Go to the local environmental protection department or solid waste management center to handle the transfer and filing of hazardous waste. The contents to be submitted include: hazardous waste transfer record form; Need to submit a hazardous waste disposal contract; Generate the business license of the unit and the information of hazardous waste storage places; Business license and hazardous waste business license of the disposal unit; Business license and road safety permit of the transport unit.
After the filing is completed, the transfer of hazardous wastes shall be carried out in accordance with the transfer form system.
What are the procedures for solid hazardous waste treatment?
Need to go to the local environmental protection department or solid waste management center for hazardous waste transfer and filing. The contents to be submitted include: hazardous waste transfer record form; Need to submit a hazardous waste disposal contract; Generate the business license of the unit and the information of hazardous waste storage places; Business license and hazardous waste business license of the disposal unit; Business license and road safety permit of the transport unit.
After the filing is completed, the transfer of hazardous wastes shall be carried out in accordance with the transfer form system.
How to record the three types of auto repair shops in Henan?
The procedures are as follows:
1. Filing application report (name of repair shop, application for category III business, application time)
2. Copy of the business license of the maintenance operator
3. Copy of legal person ID card and actual operator ID card, contact telephone number and email address.
4 business premises (including production workshops and business reception rooms), parking lots, land use rights and property rights certificates and other related materials (prepare copies).
5. Summary table of technical personnel, as well as academic qualifications, technical titles or professional qualification certificates of relevant personnel (safety officers and quality inspectors should have high school education).
6 maintenance equipment and facilities summary table, maintenance testing equipment and measuring equipment verification certificate and other related materials.
7. Maintenance management system materials (quality management system, safety production management system, vehicle maintenance file management system, personnel training system, equipment management system and parts management system)
8. Environmental protection measures and other relevant materials
9. Sign effective contracts for hazardous waste and solid waste.
10. labor contract
1 1. Working hour price list
12. Franchise agreement, operation standard and management manual of chain operation are required for chain operation and maintenance, and a letter of commitment that the chain operation service outlets meet the corresponding motor vehicle maintenance and operation conditions (chain maintenance enterprises do not need it).
The specific materials must be implemented in accordance with the relevant provisions of the national standard (automobile maintenance and opening conditions) (GB/T 16739).
State subsidy policy for solid waste treatment?
Under the background of supply-side reform, in 2020, the state issued some policies related to solid waste treatment, aiming at standardizing the healthy development of the industry, improving the incentive and supervision mechanism, creating a good environment, optimizing the industrial structure, strengthening technological innovation, supporting and promoting industrial transformation and upgrading, and promoting the high-end, intelligent and green development of the solid waste treatment industry.
serial number
Release time
Name of policies and regulations
main content
1
March 25(th), 2020
Guiding opinions on promoting the healthy and orderly development of sand and gravel industry
Support the comprehensive utilization of waste rock tailings. On the premise of meeting the requirements of safety, ecology and environmental protection, we will encourage and support the comprehensive utilization of sand and gravel resources such as waste rock, slag and tailings to realize "turning waste into treasure". Encourage the use of solid waste resources to make recycled sand and gravel. Encourage the use of solid waste resources such as building demolition garbage to produce sand and gravel alternative materials.
2
April 3(rd), 2020
Notice on Promoting the Construction of New Waste Incineration Power Generation Project in an Orderly Way (Draft for Comment)
The domestic waste incineration power generation (including biogas power generation) project connected to the grid after 65438+20201October 20 is a new project, and the state will continue to support it through the renewable energy development fund in accordance with the principle of fixed income. Before the end of 65438+February every year, summarize and put forward the subsidy demand of new projects to be applied for subsidy funds in the next year in this area and submit it to the National Development and Reform Commission. The relevant projects should be approved or put on record according to the relevant provisions of the state, and incorporated into the three-year rolling plan of the national major project construction library. All units can be connected to the grid to generate electricity during the year.
three
April 29(th), 2020
People's Republic of China (PRC) Law on the Prevention and Control of Environmental Pollution by Solid Waste
The new solid waste law clarifies the prevention and control of environmental pollution by solid waste, strengthens the supervision and management responsibilities of the government and its relevant departments, improves the prevention and control system of environmental pollution by industrial solid waste, domestic waste, hazardous waste, construction waste and agricultural solid waste, improves the guarantee mechanism and strictly enforces legal responsibilities.
four
April 30(th), 2020
Implementation plan for capacity building of centralized medical waste disposal facilities
Strive to realize that large cities and megacities have sufficient emergency response capabilities as soon as possible within 1-2 years; Each prefecture-level city shall build at least 1 centralized medical waste disposal facilities that meet the operational requirements; Each county (city) has established a medical waste collection, transportation and disposal system, which has realized the complete collection and disposal of medical waste at or above the county level, and gradually covered towns, striving for standardized disposal of medical waste in rural areas. Conditional areas should make use of existing hazardous waste incinerators, domestic waste incinerators and cement kilns to make up for the lack of emergency disposal capacity of medical waste.
