Elevator project summary report 1
_ _ _ _ community is the key construction project of the company for 20 years. After I was approved as the project manager by the company, I immediately started the establishment of the project department. First of all, according to the work requirements of _ _ _ _ _, the personnel are transferred from the company, and the quality management system, project management objectives and post responsibility system for managers are established. The quality goal of _ _ _ community is to create a "community without common quality problems", for which the company has introduced many preventive measures and implementation methods. The work of the past year is summarized as follows.
A, the project quality completion
In order to ensure the realization of the overall goal, I organized the management personnel of the project department to formulate the quality prevention measures of the project department according to their own practical experience and combined with the engineering characteristics. After the project starts, we strictly control the construction quality, starting from the foundation and step by step. Template engineering focuses on the control of structural size and support firmness to ensure the accuracy of design size and visual quality. Reinforcement engineering focuses on controlling the binding quality, especially the spacing and position of reinforcement objects.
In the process of construction, I demand that the contents of the company's preventive measures be resolutely implemented, adhere to the model to guide the way, and organize management personnel to visit and study other projects under construction in the project department, so as to foster strengths and avoid weaknesses and improve the quality awareness of the project department personnel. Concrete engineering focuses on controlling the pouring and curing of concrete. Standard pouring and timely maintenance are the fundamental ways to ensure the quality of concrete. During the whole main construction period, we earnestly implemented it. So far, no concrete cracks have been found. After careful control of the project, the whole main project construction meets the design requirements, and the main quality is good, which has been rewarded by Jinwu Real Estate and achieved the expected quality goal.
Second, the project production and schedule control
_ _ _ After the start of the residential area, I organized the construction progress network plan and labor force plan according to the requirements of the company. According to the requirements of construction progress, we signed quality, progress and safety control agreements with various construction teams. Specific requirements are put forward for its specific progress and production content. In the production process, according to the actual situation, I made a monthly plan and a weekly plan to control and manage the whole project production. At the beginning of the construction, because the project started late, the labor force was insufficient. In this regard, the project department convened personnel in many ways, and through hard work, the construction requirements were basically guaranteed. In the construction process, considering the large amount of concrete pouring, I adopted the method of on-site pouring and using commercial concrete, which improved the construction progress.
After the subcontracting team entered the construction site, according to the requirements of Jinwu Real Estate, the construction deployment was adjusted in time, which created the construction conditions for the subcontracting unit. By 20 19, the whole project has completed the main project, 40% of the external decoration project and 30% of the internal decoration project. Judging from the whole project progress, it is behind the original planned time limit for a project. To this end, I took the time to organize the masonry and backfill construction of the lower room during the backfilling and project shutdown in winter.
Three. Safety and equipment management
In the process of construction preparation, I organized the project department to plan and arrange the construction operation area of the whole site according to the goal of provincial civilized construction site. According to the characteristics of the project, make the equipment demand plan and organize the installation. In the process of construction, I insist on safety management as the focus of daily management, and put the safety of employees in the first place. Frame engineering, supporting system and boundary protection are the key points of safety management. Therefore, I strengthen the safety technical disclosure. Strengthen the safety awareness of employees through three-level safety education when entering the site and special safety disclosure when taking up the post. Strengthen safety inspection and patrol, find problems in time, rectify them in time, and put an end to potential safety hazards. Strengthen the safety protection of buildings. At the same time, all the equipment on site is managed by special personnel.
After the equipment comes into play, the project department will conduct unified inspection and acceptance after it is qualified. In the process of construction, the equipment should be repaired, maintained and inspected regularly, and the potential safety hazards should be repaired and replaced in time. During the whole construction period. No major safety accidents occurred, and the general safety accidents were controlled within 65438 0.5 ‰, which ensured the life safety of employees and achieved the expected safety production target requirements.
In short, in the new year, I will further improve myself, research and improve project management methods, and make contributions to the development of the company.
Elevator project summary report II
Time flies, unconsciously,/kloc-more than 0/2 months slipped away in a hurry. Looking back, there are gains and shortcomings in electromechanical work. Focusing on the policy of safe production, we conscientiously implemented the "Coal Mine Safety Regulations", put people first, keep pace with the times, pay close attention to management, and basically realized the safe, installed, stable, economical and efficient operation of the electromechanical system. Through this past work, we have accumulated a lot of work experience and greatly enriched and improved in all aspects. Now we will make a summary report on the electromechanical work.
First, based on safety laws and regulations, strengthen the standardization of electromechanical safety and quality.
Standardization of safety quality is the fundamental way to improve the level of coal mines and build a long-term mechanism of safety production. Only when the standardization of safety and quality reaches and maintains a certain standard, and the enterprise is in a good state of safe production, can it adapt to and guarantee the life safety of employees and the needs of coal industry modernization. Starting from March, with the worst conditions as a breakthrough, the construction of 22 10 centralized transportation lane, substation in the second mining area, electromechanical equipment in the mining area and cable hanging standards has started, which has promoted the new climax of quality standardization construction in all regions of the mine. Through standard appraisal, * * * was rated as 3 "boutique clubs" and 2 "boutique computer rooms".
Second, the mechanical and electrical work completion
Since 1, the electromechanical department has closely focused on the goal of creating "_ _ _ _ _ _ _ _ _ _" model mine with standardized safety and quality, and the substation in the second mining area has been transformed into a standardized chamber, and the layout of high and low voltage equipment in the substation has been refined. High and low voltage power cables and lighting suspension have been "linearized". A new plastic cable hook (398 1) was replaced, and standard high and low voltage cables and signal cables (597 1.5m) were laid. Underground cables are hung horizontally and vertically in a line. After the transformation, the underground electromechanical chambers, alleys and mining areas have formed a new bright spot project, which has improved the underground standardization level.
