1, the enclosure on the construction site must be 100% fully enclosed and meet the requirements of beauty, elegance, safety and practicality.
2. The main construction roads on the construction site must be fully hardened at 100%.
3. A complete set of vehicle washing equipment must be installed at the gate of the construction site to ensure that the vehicle is fully washed by 100%.
4. Sandstone and exposed loess (including ground) on the construction site must be completely covered 100%.
5. The site to be built that has been idle for more than 6 months must be 100% green.