Current location - Education and Training Encyclopedia - Education and training - Work summary and plan of coal transport inspector
Work summary and plan of coal transport inspector
Chapter 1: summary of personal coal handling and maintenance work. 20xx years will soon pass. Looking back on my work in the past year, with the support and help of my leaders and colleagues, my thinking, work, study and comprehensive quality have been improved to some extent, and I have successfully completed all the production tasks assigned by my leaders. But at the same time, in the process of work, it also reflects some shortcomings and deficiencies in work, and strives to achieve better results in next year's work. To this end, I will report my work in the past year as follows:

1, main work and lessons learned

The main work has been completed: replacing bucket wheel A, bucket wheel B, C5C belt conveyor, C7 belt conveyor, C9A belt conveyor, C 10A belt conveyor cantilever belt, bucket wheel cover of C bucket wheel, C8B belt conveyor (once or three times in a small area) and bucket wheel cantilever drive drum.

Lesson: In less than a year after the replacement of many belt conveyors, the phenomenon of glue opening and tearing occurred many times in a row, which increased everyone's workload. For this phenomenon, the cause of the problem is carefully analyzed, and it is considered that the knife accidentally injured the next layer of canvas when cutting the joint, which led to the decrease of the tensile capacity of the belt and the rupture of the canvas. C8B belt replacement and C5B reconnection are carried out in strict accordance with "point W" and "point H", and no quality problems have been found yet.

2, the main work experience or lessons

(1) The task of fuel maintenance is heavy, and the site conditions of coal transportation are difficult, so it has strong professional and technical characteristics. Ignorance and blind operation of professional technology will cause mechanical equipment and personal injury. Through several years of production practice, I know the importance of professional knowledge. In order to be better qualified for the job and improve my professional level and working ability, I have studied and passed the intermediate repairman exam according to the actual work needs in recent years. Through study, my professional and technical level has been improved obviously. Every time, I can actively participate in various technical trainings organized by the team. After learning, I can summarize the practice according to the actual work, find out the weak links, and effectively promote the improvement of work ability. There are 18 belt conveyor, two coal crushers and three bucket wheel stacker-reclaimers at the coal conveying site. Only by fully understanding the structure, performance and operation characteristics of all kinds of mechanical equipment, understanding the operation knowledge of all kinds of mechanical equipment, mastering the operation rules of coal conveying operation, and constantly learning, skillfully applying and summing up work experience, can these superficial perceptual knowledge be gradually improved to a deeper stage of rational understanding, and the work can be done better. Some people were transferred from this post because of the strong physical labor intensity and difficult working conditions at the coal transportation site. I think that only by working hard, learning skills and studying hard can we gradually improve working conditions and achieve something in any work.

(2) In view of the fact that there are many exposed transmission parts of the equipment belonging to the coal transportation major, which poses a threat to the personal safety and equipment safety of our major, our major has actively formulated the annual safety target of this major to prevent personal accidents and strictly implement the relevant measures and regulations such as two votes, and made arrangements and implementation. By the end of 20xx, there were no personal accidents and equipment accidents in my major. However, in terms of preventing equipment accidents, three bucket turbines withdrew from standby, which once constituted a work obstacle. My major draws lessons from accidents in time, sums up experience and gives an example.

Third, after careful analysis and summary, corresponding preventive measures have been formulated; Civilized production: due to the poor output of the dust removal fan on site and the quality problem of coal burning, the dust concentration on site is high, and coal running and scattering are serious. Our major is to carry out the transformation of dust removal equipment and the inspection and replacement of sweeper, and strengthen the maintenance and daily cleaning of on-site hygiene.

3. Work plan:

The practice in coal transportation makes me fully realize that only by having a strong sense of responsibility for the work and mastering the necessary professional technology can we do a better job in coal transportation maintenance. In the future, I will continue to strengthen the study of coal transportation professional knowledge, so that I can learn from experienced people all my life and learn from experienced people in my work, further improve my professional technical ability, organize technical training and safety training for my team, let every employee in my team learn professional skills and master professional knowledge, and help the monitor to make our team a "learning team and a safe team". Cultivate a group of qualified professionals who can fight hard and make their own contributions to the safety production of the company and the project department.

