Current location - Education and Training Encyclopedia - Education and training - Safety measures for power line construction?
Safety measures for power line construction?
The following are the safety measures for power line construction brought by Zhong Da Consulting for your reference.

In order to do a good job in the safety management of the engineering construction site and prevent personal and equipment accidents in the construction process, according to the overall requirements of the safety work of our bureau, this interim provision is formulated: 1. The construction unit shall designate a leader (deputy director) to be responsible for the safety work of the rural power grid reconstruction project, and designate a site facility worker safety officer; The second is to have a strict overall construction safety technical scheme and safety measures, fully foresee all kinds of dangerous points, and have specific preventive measures. The overall plan shall be submitted to the Security Section of the Bureau for the record; Three, the construction team must carry out the necessary safety technical training and examination, qualified before being allowed to work at his post. Operators must have a safety certificate to enter the construction site, otherwise, leaders should be held accountable for any problems. The training examination shall be recorded in detail in the training record of the unit; IV. Sign a safety contract for the laborers employed in this project (one for the unit, one for the employee and one for the family member, and all three parties shall sign it at the same time). I take full responsibility for the accidents caused by the reckless and blind operation of the construction personnel on the site while knowing the violation of laws and regulations. Five, regardless of the high and low voltage equipment construction should strictly implement the "power supply operation ticket" or "the first (second) line working ticket", where there is no ticket work, no ticket operation, accidents should be investigated for responsibility; 6. Have a good pre-shift meeting and post-shift meeting, and have a working meeting every day, both of which are indispensable. If you don't have a meeting after class and don't seriously study and formulate safety technical measures, once you find out, you will be punished in hell regardless of the consequences. During construction, construction personnel should be concerned about construction safety; Seven, during the period of construction, to strengthen vehicle management, put an end to traffic accidents, it is strictly prohibited to mix passenger and cargo or use cars as traction fastening belts and poles; Eight, involving other operating units, the operation ticket must be signed by the operating unit, the work permit must be held by the operating unit, and the construction unit shall not touch any equipment of the operating unit. For this kind of construction, the construction and operation unit shall designate a comrade to be responsible for liaison work, and no substitution shall be made midway (except in extremely special circumstances); Nine, the construction unit should arrange the power outage plan reasonably, which involves the power outage of the lines with differences above the bureau's grasp, and should report the power outage plan to the bureau for overall arrangement in time; Ten, when the construction involves the interests of the masses or conflicts, should be treated calmly, by the unit leaders to negotiate or through the local government to solve, don't make a move or fights, to be properly handled before construction; Eleven, leaders in charge of construction work, must go deep into the construction site every day, strictly check the layout and improvement of on-site safety technical measures, and put an end to barbaric construction; Twelve, every day before start working, the scene lined up to read the working ticket, working ticket director should explain to the staff the site safety measures layout and process requirements, other technical requirements and construction precautions, etc. ; Thirteen, in strict accordance with the bureau's requirements on dangerous point control and standardized operation measures, as well as dangerous points and supplementary control measures for 10KV and 0.4KV line maintenance, orderly operation; 14. In the hands of each person in charge of work, only one "work ticket" is issued every day, and it is forbidden to carry more than one "work ticket" to avoid mistakes. The person in charge of the work must arrange the work for the next day one day in advance; 15. Strictly implement the procedures of power failure, electricity inspection and grounding. When opening the low-voltage switch, hang a sign that someone is prohibited from closing. There should be someone who is responsible for stopping the power transmission, and use qualified safety instruments during operation; Sixteen, site construction personnel must wear safety helmet, safety helmet must be fastened, no safety helmet protection are allowed to enter the construction site; Among them, for foreign employees: 1. Before entering the construction site, the technicians who enter the construction site must undergo at least three days' training and education by the employing unit and be certified by the county bureau before entering the construction site. After entering the construction site, on-site safety training and education shall be conducted by the on-site safety officer and the person in charge. Only after the approval of the director and the safety officer can they participate in the construction, and the relevant safety regulations shall be strictly implemented during the construction, otherwise the problems will be handled according to the reward and punishment regulations. 2. The mechanic who enters the construction site must receive safety training before entering the construction site, and can enter the construction site only after passing the unified examination by the employer. When entering the construction site, the person in charge of the site shall conduct on-site safety education and training, and explain the tasks, requirements and matters needing attention. 3. Hired personnel and on-site management of hired personnel must be carried out in strict accordance with the fifth and sixth items of Article 1, and it is strictly forbidden to operate illegally at will under any circumstances. 4. The age of employees is generally not easy to exceed 50 years old, and the minimum is not less than 18 years old, and those who are in good physical condition and have diseases that hinder their work may not be employed. 5. Employees should obey the command and mobilization of the person in charge of the site and carry out the construction in strict accordance with the requirements of Electrical Safety Work Regulations. 17. When climbing a pole, the pole climber should use the safety belt and must not lose the safety belt protection. It is forbidden to wear safety belts on electric wires. Check all kinds of tools, such as anklets, safety belts and hand ropes, before climbing the pole. , and check the buried depth of poles, corner poles, terminal poles and bifurcated poles. If they feel unsafe, they are not allowed to climb the pole, and reliable safety measures must be taken before climbing the pole. Eighteen, pole operation, transfer items up and down all use ropes, it is forbidden to throw, pole staff to supervise the operation of the staff on the pole, play a guardianship role; Nineteen, it is strictly prohibited to put the old line in the form of sudden thread cutting, and it must be done slowly with ropes;

