Nowadays, people pay more and more attention to contracts, and there are more and more types of contracts. Signing a contract is also one of the best ways to avoid disputes. Then do you know how to write a formal contract? The following is a simplified version of the reservoir contract template (generally 5) I collected for reference only. Let's have a look.

1 reservoir contract simple contract party a:

Party B:

In order to clarify the rights and obligations of Party A and Party B in the construction process, encourage both parties to create conditions for each other, do a good job in cooperation, and ensure the smooth implementation of the project, Party A contracted the reservoir project to Party B for operation, and reached the following agreement through negotiation between Party A and Party B. ..

I. Contents of the contract:

All contents within the scope of the construction drawings and the construction contract, and all obligations of the contractor in the main contract shall be borne by Party B. ..

Second, the way of contracting:

1. This project is implemented by Party B on behalf of Party A, including the coordination and management of the whole project. Party B must ensure the quality, quantity and safety according to the requirements of the main contract, deliver the project on schedule and fulfill the warranty obligations.

2. Party B shall be responsible for all on-site construction of this project ... The construction team shall be set up by Party B and implemented in the name of the project department to which Party A belongs, and shall abide by various management systems related to project management formulated by Party A. ..

3. In the process of construction, Party B must strictly implement the regulations on safety production management of construction projects. In case of safety accident, all responsibilities and losses shall be borne by Party B. ..

4. Party A has the right to check the installation quality, safe production and civilized construction at the construction site from time to time, and has the right to directly punish violations according to management regulations; If Party B is found to pay bribes to inspectors and relevant stakeholders or to seek benefits for Party B, it will be punished twice and Party B's contracting qualification will be cancelled, and the fine will be deducted directly from the project payment.

5. Party B is responsible for the collection and arrangement of all data during the project construction and project completion acceptance, and the re-examination expenses for test and detection shall be borne by Party B, and the original data must be submitted to Party A for filing; The project settlement report shall be provided by Party B to Party A, with relevant supporting documents such as economic visa, and Party A shall apply to the owner for formal settlement accordingly. When checking the final accounts, Party B shall take the initiative to participate and bear the final result. For other losses caused by Party B's negligence in management, such as lost or invalid visas, Party A shall provide legal aid, but all expenses and legal consequences other than the salary of the handling personnel shall be borne by Party B. ..

6. This agreement is based on the main contract signed by Party A and the owner. Matters not covered in this agreement shall be implemented in accordance with the master contract and related documents. Party B shall protect Party A from the compensation for the delay in the construction period caused by the violation of the main contract and any compensation expenses that the contractor will bear under the main contract, otherwise Party A may withdraw the performance bond from any price paid to Party B, which is not enough to make up the compensation difference, and does not rule out the possibility of taking other remedial measures.

7. If Party B delays the construction period for more than 20 days, causing serious quality problems, defaulting on farmers' wages and causing letters and visits, Party A has the right to terminate the agreement, deduct Party B's deposit and take over the project.

Third, the project cost:

The construction drawing budget for all projects in this contract is1000000 yuan, of which 300000 yuan has been paid in the early stage and 600000 yuan is paid this time.

Four. Financial arrangement:

1. Party B operates independently and is the ultimate undertaker of the operating results of this project.

2. All raw and auxiliary materials are purchased in the name of Party A, and invoices are issued to Party A. The expenses shall be borne by Party B and paid by transfer in the name of Party A. ..

3. The fees charged by the administrative department of the government where the project is located, the fees charged by the industrial department, various local fees and the fees that should be borne by Party A during the execution of the main contract involved in this project shall be borne by Party B. ..

5. If Party B encounters difficulties in the performance of the contract, it shall be solved by Party B in principle, and Party A shall try its best to coordinate, but the relevant expenses shall be borne by Party B. ..

Intransitive verbs For matters not covered in this contract, both parties can supplement them through consultation. In case of any dispute, both parties shall settle it through consultation. If negotiation fails, a lawsuit may be brought to the people's court where Party A is located.

7. This Agreement is made in duplicate, one for each party, and shall come into force after being signed and sealed by both parties.

Party A: (signature) Party B: (signature)

Year, month, sun, moon, sun.

Party A of the second edition of the reservoir contract:

Party B:

According to the Contract Law of People's Republic of China (PRC) and other laws and regulations, in order to meet the needs of collective and individual economic development, Party A contracts collectively owned reservoirs to Party B for aquaculture operation. In order to clarify the rights and obligations of both parties, this contract is signed as follows through negotiation:

1. Name of contracted reservoir:, with an area of mu, four to four:;

2. The term of the contract is (in words) years, and the starting and ending dates are from MM DD YY to MM DD YY;

Three. Agreed matters

1. Party B has the right to operate the contract reservoir independently, but shall not change the use of the contract reservoir;

2. During the contracted operation, if the land within the contracted scope is requisitioned by the state or used by the village collective planning, Party B must obey.