five
June 4(th), 2020
Measures for the Administration of Environmental Permit for Hazardous Wastes (Revised Draft) (Draft for Comment)
Units engaged in the collection, storage, utilization and disposal of hazardous wastes shall obtain environmental permits for hazardous wastes and other industry permits in accordance with the provisions. This method strengthens the examination and approval of environmental permits for hazardous wastes and the supervision and management of environmental pollution prevention and control in the process of collection, storage, utilization and disposal of hazardous wastes.
six
July 3(rd), 2020
Promotion Plan for Coordinated Transformation of Comprehensive Utilization of Industrial Resources in Beijing, Tianjin and Hebei and Its Surrounding Areas (2020-2022)
By 2022, the annual comprehensive utilization of industrial solid waste in the whole region will reach 800 million tons, the recovery of major renewable resources will reach 65.438+0.5 billion tons, and the total industrial output value will exceed 900 billion yuan, forming 30 characteristic industrial clusters, building 50 industrial innovation centers and cultivating 654.38+0.000 innovative backbone enterprises. The regional coordination mechanism is relatively perfect, basically forming a new pattern of resource recycling industry development with large-scale agglomeration, high green value and high efficiency.
According to the target requirements, the main tasks of 10 are put forward, such as preparing sand and gravel aggregate from industrial solid waste, promoting the coordinated utilization of bulk metallurgical and coal-fired solid waste, expanding the industrial scale of high-value utilization of industrial solid waste, improving the utilization level of scrap metal, promoting the efficient utilization of waste polymer materials, accelerating the recycling of retired power batteries, promoting the development of industrial clusters for comprehensive utilization of resources, promoting the coordinated treatment of municipal waste by production systems, and building a green and prosperous society, so as to lead coordinated development through innovation.
seven
July 2020 18
Detailed rules for the implementation of the management measures for the recycling of scrapped motor vehicles
The state encourages the market-oriented, specialized and intensive development of scrap motor vehicle recycling and dismantling industry, promotes the improvement of scrap motor vehicle recycling system, and improves recycling efficiency and service level. The state implements a qualification recognition system for recycling and dismantling enterprises. Without qualification, no unit or individual may engage in the business of recycling and dismantling scrapped motor vehicles.
eight
July 3, 20201day
Advantages and disadvantages of municipal solid waste classification treatment facilities implementation plan
Urban garbage sorting and treatment facilities are important urban environmental infrastructure. Accelerate the construction of facilities for classified delivery, collection, transportation and treatment of domestic waste, fill the gap in treatment capacity, improve the urban environmental infrastructure, improve the ecological environment, upgrade the modernization of governance capacity, and promote the formation of a classified treatment system for domestic waste that is compatible with economic and social development.
nine
August 27(th), 2020
Technical Specification for Pollution Control of Fly Ash from Domestic Waste Incineration (Trial) (HJ 1 134—2020)
This standard specifies the technical requirements for pollution control in the process of collection, storage, transportation, treatment and disposal of fly ash from municipal solid waste incineration. The purpose is to prevent and control environmental pollution, improve the quality of ecological environment, and standardize and guide the environmental management of domestic waste incineration fly ash.
10
September 2020 1 1
Implementation plan for improving the construction and operation of biomass power generation projects
From 202 1, 1 and 1, all the approved non-start and new batch of biomass power generation projects in the plan are allocated through competition. At the same time, in order to promote biomass power generation projects to give full play to the role of environmental governance and increase the supply of renewable energy, and ensure the scientific and efficient use of subsidy funds, projects under construction should be completed and put into operation within a reasonable period of time. Since 20021,the subsidy funds for projects newly included in the scope of subsidies (including projects that have been connected to the grid in 2020 but not included in the subsidy scale of that year and projects newly connected to the grid since 20021) shall be borne by the central and local governments.
1 1
September 29(th), 2020
Opinions on promoting the healthy development of non-water renewable energy power generation
Non-water renewable energy is an important part of energy supply system and an important content to ensure energy security. Suggestions are put forward: first, improve the current subsidy method; The second is to improve the market allocation of resources and the subsidy mechanism for returning farmland to forests; Third, optimize the subsidy distribution process; Four, strengthen the organization and leadership, in the supplementary notice of the rational use of the project hours, the project subsidy electricity, subsidy standards and strengthen the project verification and other matters to supplement.
12
June 65438+1October 65438+May 2020
Notice on further promoting cleaner production audit in key industries
Strengthen financial guarantee and policy support, in accordance with the requirements of "People's Republic of China (PRC) Cleaner Production Promotion Law", incorporate cleaner production audit funds into the annual fiscal budget at the corresponding level, and give financial and policy support to cleaner production research, demonstration and training, implementation of national key technological transformation projects for cleaner production and technological transformation projects stipulated in voluntary resource conservation and pollutant emission reduction agreements. The cost of cleaner production audit and training of enterprises can be included in the operating costs of enterprises. Enterprises that have reached the leading level of international cleaner production will be given priority support in government green procurement and corporate credit financing, and will be included in the positive list of supervision and law enforcement.