Chapter II: Safety Work Summary and Work Plan of Coal Transportation Project Department. In 20xx, our project department realized safe and civilized production throughout the year, and delivered tons of coal and slime to the power plant. No minor injuries or personal accidents or major mechanical and electrical equipment accidents, to achieve stable and good operation of equipment; The main maintenance work includes vulcanization of 2# medium gangue belt, replacement of 3# medium gangue belt, heating maintenance project, etc.

First, the main work:

1. hidden danger rectification: in 20xx, the project department completed 952 hidden danger rectification projects, including 662 environmental sanitation projects, accounting for 69% of the total, 162 equipment hidden danger rectification and technical transformation projects, accounting for 17% of the total, and odd jobs, fire fighting and others accounted for/kloc-0. Hygiene and equipment are still two main aspects. The rectification of hidden dangers is 9 points less than last year because the distribution of mechanical and electrical personnel in the workshop is scientific and reasonable, and the main work, daily maintenance and secondary work are all assigned to different groups, which greatly improves the efficiency. At the same time, the inspection of equipment has been fully done, and many hidden dangers and problems can be found in time and effectively rectified.

2. Work against "Three Violations": In 20xx, our project department investigated and reported 54 cases of "Three Violations", self-examined 16 internal handlers of "Three Violations", and submitted monthly abnormal reports 12 to the safety committee. All violations were punished and educated, and habitual violations and phenomena still accounted for.

3. Safety study, safety training and work ticket management: The technicians of the project department make full use of the time of pre-shift meeting and safety regular meeting to lead employees to learn the documents and related systems of Wanneng and Zhongli power plants and pre-selected plants in time. In 20xx, the project department * * * organized 26 safety skills trainings, with 552 trainees and 286 training hours, of which 248 were trained by Xinyu Company. Practice has proved that effective training can effectively improve employees' safety awareness and skills. The project department strictly implemented the "two tickets" management regulations and conducted two trainings, which greatly reduced the problems and mistakes in the ticket handling process.

4. Fire fighting and comprehensive management: In 20xx, there was no fire accident in our project department, and 86 fire extinguishers were replaced, 46 in fire extinguisher box, 24 fire hoses were modified, 22 fire box glasses were installed, and 6 fire box frames were maintained 16, which was too long for effective supervision.

Second, the work plan:

1. Seriously sum up and sort out all kinds of problems left over from 20xx, come up with solutions, identify the responsible person, and coordinate and solve them in the first quarter of 20 14, and strive to solve all kinds of safety problems left over from last year.

2. Carry out the 20 14 symposium on safety and democracy, exchange views and understandings on important safety documents, unify thoughts, define the tasks of safety production throughout the year, summarize opinions and opinions of all parties, and actively coordinate and implement them.

3. Strengthen the management and rectification of habitual "three violations" phenomena and behaviors, and set up special rectification teams and projects.

The department manager is the team leader, and relevant measures and methods are introduced.

4. Improving employees' working environment and reducing employees' labor intensity is one of the important tasks of the project department in 20 14, especially the dust reduction and small leather renovation.

5. Do a good job in stabilizing employees' minds, and dynamically and effectively solve employees' problems and suggestions, especially the related work of company personnel with a large proportion.

6.20 14, the work center is still "to ensure uninterrupted coal transportation to the power plant, and the operation of power plant units will not be affected by fuel problems", and strive to make production organization arrangements under the premise of safety, and actively coordinate and complete the related work and tasks arranged by the power plant and the temporary plant.

Chapter III: Coal Transportation Work Summary and Work Plan 20xx is about to pass. Looking back on my work in the past year, I have grown a lot and learned a lot of valuable experience.

Before the team was established, I was seconded to ministry of materials and equipment to help recycle spare parts, and I didn't forget to learn professional knowledge when I was working in ministry of materials and equipment. After returning to the Ministry, under the guidance of He Gong, I systematically studied team management and benefited a lot. After the establishment of the team, I led all members of the team to overcome difficulties such as tight shifts and many equipment defects, and successfully completed various production tasks assigned by the factory department. At the same time, it also reflects some shortcomings and inadequacies in the work, and strives to achieve better results in next year's work. Therefore, I will make the following report on the work of the group after its establishment:

1, safety and civilized production:

As the team is newly established, I have conducted a team-level safety education and examination for everyone in the team, and organized the team to learn the dangerous points and pre-control measures of 20xx coal transportation and the safety documents issued by the superior. Conduct safety activities three times a month to learn the safety regulations and precautions of coal transportation. Up to 20xx165438+1October 23rd, there was no personal injury or equipment misoperation accident in our team. However, in the operation monitoring, a burning accident of rough broken bearing bush occurred. Although the accident was mainly caused by equipment installation, it also reflected that my work was not in place. After the accident, our class learned the lessons of the accident in time and carefully studied and analyzed it to avoid similar accidents. In terms of civilized production, our class cleans up the accumulated coal, spilled coal and stuck coal after each coal loading, and completes the sanitary cleaning work of the common area (primary crushing, secondary crushing, fourth section and coal-water room) according to the requirements of the Ministry. During cleaning, it was found that the first-level crushing and the second-level crushing ground were uneven and the water accumulated seriously. I hope the Ministry can coordinate the construction party to level the site.

2. Specialized technical training

Strictly implement this year's training plan and conduct technical training for team members. Technical training is divided into the combination of field practice and theory. So far, all the equipment except the bucket wheel has been trained. The bucket wheel training is arranged in June 5438+February, with 2-4 class hours of technical theory lectures, 4-6 class hours of on-site practical lectures, and 2 technical examinations per month, with a passing rate of 90%. Each class 1 technical question and answer, 1 operational analysis. Every night, the accident is expected to be studied once, and the new program-controlled Yang Yang will be trained comprehensively and systematically. Through training, Yang Yang won the second place in this quarter's exam, and is currently systematically training newcomer Jun Chen.

3. Team management and daily work

This year, our class actively completed the tasks assigned by the superior, successfully completed every coal loading, and there was no empty warehouse due to manpower and equipment reasons. All the tasks temporarily arranged by the Ministry have also been completed, including painting and spraying of 2 to 3 belts, thick and thin parts and other equipment; Daily recycled scrap iron is discharged from the warehouse, the loading area is cleaned up, the equipment is tracked experimentally, the coal accumulated in the 25m layer of the boiler is cleaned up, the windows are sealed with adhesive tape, the boiler mouth is cleaned up and the coal is opened, the sludge in the pump pit at the end of the third section and the drainage ditch at the end of the fourth section is cleaned up, and 8 quilts are made for the coal unloading ditch.

In terms of management, I have learned a lot of experience through the help of leaders and old squad leaders. Now, I have improved the team's information and management system, strictly implemented the handover system, and made patrol inspection on duty. In operation, 67 defects were found in equipment inspection, and 36 items were handled and accepted.

4. Save energy and reduce consumption.

Conduct energy saving and consumption reduction analysis once a month. Now mainly analyze and learn about the saving of water and electricity. The production workshop does not turn on the light during the day, and the light goes out when people leave at night. We also try to save water when cleaning all sanitary facilities. When cleaning the pump pit, the cleaned slime will also be sent back to the coal yard.

5. Working face

(1), Safety: Strengthen the safety training of team members, on the basis of safe production, seriously carry out the safety activities and work required by the factory and departments, and do a good job in the safety training and retraining of personnel to ensure that accidents such as personal injury and equipment do not occur throughout the year.

(2) Technology: Make a 20 12 training plan, strengthen the technical training of employees, improve the practical operation ability, and prevent major equipment damage accidents caused by misoperation.

(3) Earnestly implement the rules and regulations issued by the Ministry, complete the tasks of unloading, storing and loading coal in time, and ensure the coal consumption of the boiler.

(4) Stabilize the team of shift workers, let employees transport coal with peace of mind, keep abreast of the living conditions and difficulties of employees and give help.

(5) Complete the temporary tasks assigned by the factory and the Ministry in time.

20xx is coming. During this year, I learned a lot of knowledge and experience, and successfully completed all the work. At work, I also summed up my own shortcomings, including management methods and working methods. In my future work, I will seriously correct my shortcomings, learn lessons, strive to complete all the work better and strive for Excellence.

