Current location - Education and Training Encyclopedia - Education and training - What does the safety and civilized measures fee specifically include?
What does the safety and civilized measures fee specifically include?
Safety and civilized measures fees include: environmental protection fees, civilized construction measures fees, safety construction fees and temporary facilities fees.

The full names of "safety" and "civilized construction measures" refer to the cost of purchasing and updating construction protective appliances and facilities and improving safe production conditions and working environment in accordance with the current national construction safety, construction site environmental hygiene standards and relevant regulations.

The site adopts a closed enclosure, and the height of the enclosure in the urban area is not less than 2. 5m; Not less than 1 in non-urban areas. 8m; Enclosure materials can be colored, special-shaped steel plates, bricks, concrete blocks and other walls.

Mainly set in the construction area and its densely populated areas and street sections.