Current location - Education and Training Encyclopedia - Education and training - Key points of year-end summary report of water supply and drainage in 2022
Key points of year-end summary report of water supply and drainage in 2022
Time has passed in a trance, and it's time to end the year's work. The annual summary of the most important positions needs to be considered. The annual work summary can effectively reflect our own work ability and level. Then, you may need to try to write a post! I now recommend the year-end summary report of water supply and drainage to you. Welcome to reading. I hope it helps you.

The year-end summary report of water supply and drainage (the first 1) Time flies and the years are in a hurry. Xx, who shouted "I want money right away", has left in a hurry, and the mysterious xx has quietly arrived. Looking back, Mu Ran was filled with emotion. At the beginning of the new year, while looking forward to the future with head held high, it is necessary to review the work of the past year and sum up the past experience and lessons, so as to make by going up one flight of stairs in the new year.

In my eyes, the design room is also a battlefield without smoke. It can temper people's will and purify people's hearts. At the same time, professional quality can be improved rapidly, and people's minds can also mature rapidly. All this embodies the famous decision-making and correct guidance of every leader and the support and assistance of colleagues.

In a blink of an eye, I have been engaged in design work for more than two years. At the beginning of the second year, I accepted the appointment of my technical staff by the company leaders with trepidation. First of all, thank you very much for your support, trust and recognition. As a fledgling designer, this is a great encouragement to me and my confidence has doubled. As a member of the technical department, I shoulder the responsibility of supervising and ensuring that all the design tasks of the hospital are completed on time and with good quality, and shoulder the heavy responsibility of professional and technical assessment for every designer. After many twists and turns at first, I felt that I was incompetent. Thanks to the encouragement and support of the leaders, I gradually adapted to the working life of Corey and my own design work, and gained a lot from it.

This year, I mainly engaged in the design of municipal water supply and drainage, including water supply and drainage for roads and greening. The main projects completed this year are: a drainage pipe network project; A (South Second Street Agricultural Products Processing Park Drainage Network) construction project; Part of the road construction and supporting projects; A dozen municipal engineering projects such as sewage treatment (pipe network) project in an industrial park. Among them, a drainage pipe network project is constructed by shallow excavation method, and various difficulties and problems continue in the whole design and construction process. With the support and help of leaders and colleagues, the design has come to an end. At the beginning of the project design, the representative of Party A was someone, and the explanation of the design content was very vague. Many problems in the early stage of design can't be solved for the first time, and there are many changes in the later stage. After many exchanges, I gradually mastered the communication method with Party A, and at the same time, inspired by the leaders, I realized that I should be warm and modest to the construction party, and at the same time show my professionalism while fully respecting the leaders of Party A, and always safeguard the dignity and interests of the company. Among them, the design of a road construction and supporting project lasted from April to September, which lasted more than six months. The fundamental reason is that the project itself is complex, involving roads, water supply and drainage, electricity, communications and other professions, and the original pipelines of each road are complex. After the design was completed, Party A proposed two major changes and several minor changes. There are some bad situations that the design can't be completed on time. In view of this situation, it is necessary for leaders to put forward the design power of attorney in time. Through this project, I deeply realized the importance of designing the power of attorney. Since then, I have always kept in mind that Party A must provide the design power of attorney for each design task and carefully record every change to ensure the design quality and complete the design task on time.

In the technical department, I am mainly responsible for the municipal part. I strictly abide by the company's rules and regulations, try my best to complete all the work as a member of the technical department and complete all the tasks assigned by the leaders. Assist the section chief to ensure the design quality in the field of municipal design services in the hospital on weekdays, assist the section chief to complete the technical quality and level assessment of project completers at all levels at the end of each month, and assist the dean and the section chief to complete the technical assessment at the end of each month. The completion of these tasks one by one has increased my communication opportunities with leaders and colleagues, and enabled me to better understand the situation of the hospital and the work of my colleagues, thus improving my ability and knowledge to a certain extent.

This year is a fruitful year. Each task is different in size and length. I try my best to finish every job on time with good quality and quantity. Generally speaking, this year has been tense, busy and full. I have made further progress not only in my major, but also in my interpersonal communication and way of doing things. First of all, I would like to thank the leaders for their support, encouragement and training, and my colleagues for their help.