Chapter IV: Summary of coal conveying work in June Looking back on the work in the past month, all the staff in the coal conveying system actively cooperated to complete the production tasks assigned by Party A, and the new employees have been qualified for the coal conveying system posts and successfully completed the production tasks assigned by the factory department. But it also reflects some minor flaws in the work. The coal transportation department will strive for another breakthrough in next month's work while maintaining the existing working conditions. Therefore, I will report my work in June as follows:

1, safety and civilized production:

(1), in view of the fact that there are many exposed transmission parts in the equipment belonging to our system, which threaten the personal safety of the staff and equipment safety of our system, our system has formulated professional measures and regulations to prevent personal accidents and equipment misoperation in time, and arranged for their implementation. During this period, the safety engineers of our company conducted unified and serious training and study on the safety production of coal conveying belts. By the end of June, there was no personal injury accident in our system. Because the dust removal effect of on-site dust collector has been obviously improved in the transformation last month, but because of the low moisture content in coal, our system needs to further improve the cleaning, maintenance and improvement of dust removal equipment, hoping to fundamentally solve the difficulties in on-site health maintenance and daily cleaning.

2. Maintenance, modification and improvement of equipment:

(1), in view of the fact that the coal conveying belt discharge port has been used for a long time, and most of the discharge ports have been worn through, our system sends someone to carefully check the coal leakage point, contact the transportation department in time, actively cooperate with the transportation maintenance personnel to maintain the coal conveying belt discharge port, and ensure the normal work of the coal conveying system with good quality and quantity. Our system has been on the right track, checking the reducers, rollers and subcontractors of all equipment, and the work is going very smoothly.

(2) Actively respond to the tasks assigned by the factory department. Safe transportation 1 13 134 tons of coal.

3. Personnel training:

Through technical lectures and on-site practical operation, the coal conveying system makes the operators familiar with the equipment system and operation performance, and master the basic skills such as equipment operation and accident handling. Make full use of study time, guide study on the spot, conduct monthly examination for all employees, integrate theory with practice, arrange examination questions, make training plans in time, and urge all employees to study actively. Complete 1 technical lectures and examinations, 3 on-site trainings and 2 safety education in the whole month.

4. Problems existing in coal conveying system:

Coal conveying equipment has been used for more than two years, and some parts of the equipment are aging or damaged normally during use, so operators need to be vigilant at all times.

5, production management:

(1) Stabilize the workforce, so that employees can safely transport coal. (2) Can create a good working environment for employees. Further improve the rules and regulations, strictly implement the rules and regulations, and put safety management and safety supervision at the top of all work.

Work plan for July:

(1) Strengthen employee safety education to ensure personal safety of equipment. On the basis of safety production in June, we will conscientiously implement various safety production activities and production tasks assigned by the factory department and the safety and environmental protection department. (2) Strengthen staff technical training, improve practical operation ability, and resolutely put an end to major equipment damage accidents caused by misoperation. (3) Improve various management and assessment systems, and continue to do a good job in gasification, boiler coal loading and equipment inspection to ensure the safe and stable operation of the unit. (4) Seriously implement the look-up table system, and strive to find hidden dangers in time and handle them in time.

In short, after a month's hard work, I successfully completed all the production tasks assigned by the factory department, summed up the shortcomings in my work, and accumulated a lot of work experience, so as to better complete all the work in the next month.

Chapter 5: Annual Work Summary: 20xx years, coal transportation major, 20 12 years is coming soon. During the time when I joined the company, I actively studied and worked hard, and made some achievements, gained my own gains and feelings, and found some shortcomings and deficiencies. In the new year, I will overcome my weaknesses, maintain my achievements and strive for greater progress.

I. Work completed

1, do a good job of spot check on the production site. The fuel coal transportation site is under intense construction, and all the work is carried out in an orderly manner as planned. In order to adapt to the spot check as soon as possible, I carefully studied the spot check requirements, went deep into the production site, actively studied the design intent, understood the design concept, experienced the design method, and based on my own practical experience, studied and analyzed the shortcomings and deficiencies in design and construction, and put forward my own solutions. * * * Put forward 18 field defects and five suggestions for improvement, of which eight have been implemented, seven have not been completed, and the remaining eight are under negotiation. Among them, the suggestion of hanging the liner of coal conveying drum was praised by the leaders. Through these works, I also summed up my own set of working ideas, which laid the foundation for further coal inspection in the future. Of course, there are also some shortcomings and defects, which need to be constantly improved in the future work, constantly studied and summarized, and constantly tested in practice.