3. After the contracted reservoir expires, the attachments on the ground shall be handled by Party B;

4. After the expiration of the contracted operation of the reservoir, if Party A agrees to continue to contract abroad, under the same conditions, Party B has the priority;

5. Party B shall ensure that the surrounding water sources and roads are unblocked during the contracted land operation period;

6. During the operation of the reservoir contracted by Party B, Party A and Party A's villagers' team shall cooperate with Party B to solve the surrounding environmental contradictions and related problems in time.

7. If Party B causes soil erosion or man-made factors damage the functions of reservoir facilities during the contract period, Party B shall be responsible for the consequences (except irresistible natural disasters);

8. Party A and Party A's villagers' group shall safeguard Party B's legitimate business and interests, and support and assist Party B in all work.

9. After Party A puts on record, Party B shall not subcontract or lease the contracted reservoir.

Four. Liability for breach of contract:

After this contract is signed and comes into effect, both parties must strictly abide by the above terms and conditions, and it shall not be changed due to the change of legal representatives of both parties. If one party breaches the contract, it shall undertake to compensate the other party for all economic losses.

Verb (abbreviation of verb) Contract This contract is made in duplicate, which will come into effect after being signed by both parties, and each party and the villagers' committee will hold one copy. Matters not covered in this contract shall be settled by both parties through consultation. As an annex to this contract, it has the same legal effect as this contract.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Contract III of Simple Contract for Reservoir Contracting: (hereinafter referred to as Party A)

Contractor: (hereinafter referred to as Party B)

According to the relevant provisions of the Contract Law of People's Republic of China (PRC), in order to make full use of reservoir resources to develop fish farming, strengthen reservoir water conservancy management and improve economic benefits, it is agreed that Party A will contract out the Da 'ao Reservoir (agricultural land, commercial and residential land and industrial land) located on the west side of Bijiashan to Party B to engage in fish farming production and operation. In order to clarify the rights and obligations of both parties, the following contents of the contract are hereby concluded for both parties to abide by:

I. Location and area of the contract reservoir:

1. The reservoir is located in Daao on the west side of Bijiashan.

2. Its area is mu measured on the spot, and the dam bank of the reservoir is newly built, with good quality.

Second, the contract period:

The term of the contract is years, starting from 20xx 65438+1 October1and ending at 20xx 65438+February 3 1. After the expiration, both parties will discuss whether to renew the contract.

Three. Amount, term and method of contract payment:

1. During the contract period, Party B shall pay RMB one hundred and fifty-five thousand Yuan only, of which RMB Yuan only (mu× yuan/mu year) shall be paid annually.

2. Payment term: the first year's contract payment shall be paid in one lump sum when signing the contract, and the subsequent years' contract payment shall be paid in one lump sum before 1 month 1 of the current year, without default.

3. Party B's annual contract payment shall be paid in monetary funds, and Party B shall not settle the accounts by itself, and the electricity fee shall be paid by Party B on schedule.

4. All fishing gear and fishing nets required for Party B's production shall be solved by Party B itself.

5. During the contract period, Party B must pay the contract money in full and on time according to the regulations.

6. During the contract period, Party B must do a good job in environmental protection and anti-theft. If the reservoir is polluted by water or stolen, Party B shall be responsible.

Four. Modification and dissolution of the contract:

1. During the performance of the contract, in case of special circumstances, both parties really need to make some changes to the contract, and only after both parties reach an agreement through consultation can they make some changes to the contract.

2. In case the water resources in the reservoir area are exhausted or the water quality is polluted, and it is impossible to engage in aquaculture, both parties can negotiate to reduce or terminate the contract according to the facts.

Verb (abbreviation of verb) Related matters agreed by both parties:

1. During the performance of this contract, in case of national construction expropriation, this contract will naturally terminate, and the land expropriation fee shall be enjoyed by Party A, and the compensation fee for reservoir fry and reservoir appendages shall be enjoyed by Party B. ..

2. During the contract period, Party A shall be responsible for coordinating with the mountain contractors and the competent forestry authorities when Party B implements the mountain construction involved in tourism, vacation and leisure in the reservoir area, and the expenses shall be borne by Party B. ..

3. When fishing in the reservoir area, Party B can only use nets and shall not drain the water resources in the reservoir area.

4. Party A's existing bottom fishing in the reservoir belongs to Party B free of charge. If both parties do not renew the contract after the expiration of the contract, Party B shall clean up the bottom fishing of the reservoir and return it to Party A within one month after the expiration of the contract. However, when Party B cleans up the bottom fishing, it can only take the way of fishing, and it is not allowed to drain all the water in the reservoir area to prevent water resources from being exhausted.

The way of intransitive verbs to solve disputes;

During the performance of this contract, any dispute between the two parties shall be settled through negotiation. If negotiation fails, it shall be settled through litigation in Huashan District People's Court.

Seven. Supplementary terms:

1. The contents stipulated in this contract are the true meaning of both parties. If there are any matters not covered, both parties can make supplementary provisions after consultation, which have the same effect as this contract.