Twenty, the erection of new line pay-off, should be wired slider, pay-off joint, to strict management, must not be dragged hard, so as not to scratch other equipment or buildings. When tightening the line, there should be unified command and signal, and the crossing should be guarded by designated personnel to avoid scratching. Excessive traction is strictly prohibited when tightening the thread, so as not to cause injury accidents caused by falling rod and broken wire; Twenty-one, the new pole must be arranged as a whole. If a new pole is hoisted with an old pole, the protection distance between the new pole pit and the old pole pit should be at least 50 cm. All kinds of lifting equipment should be thoroughly inspected, including mills, wire ropes, rods, ropes, pulleys and buffers. , unqualified must not be used. Poling should use special tools, should have the specialist command, unified signal, unified password, unified command, to use the angle slider, poling to a certain height should check the stress of each department, put an end to the wild pole; Twenty-two, involving crossing power lines and communication lines, reliable safety measures must be taken before construction. For the same pole frame, the power supply must be cut off, and live working is strictly prohibited; Twenty-three, line construction, to strictly check the line name, pole number and color code, to prevent the wrong pole; Twenty-four, to strengthen the safety management of user-owned power supply in the construction, to prevent casualties caused by reverse power transmission, and to close the lines that are different from the self-owned power supply; Twenty-five, in the construction of high and low voltage capacitor compensation point, must be checked, in the full discharge grounding rear can construction; Twenty-six, low voltage line construction, the zero line must be marked (eye-catching), to prevent 380V voltage into the household, causing unnecessary losses. 27. Before renting a vehicle for construction, the director, safety officer and contractor shall first conduct a comprehensive inspection of the vehicle and driver's condition (driver's license, driving license, insurance and driving experience) and make detailed inspection records. Those who fail the examination shall not be employed, otherwise the responsibility of the appraiser and the employer shall be investigated. Irregular inspection bureau for hiring vehicles. Where: 1. Car owners must strictly check the car condition before leaving the car every day, especially manned vehicles should be checked at any time besides leaving the car once a day, and any problems should be dealt with immediately. 2. It is forbidden to mix passenger and cargo, and manned vehicles should have protective devices. 3. Passengers on dangerous roads and sections should get off and walk. 4. Before the motorcycle for personal use enters the construction site, the safety officer and the person in charge of the vehicle shall conduct a thorough inspection, and check the personal driving license and helmet. If problems are found, it is forbidden to continue to cope with the use, and those who do not listen to dissuasion will be dismissed. 5. When the vehicle is loaded, the driver should explain the safety matters. The driver is reckless, and the driver is responsible for the problem. 6. It is forbidden to drink and drive, speeding and driving without a license. The right to interpret these provisions belongs to xx Rural Power Bureau. In case of any conflict between this article and the superior documents, the latter shall prevail.

For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd