personnel will focus on supplementing, updating, broadening and improving theoretical knowledge and practical skills, improving knowledge structure, improving innovation ability and professional level, and further improving professional knowledge and knowledge structure. At the same time, strengthen organizational leadership, deepen the reform of training mechanism, and realize the regularization, institutionalization and scientificization of continuing education.

Summary of the work of water conservancy professional and technical personnel 2 pages. School professional knowledge, improve work skills.

When I first joined the work, I first came into contact with quality management. Although this job has little connection with my major, in order to change my role as soon as possible and adapt to the requirements of the job, I study hard on quality management knowledge and improve my work skills. Through my efforts and the help of my colleagues, I can now master quality management skillfully.

Second, the ideological and political aspects.

Be strict with yourself politically, actively participate in various political activities, consciously study political theory, and strive to improve the quality of political theory. I put my career first in my work, regardless of personal gains and losses, and work hard. Pay attention to investigation and study, be diligent in thinking, have clear thinking, and be able to combine engineering management theory with work practice.

Third, organization and coordination

In practical work, as a water conservancy project quality management worker, he can help the department head to do a good job in quality management and provide a guarantee for the effective development of the department work. At work, he not only fully believes in himself, but also pays attention to strengthening the study of other old employees, making better use of the learning resources around him and constantly improving his ability from all aspects.

Fourth, business ability.

Since I joined the work, I have worked hard to learn the theoretical knowledge and professional skills of this major, attached importance to constantly improving my professional level and teaching ability, and strived to improve my professional technical ability and level through different forms of study in my spare time according to the actual needs of quality management of water conservancy project construction. Through years of hard work, my professional skills and ability to control my work have been greatly improved, laying a solid foundation for better completing various tasks. In the five years of water conservancy project quality management, I have been learning the knowledge of water conservancy project quality management system, so let me think about the relationship between theory and practice from another angle.

Problems with verbs (abbreviation of verb)

Personally, I feel that the innovation of engineering quality management is not enough, and I don't have enough time to invest in professional technology learning, so the application level of professional technology needs to be improved. In the future work, I will study harder, apply what I have learned to do a good job in engineering quality management, constantly improve my working methods, improve my work efficiency, be down-to-earth and work hard to become a qualified professional and technical person in engineering quality management.

Summary of the work of water conservancy professional and technical personnel 3 After years of practical technical work in water conservancy and hydropower, I have my own thoughts on doing a good job in professional and technical work. On the occasion of summing up my work, I'd like to discuss with you:

(1) First of all, I think as a professional technician, in the final analysis, we are still intellectuals. "Independent spirit, free thought and social conscience" should be the academic spirit and value orientation pursued by our professional and technical personnel. We should establish the concept of "serving the society and creating value" and create our own social value through our own professional technology. At the same time, we must also have a "technical conscience." In the selection of engineering design scheme, we should take into account the interests of all parties, not only the economic interests of our own projects, but also the balance of interests of all parties in society. This is a practical and feasible technical scheme.

(2) Professional and technical personnel should have a "realistic and responsible" attitude. On the premise of ensuring the safety of the project, they should compare multiple schemes according to the scale of the project, optimize the scheme as far as possible, save the project investment for the country and the owner, and cannot be blindly conservative. This is also the core of a responsible outstanding professional and technical personnel. In learning, we should have the spirit of active learning. First, we should cultivate our interest in professional technology and love our major. Secondly, we should have the spirit of being willing to bear hardships and actively learning, be diligent in being a man, doing things and studying technology, so as to improve our professional and technical level as soon as possible.

(3) Professional and technical personnel should have the ability of empathy. When choosing a design scheme, we should consider the problem comprehensively from the overall perspective, see clearly the key problems of the scheme, don't stick to the local, drill a "technical dead corner" and be a good leader's staff.