2. This contract shall come into effect on June 1 day of 20xx after being signed and sealed by both parties.

3. This contract is made in duplicate, with each party holding one copy.

Unit of Party A: (official seal) Contractor of Party B: (signature and seal)

Legal representative: (signature and seal)

Signature time:

Signing place:

Oil Reservoir Contract Simplified Version 4 Party A: (hereinafter referred to as Party A)

Party B: (hereinafter referred to as Party B)

After research, Party A decided to contract out Qingtang Reservoir located in Qingtangwu to Party B to contract aquatic products, and hereby concluded the following contract:

1. The contract term of Party B is 10 year, from xxx year 1 month 1 day to 20xx February 3 1 day.

2. The contract rent is 6,000 yuan per year, totaling 60,000 yuan, to be paid in two installments (xxx years 1 month 1 40,000 yuan, xxx years 1 month/20,000 yuan).

Three. During the breeding period, Party B mainly focuses on ecological breeding, supplemented by feed breeding. It is forbidden to put human, livestock, poultry and other animal droppings and related biochemical heavy metal ripening promoters, which is beneficial to environmental protection and water quality ecology and ensures that the villagers' life and agricultural irrigation water quality of Party A meet the national standards. If Party B breaches the contract, Party A may unilaterally terminate the contract without returning the rent.

Four. During the contract period, Party B shall ensure that Party A's production and domestic water is the main one, supplemented by aquaculture.

Five, the reservoir in the dry year, after maintaining the original eight plug water level supply bantian irrigation, Nanban farmland irrigation water pump.

6. During the flood season of the reservoir, Party B shall unconditionally guarantee the flood discharge barrier-free, unconditionally carry out the flood dispatching orders of the superior, strengthen the inspection during the flood season, report the operation of the reservoir in time, and ensure the safety of the reservoir during the flood season.

7. Party B shall be responsible for all expenses for cleaning the dam surface and spillway of the reservoir.

VIII. If the reservoir facilities are damaged or leaked by man, Party B shall bear the legal and economic responsibilities caused thereby.

9. If all facilities such as the irrigation outlet culvert of the reservoir dam need dry storage maintenance, Party B must unconditionally release water to dry storage for maintenance.

X. During the contract period (ten years), Party B shall not transfer, lease or subcontract to others, otherwise Party A may unilaterally terminate the contract and the rent will not be refunded.

1 1. If the government needs people's livelihood projects such as drinking water and water storage, Party B must unconditionally stop the contracted breeding period, terminate the contract, and return the unpaid years to Party B according to the annual rent.

12. Matters not covered in this contract shall be discussed separately by both parties.

Thirteen. The above contract shall be signed by both parties.

Signature of Party A:

Signature of Party B:

_ _ _ _ _ _ _ _ _ _ _ _ _

Simple Contract for Reservoir 5 Party A: Zhuangquan Villagers Group, Yangquan Town, Changning City

Party B: Chen Wenjun.

In order to make full use of water resources, develop fishery breeding industry, better manage and develop water conservancy projects, and clarify the rights and obligations of both parties, Party A and Party B have reached the following agreement through joint consultation.

Article 1 Contract Location and Area

Party A will contract to Party B for operation and management.

Party B has the right to use the management right and the right to operating income.

Article 2 Term of Contract

The term of the contract is years, from the date of the month to the date of the month. The contract fee is annual.

Article 3 Rights and obligations of both parties

1. During the contract period, Party B shall operate and construct according to market needs within the legal scope; Party A shall safeguard the legitimate rights and interests of Party B and shall not interfere with Party B's right to operate freely.

2. If the superior department has relevant support policies, Party A shall promptly notify Party B and actively assist in handling them.

3. Party A shall educate the surrounding people to protect fishery production. In case of theft, poisoning, fish frying and other acts that infringe on Party B's commercial rights, Party A shall be responsible for handling them.

4. When there is a contradiction between fish farming and agricultural water use, Party A must ensure that the minimum water level used by Party B is not less than 6m.

5. Party A is responsible for the expenses arising from natural disasters such as flood control, dike consolidation, drainage and pumping.

6. If the dam dries up or collapses due to force majeure, after confirmation, Party A will reduce the contracting fee of Party B according to the facts.

7. Party A and Party B shall not change or terminate this contract at will. If the representative of Party A changes, this contract shall not be modified. After the expiration of the contract, if Party B is willing to continue to perform the contract, it has the priority to contract.

8. In order to encourage Party B to actively invest in the construction, Party A promises to renew the contract after Party B invests in the fixed assets (such as houses, farms, roads, land reclamation, etc.) of this project. ) When it expires, it shall be settled in one lump sum at the market evaluation price.

9. This contract enjoys the right of inheritance and transfer within the term.

Article 4 Liability for breach of contract

If either party breaches the contract, it shall pay the other party a penalty of 60,000 yuan.

Article 5 Matters not covered in this contract shall be settled by both parties through consultation.