13
65438+20201October 20th
New Energy Automobile Industry Development Plan (202 1—2035).
Promote the development of the full value chain of power batteries. Encourage enterprises to improve the support capacity of key resources such as lithium, nickel, cobalt and platinum. Establish and improve the modular standard system of power batteries, accelerate the breakthrough of key manufacturing equipment, and improve the process level and production efficiency. Improve the recycling system of power battery recycling, cascade utilization and recycling, and encourage * * * to build * * * recycling channels. Establish and improve the management system of power battery transportation, storage, maintenance, safety inspection, scrapping and recycling, and strengthen the supervision of the whole life cycle.
14
202065438+1October 26th
Notice on the reduction of additional subsidy funds for renewable energy electricity price for environmentally illegal waste incineration power generation projects
Waste incineration power generation projects should be included in the scope of subsidy list only after "installation, planting and connection" is completed according to the law and regulations. After the automatic monitoring data of waste incineration power generation project is made public, power grid enterprises can allocate subsidy funds, and reduce the subsidy funds during the period when the automatic monitoring data is not made public. For waste incineration power generation projects that have been included in the subsidy list before June 30, 2020, but have not completed the "installation and tree connection", power grid enterprises should suspend the allocation of subsidy funds first, and then allocate subsidy funds after the power generation enterprises complete the "installation and tree connection" and disclose the automatic monitoring data to the public.
15
165438+20201October 5
National List of Hazardous Wastes (202 1 Edition)
The new catalogue has reduced the category of 12 and added the category of 16 exempted hazardous wastes. At the same time, some waste laws and regulations have changed, which will have a far-reaching impact on the generation, transportation and treatment of hazardous waste.
16
2020 165438+ 10/7
Notice on the announcement of the declaration results of the central subsidy project for biomass power generation in 2020
It is planned that 77 projects in 20 provinces (autonomous regions and municipalities) such as Hebei and Shanxi will be included in the scale of central subsidies for biomass power generation in 2020, and the total amount of subsidies required for projects included in the scope of subsidies will reach/kloc-0.5 billion yuan. Among them, agriculture and forestry biomass power generation project 18, garbage incineration power generation project 46 and biogas power generation project 13.
17
165438+20201October 25th
Announcement on matters related to the total ban on the import of solid waste
From 20211,China will prohibit the import of solid waste in any way, and it is forbidden to dump, pile up and dispose of solid waste abroad. The Ministry of Ecology and Environment no longer approves the issuance of import licenses for solid wastes that can be used as raw materials.
In September, 2020, President Xi Jinping solemnly proposed in the general debate of the 75th UN General Assembly that China should "strive to reach the peak of carbon dioxide emissions by 2030 and achieve carbon neutrality by 2060". From June, 5438 to February, 2020, the Central Economic Work Conference further clarified that "doing a good job in carbon dioxide emission peak and carbon neutrality" is one of the eight key tasks in 20021year.
Do environmental protection companies need to file with the Environmental Protection Bureau?
Need.
Environmental protection enterprises need the following qualifications and materials for filing in the Environmental Protection Bureau
First, carry out environmental assessment of construction projects in advance.
Second, the project started construction according to the principle of "three simultaneities".
1, after the completion of the construction project, the construction unit shall apply to the local environmental protection bureau for environmental protection acceptance of the completion of the construction project.
2. Apply for trial production or direct production. After the trial production of a construction project is completed, an application for trial production shall be submitted to the local environmental protection bureau (environmental monitoring brigade) before it is put into trial production, and an application for environmental protection acceptance of the completion of the construction project shall be submitted to the pollution control department within 3 months from the date of approval of the trial production.
3. For the construction project that does not meet the environmental protection acceptance conditions after 3 months of trial production, the construction unit shall put forward an application for environmental protection extension acceptance of the construction project within 3 months of trial production, explaining the reasons for the extension acceptance and the time for the proposed acceptance. After approval, the construction unit may continue the trial production, and the longest trial production period shall not exceed 1 year.
Three, the acceptance record information includes:
(1) opinions on examination and approval of environmental impact assessment report/form/registration form of construction projects;
(two) the examination opinions of the application for trial production of construction projects;
(3) Application report form or registration card for environmental protection acceptance of construction project completion;
(4) Monitoring Report on Environmental Protection Acceptance of Construction Project Completion (Table);
(five) the application form for the exchange and transfer of solid waste approved by the competent department of environmental protection;
(6) domestic sewage pipe drainage permit;
(7) the environmental protection work report of the construction unit;
(8) The environmental protection management system and management network of the construction unit;
(9) The sewage and rainwater pipeline map of the plant area and the location map of the sewage outlet;
(10) pollution control engineering scheme of this construction project;
(1 1) environmental protection facilities engineering contract of this construction project; (12) Other materials that need to be prepared by the Environmental Protection Bureau.