2. Do a good job of data collection. As an inspector, one of the most important tasks is to collect and sort out data to ensure that every parameter and change of equipment is recorded. At present, the installation equipment instructions and related materials of related brother manufacturers have been collected, and the maintenance procedures and accounting of coal conveying equipment have been compiled.

3, cooperate with the engineering department to do a good job in site construction management. Our factory is under construction.

In the final stage, all the construction work has not been completed. In order to improve the technical level and management ability in an all-round way, we should actively go deep into the site and participate in the construction management of production. Go to the site for inspection every week, and report any problems in time. Cooperate with the Engineering Department, ministry of materials and equipment and the construction unit to do a good job in the inspection and acceptance of new equipment. In view of the belt vulcanization work in the construction site, active guidance, effective supervision and real-time control are carried out to ensure the personal and equipment safety, construction quality and construction period of the construction site.

4. Do a good job in study, training and examination. From a maintenance worker to a professional tallyman, you need to learn a lot, change a lot of ideas, and master a lot of new methods, new knowledge and new skills. In order to play the role of tally clerk as soon as possible, we should study deeply in our spare time, seize the opportunity of unit training and improve ourselves in an all-round way. Although there is still a long way to go to be a qualified tallyman, it will gradually become smaller as time goes by. Training has always been an important task for enterprises. On the one hand, actively participate in the training organized by the unit, broaden the knowledge in an all-round way, on the other hand, conscientiously complete the training assigned by the leaders. Due to the need of work, I am responsible for the training of CAD in the equipment department. In CAD training, two classes are taught openly. Before and after the training, we actively answer questions raised by comrades and patiently coach learners. Through the training, the expected purpose is achieved. In order to improve and show myself in an all-round way, win glory for the department, I actively and seriously participated in every exam, and now I have participated in two ministerial-level exams and won the third prize.

5. Do a good job in equipment maintenance of heating system in the new district. Equipment maintenance of heating system in new district is an important task undertaken by our equipment department. In order to improve the healthy operation level of heating equipment in an all-round way, we replaced the coal supply belt of the 40-ton boiler, oiled the rotating parts of the coal conveyor and bucket elevator, adjusted the belt tensioning device and deflection adjusting device, replaced the damaged hopper of the bucket elevator, replaced the worn idler of the coal conveyor, and stored the wearing parts, which fundamentally ensured the safe operation of the heating equipment.

6, do a good job in the publicity and reporting of coal transportation. Publicity and reporting is the window of foreign work and an important means to establish a professional image. In order to let the company personnel know about coal transportation and fuel, and show the spirit of the equipment department, the coal transportation personnel reported the main processes and events in production. Among them, the report that the overhaul of the heating and coal conveying system in the new district has been fully completed was published in the seventh issue of the Engineering Briefing.

Second, shortcomings and deficiencies.

Due to the short time in place, insufficient familiarity with the site and role change, some work is not done in place, the quality of work is not very high, and some work is not fully carried out. In the new year, I will correct these problems.

Third, the work plan for the coming year.

1, comprehensively do a good job in coal inspection. Coal inspection is the core of the whole work and the main body of this major. Carry out spot inspection in an all-round way, improve the maintenance quality of coal conveying equipment, ensure the safe and stable operation of coal conveying system, and lay a good foundation for normal production and power generation of units in the coming year. The daily patrol work should develop in a standardized, strict and pragmatic direction, and comprehensively coordinate various relationships to ensure the smooth development of all work.

2, continue to do a good job in the collection and sorting of field data, to ensure that all work is well documented and all changes are recorded. Carefully collect and sort out all kinds of documents, enrich the information base, knowledge base and material base, and effectively guide the production work.

3, continue to do a good job in learning, training and examination, strengthen publicity, improve personal quality and professional ability, improve the overall image of the department. The study and training in the coming year should be more professional, specific and targeted, and can solve practical problems. The contents of publicity reports should be broader, the themes should be more flexible and diverse, and the contributions should be submitted to higher-level publications. The examination level should be improved and the results should be better.

Looking back on the work of 20xx, we have gains and losses, gains and feelings, successes and failures, but we must have a heart of never giving up, and our work, study and life will definitely have a new future. In 20 12, two units in our factory were put into production, and the work was busy. Only by being confident and down-to-earth can we carry out our work in an all-round way. May our tomorrow be even better.