Looking forward to the new working year, in this unknown xx year, I hope to continue to sharpen my professional skills and abilities. In the future work, I will communicate and discuss more with leaders and colleagues, improve myself to the maximum extent, and strive to live up to the encouragement and training of leaders and the expectations of my parents. In the new year, I will devote myself to my work with great enthusiasm, master the professional knowledge and skills of this position, be familiar with industry norms, memorize professional rules, pay attention to the development trend of the industry, and always maintain a strong sense of innovation. Better understand the job responsibilities and strive to complete the work with high quality and efficiency. The specific objectives to be completed include: ① technical work: assisting the section chief to establish the quality management and assurance system in various design fields in the hospital, assisting the section chief to prepare the technical training plan for employees in the hospital, and organizing the implementation of his own work: completing various design tasks on time and with good quality; Obtain professional title computer and professional title English certificate; And insist on physical exercise.

In short, we always adhere to the principles of being strict with ourselves, loving and dedicated to our posts, obeying rules and disciplines, and sticking to our posts; In a down-to-earth attitude, be honest, not afraid of hardship and fatigue, work hard and complain less; Summarize the past work experience, absorb the essence, analyze the causes of failures and mistakes, actively correct and improve, keep up with the times and the development pace of enterprises, so as to bring greater benefits to the company in the future! Strive to reach a new level in xx's later years and achieve a brilliant record of "triumphant progress"!

Year-end summary report of water supply and drainage (Part II) Since I entered the company on July 10, I have been doing industrial water supply and drainage for almost five months, and I feel more fulfilled every day. Next, I will briefly explain my work in the past six months.

When I first entered the company, I learned about the company's development process and planning, the company's rules and regulations and work points, narrowed the distance with new colleagues in outdoor quality development, and improved team awareness and cooperation ability. After that, the relevant specifications of water supply and drainage design were systematically understood, and the commonly used specifications such as Code for Design of Water Supply and Drainage in Buildings, Code for Fire Protection in Building Design, Code for Design of Fire Extinguisher Configuration in Buildings were studied. In the later concrete design process, the relevant clauses of the specification were inquired through examples, and the content of the specification was better understood. At the same time, I also studied two fire-fighting books, Comprehensive Ability of Fire Safety and Case Analysis of Fire Safety, and got a more comprehensive understanding of fire-fighting safety knowledge and technical measures. In the early stage of design, relying on the guidance of the predecessors of the water supply and drainage team, I drew the indoor water supply and drainage plan and system diagram by imitating the drawings, drew the table of water supply and drainage safety and sanitation equipment, made a ppT demonstration of water supply and drainage-process exchange, and collected and sorted out the replacement and outdated specifications of the water supply and drainage professional atlas. At this stage, I became more familiar with the operation of Tianzheng water supply and drainage software, and also learned some contents of water supply and drainage design. Next, I made a bulletin board for the third quarter of the public works room, which happened to be made by our water supply and drainage team. I use photoshop software to help the whole team. In late September, I participated in the water supply and drainage and fire protection design of practical projects, including the deepening design of water supply and drainage in Junhua Carbon Dioxide Compression Plant, the deepening design of water supply and drainage in Junhua Transformer Plant, and the deepening design of water supply and drainage in the toilet of Tibet gas station. In the design of a specific project, if you encounter unexpected ideas, ask questions if you don't understand them, and finally successfully complete the design drawings. But finishing painting doesn't mean painting well. While I feel that I am making progress bit by bit, I also realize that I still have a lot to master and I can't stop learning. /kloc-in October, under the guidance of colleagues, the previous drawings were revised and improved, and the water supply and drainage drawings of the auxiliary building for coal storage and transportation in Xinjiang Zhongneng were designed and drawn. At the same time, I began to collect and sort out some budget estimates and quotation materials with my colleagues. 1 1 month completed the water supply and drainage and fire protection design of Zhongneng ignition oil pump room, Zhongneng sulfuric acid storage and transportation room and Zhongneng coal conveying substation, and learned the hydraulic calculation method of Huayu Project. At present, I am doing the fire protection arrangement of methanol storage tank and air compressor in boiler room.

In addition to design work, I also actively participated in various activities organized by the company and departments, mainly including my growth keynote speech, football friendly match, fun sports meeting, rationalization proposal, submission of growth magazine, submission of artistic works, opening ceremony of multi-function hall, basketball friendly match and New Year's Day party. The company's colorful activities have enriched the personal life of our newcomers and made us feel the warmth of home. At the same time, in view of my personal interest in computer software and hardware, I temporarily assumed the responsibility of information officer to escort the normal operation of computer equipment, computer software and printers in the department.