(d) Professional and technical personnel should take the road of integrating theory with practice in their study. They should not be pure "theorists" or "empiricists". They should grasp the overall design of the project from a theoretical height, but the specific design should be considered in line with the actual situation of the project. They usually go on with their problems, observe and think more, learn from experienced grass-roots managers and construction technicians with an open mind, communicate with relevant mechanical and electrical equipment manufacturers and learn about the latest mechanical and electrical equipment.

(5) Professional and technical personnel should base themselves on this major in their study, actively learn similar professional technologies, understand relevant professional technologies, strive to improve the comprehensive technical level, develop various engineering design capabilities, and be an excellent project design manager on the basis of learning this major well.

Summary of the work of water conservancy professional and technical personnel 4 This year is an extraordinary year in my life. On June 15 this year, I graduated from Zhejiang University of Technology and went to work in Changxing County Water Conservancy Project Management Station. With the cordial care of the leaders of the Water Conservancy Bureau and the careful help of my colleagues, I strengthened my study of political theory and professional knowledge, greatly improved my political and ideological level, and became familiar with the content and nature of my work. Lay a foundation for better work in the future. Now I will make a summary of my thoughts, work, study and life in the past year.

First, the ideological aspect.

Committed to solving the worries of the masses, concerned about the safety of the masses, and strive to do more good things, solve more problems and do more practical things for the masses. Because the water conservancy project management station generally undertakes the management task of important water conservancy projects in the basin or region. These water conservancy projects play social benefits such as flood control, irrigation and shipping, and shoulder the important responsibility of "benefiting one side of the people and maintaining one side's peace". Therefore, the management of water pipe station project is directly related to the safety of people's lives and property. As a water conservancy project manager, I feel a great responsibility, and I must not take it lightly in project management.

Second, the work.

It has been almost a year since I worked in July last year, and I have gained a lot in my first year of work. Theoretical study gave me a preliminary understanding of water conservancy. Ignorance of school education is the premise and foundation of all progress. Specifications, magazines and professional books kept me going, because the foundation of professional courses in universities made it easier for me to understand and master these water conservancy knowledge. After learning some theoretical knowledge, I began to know that water is the lifeline of human survival and development, the lifeline of national economy and ecological environment, and the important material foundation of sustainable development. The task of water conservancy construction is very arduous. With the increase of population, economic development, social progress and the improvement of urbanization level, the demand for water resources will further increase, and the requirements for water security will become higher and higher. But these understandings are superficial, and I still need to understand them in practice.

Practice makes my business skills grow and my working ability strengthen. The intense working rhythm has greatly improved my working ability and ideological understanding. My colleagues' persistence and love for work deeply infected me. They took time out of their busy schedules to help and teach us patiently. They set a good example for me in my life and work. Let me feel the burden on my shoulders and let me know the direction of my future efforts. This year, I passed the flood recheck calculation of most reservoirs in the county, and got a better understanding of the characteristic values and geographical locations of reservoirs. Also participated in the preparation of the planning and design project of agricultural ecological management in Guzhu small watershed. In addition, we often follow the leaders to check the flood control of reservoirs and check the safety and reinforcement of thousands of reservoirs. The nature of work also requires me to have a comprehensive understanding and mastery of the knowledge of various professions in the water conservancy industry, so as to really accumulate a lot. Through practice, my ability to solve practical problems and organizational skills have also been well exercised.

Third, the direction of future efforts

As the saying goes, "gold is not enough, and no one is perfect." In my future work, I will carry forward my achievements, overcome my shortcomings and work hard in the following two directions:

1, learning is endless, the times are developing with each passing day, and the knowledge of various disciplines is changing with each passing day. I will persistently learn all kinds of theoretical knowledge and use it to guide practice, so as to better meet the needs of work development.

2. Practice is the foundation of continuous progress. I will constantly exercise my courage and courage through practice, improve my ability to solve practical problems, and treat every job positively and enthusiastically.

In a word, this short year is a year of changing my role in life, a year of growing up, a year when I was never familiar with water conservancy and became familiar with it, loved it, and was willing to devote my life to it silently. He will be a qualified water conservancy worker and make due contributions to Changxing's water conservancy.