At work, I still have many shortcomings that need to be made up as soon as possible. First of all, personal design ability needs to be constantly improved and cannot be relaxed. Just as Dean Liang pointed out the relationship between "ability" and "strength" at the check-in ceremony of the Aerospace Building, the company's moving into the new building is the embodiment of the company's strength, not the improvement of our personal ability, which requires us to further improve the design level and set off the strength displayed by the company. Secondly, we should strengthen the spirit of hard work. In the face of more complicated tasks, I will not be afraid of difficulties, take the initiative to find something to do, be diligent, actively adapt to various environments, hone my will and increase my talents in heavy work.

Water supply and drainage year-end summary report (Chapter III) Leader:

Hello, everyone. I have been working as a professional water supply and drainage engineer in the mechanical and electrical department (concurrently as the mechanical and electrical director of Xinduhui project) since I joined the company on February 2, this year. I have been in a travel company for nearly a year, and through the care of leaders, the help of colleagues and my own efforts, I have basically integrated into the big family of travel companies, and at the same time I have a deep understanding of the company's organizational structure and workflow. Reviewing the work course of this year and summing up the experience and lessons in the work will help to develop strengths and avoid weaknesses in the future work and do a better job in project management. I. Work responsibilities and main work contents for xx years:

1. Drawing review: In practical work, take time to familiarize yourself with drawings and related design instructions, and combine with relevant regulations.

Fan optimizes the drawings in combination with the actual situation and work experience. Participated in the drawing review of Xinduhui, Phoenix Plaza, Seafood City and other projects for many times, and put forward relevant opinions and suggestions. Among them, after learning that the actual water pressure of Xinduhui station is only 0.2Mpa, the water supply mode of apartment in D area was adjusted in time, and non-negative pressure water supply equipment was added to ensure the normal water supply pressure. In addition, the fire hydrant pipeline drawings of Xinduhui underground garage have been adjusted and modified many times without adding bolt boxes, which meets the requirements of fire protection design specifications.

2. Suggestion: According to the actual investment situation of each project, put forward relevant professional opinions on mechanical and electrical equipment and pipelines of each project.

As well as suggestions, for example, the waste water pipes in Xinduhui dining area are all changed into machine-made cast iron pipes, which is beneficial to the influence of catering oil pollution on the pipes and the later cleaning. The sewage pipe in the restaurant bathroom of Seafood City was changed from HDpE pipe to pvc pipe, which not only saved investment but also did not hinder the use. The kitchen area was changed from HDpE pipe to machine-made cast iron pipe, which was beneficial to the later operation and maintenance. The water supply pipe of Phoenix Plaza was changed from the expensive thin-walled copper pipe to the thin-walled stainless steel pipe, which saved about 6,543.8+0 million investment without reducing the service life and grade. 3. Assist the Planning and Design Department: the enlarged drawings and construction drawings of the design institute have not been reviewed and submitted.

Give relevant suggestions and computer room parameters, such as providing technical parameters and drawings of laundry room and swimming pool for Dongsheng Design Institute. In addition, the lighting design scheme and construction drawing design of Xinduhui and Seafood Building participated in the whole process. 4. Preparation and review of technical documents for equipment bidding: As a water supply and drainage engineer of the Ministry of Mechanical and Electrical Engineering,

Xinduhui has no negative pressure equipment, fire water tank production, building lighting, constant-pressure variable-frequency water supply unit, seafood city water storage tank and building lighting, variable-frequency constant-pressure water supply unit, boiler, solar energy, swimming pool equipment, volumetric heat exchanger, fire protection project, and Phoenix Square domestic water tank, and related bid evaluation.

5. Acceptance of incoming materials: check and accept the materials of all construction and supply units to ensure that the products meet the requirements.

Technical requirements. Such as pipe brand, wall thickness and strength.

6. Technical disclosure: In view of the fact that the construction unit has different understandings of technical requirements and the technical quality is not high, it is correct.

Technical disclosure and on-site installation guidance. For example, due to the use of new materials, the construction unit has little installation experience in the bathroom water supply and drainage installation of Shanyuhai model room. After the disclosure of HDpE drainage pipe, the installation still can't meet the technical requirements, and many times on-site explanations and guidance were given, and thin-walled stainless steel pipes for water supply were buried in the wall. , after many times on-site guidance to meet the technical requirements.

7. On-site coordination: During the on-site installation stage of the project, many types of work cross each other and the construction management is complicated, so it is located in Xinduhui.

In the stage of installation and construction, the general contractor shall coordinate with subcontractors such as fire protection, lighting, gas and water supply companies to solve contradictions and eliminate bad relations. Advance the work. For example.

8. Promotion and implementation of design changes: For the changes in the project, give instructions in time, follow up the implementation and avoid them.

Cause more waste. For example, in the construction of outdoor pipe network in Xinduhui, the sewage septic tank was changed from two 40m reinforced concrete septic tanks originally designed to 70m brick septic tanks, and the model was also changed. However, in the subsequent construction, the construction unit was found to have made mistakes, and timely rectification opinions were put forward to the construction unit to avoid construction waste. 9. Coordination and scheduling: As the person in charge of mechanical and electrical projects appointed by the Ministry of Mechanical and Electrical Engineering, you should not only do your own professional work.

Work, but also to do a good job in the coordination and scheduling of various mechanical and electrical professions, play a role in threading the needle.

10, assisting the municipal supporting work: assisting the water and gas supporting work of the seafood city, Xinduhui and Phoenix Plaza projects.

Cooperate with the general department.

Summarizing the work of xx throughout the year, there are achievements and many shortcomings. I feel very honored and passionate to grow up with Kangda Tourism Company! Second, the shortcomings and problems in the work over the past xx years

1, the workflow is not very familiar, which has delayed a lot of work progress;

2. The on-site work progress is not advanced enough, and the technical strength and personnel organization of the construction unit are not mastered enough, which leads to the delay of the project progress.

3, work feedback is not timely enough, and communication with leaders is not timely enough, leading to repetition and passivity. Three, xx years of personal learning gains

In xx years, under the organization of the company and various departments, my project management and professional skills have been greatly improved through training and learning (thanks to the learning platform and training opportunities provided by the Human Resources Department) and the leadership's words and deeds (especially thanks to the selfless help of General Manager Liu and Manager Gao). It can be said that xx is the biggest year in my working career. Here it is, thank you very much! Four, xx years of work and study ideas and plans.

As the manager of the engineering department, I have the responsibility to implement the company's various rules and regulations and complete the operation and management work in construction on time and with good quality. Looking back on the problems existing in the past work and summing up the lessons from the past work, I will try my best to do a good job in the future work from the following points:

1、

Conscientiously implement the spirit of the meeting documents of the group and the company and learn the corporate culture.

Make the overall work plan with the interests of the company as the core. 2, learn and master advanced professional knowledge, and constantly improve the management level:

With the progress of the times and the application of new technologies, it is necessary to update and learn professional technical knowledge. There is no end to learning. It is important to apply theoretical knowledge to work and further improve and sublimate it. On the other hand, we should actively learn from the advanced points of others, foster strengths and avoid weaknesses, further improve our ideological understanding and broaden our horizons. 3, to further improve the management of construction personnel:

In my previous work, although I have made some achievements, there are still many shortcomings that need to be summarized and improved. Only by summing up the past well can we serve the future better. In the project site management, it is mainly the management of people. People are the organizers and executors of management, and they are strictly required to be responsible for the construction of each bid section. Only when all managers and constructors cooperate closely and take their own responsibilities can all aspects of the construction be linked and the overall work be carried out in an orderly manner. V. Suggestions on the Company's work based on this position

As a newly established company, Kangda Tourism Company can get on the right track in a short period of one year. In addition to the correct decision-making guidance of company leaders, it is also inseparable from the hard work of company employees. As a member of the company, I also have some ideas to share with you:

1、2、3、

Advocate scientific management and system management, such as establishing a network office platform to truly realize fast paperless office; Provide a broader learning platform, such as opportunities to study and train abroad;

The responsibilities of departments should be positioned accurately, and the spirit of cooperation between departments and teams should be brought into play to prevent kicking the ball between departments. Put an end to hanging high and fighting alone.

4、

Electromechanical department:

The positioning of the project should be accurate, the preliminary work should be done enough, and the construction waste caused by the "trilateral" project should be avoided as far as possible.