2. Due to the limitation of geological conditions, the output of 6.5438+0.8 million tons makes the installation of fully mechanized mining equipment and the transformation of power supply system in coal mining face become the key projects for safe production. Fully mechanized equipment installation, water supply and compressed air system installation and power supply system transformation were successfully completed in five working faces of 22 13, 2200, 210, 1203 and 22 12. And safely and successfully completed the withdrawal of 22 13 working face, 2207 working face, 2209 working face, 2 1 10 working face and 2200 mining working face, realizing the safe production of face by face, face withdrawal and power supply all year round.
3, elaborate organization, successfully completed the transformation of mechanical and electrical equipment:
(1) In order to improve the calorific value of coal quality in our mine and solve the coal sales in our mine, the electromechanical department reformed the under-screen belt of the ground production system, distributed the under-screen belt coal, and redesigned and installed the overhead electric drum belt at the overhead belt to solve the coal quality and promote the coal sales in our mine.
(2) Fan installation project: In May, two mine explosion-proof counter-rotating axial fans, 12 high-voltage power distribution cabinets and two fbcdzno.25/2250 soft-start cabinets were installed according to the technical transformation design requirements, and two high-voltage power supply lines for fans 10kv were set up, which realized the safe operation of the fans.
(3) Installation project of compressed air system: In order to meet the demand of compressed air in underground technical transformation construction, two sa- 132a twin-screw air compressors are temporarily installed at the wellhead of _ _ _ _ _. Compressed air pipeline laying: φ 1594.5 seamless steel pipe is selected as the underground supervisor, φ 1084 seamless steel pipe is selected as the upper and lower pipelines in the mining area, and now the underground supervisor φ 1594.5 seamless steel pipe is laid for 3,965 meters, which meets the compressed air demand of the technical transformation working face and improves the transformation of the compressed air self-help system.
(4) Pipeline installation of water supply and rescue system: _ _ _ _ _ underground fire sprinkler and water renovation, with water supplied by a 600m3 static pressure pool on the ground in _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Φ1594.5 seamless steel pipe is used for the perfect laying of underground water supply and rescue main pipe, and φ 1084 seamless steel pipe is used for mining area and downhill pipeline. At present, the underground main pipe φ 1594.5 seamless steel pipe is laid for 3,550m, and φ 1084 seamless steel pipe is laid for 480m.
(5) Installation project of 35kv substation: The line erection of the ground 35kV substation in _ _ _ _ area has been completed, and its two 35kV power supply lines are led out from Xuangang 1 10kv substation and Fuyang1/0kV substation respectively, and the conductor section is lgj- 185. Except for two SZ10-8000/3535 32.5%/10.5kv 8000kva on-load voltage regulating transformers in the substation, other high-voltage electrical equipment in the substation has been installed.
Three. Completion of transportation work
1, for the purpose of serving the front line, to ensure the continuity of mine production and the completion of production tasks;
The transportation system safely and efficiently completed the transportation of dismantling and installing equipment in five working faces, and transported more than 2,520 sets of large equipment such as hydraulic supports. Over the past year, we have laid 18kg track and 2570m track, as well as 24kg track and 1200m track for the mining area, ensuring the completion of the whole mine production task and the normal operation of mine production.
2. Take standardization as an opportunity to continuously improve the level of safe transportation;
Combined with the requirements of "Provincial Coal Mine Safety and Quality Standardization Standard" and "Energy Saving of Yuanping Power Supply Bureau", led lights 120 lamps were installed and replaced in underground alleys, transportation alleys and working faces, and lighting lines were laid for 3090 meters; In order to ensure the transportation safety of inclined lanes, we completely replaced the original simple turnouts in11alleys and Nanda alleys, and replaced the 2 1 turnouts.
Four, the completion of large equipment maintenance work
The fully mechanized support of ZY4410/23/4223/42 in our mine is the old equipment of the group company, and the support is in poor condition and needs frequent maintenance. Underground maintenance support 6 10. Due to the tight production connection, * * plans to overhaul MGTYZ250/600-1.1d shearer twice; Overhaul ebz 150 roadheader twice; Sm-490a air compressor was repaired for 3 times; 500gfb generator overhaul 1 time, saving maintenance funds about 70 1 ten thousand yuan.
Five, 20____ year mechanical and electrical plan
In 20____ _, the electromechanical installation project will enter a peak stage, and other electromechanical tasks will have a long way to go. I mine _ _ _ _ technical innovation main body installation construction project will enter the final installation stage, such as quantitative loading system installation, coal preparation system installation, gangue discharge system installation, container lane strong belt installation, air compressor installation, overhead passenger device installation, endless rope winch installation, etc. For the existing power supply system of our mine, there will be several major renovation projects this year, such as the installation of transformers in 35kv substations, the installation of _ _ _ _ _ _ _ 10kv overhead lines, the renovation project of original 1 loop 10kV overhead lines in Gaobaowan, the installation of underground substations and mining equipment, underground power supply lines, main ventilators, and so on.
Elevator Project Summary Report 3
20____ is a very important year for the departments directly under the project. Under the care and guidance of the company leaders and the close cooperation of all levels of the company, the departments directly under the project devote themselves to the production line. We strictly remember the instruction and entrustment of company leaders, highlight our own technical advantages and professional expertise, give full play to the core role of directly affiliated departments in engineering construction, and follow the principle of reviewing the past, summing up experience, finding out deficiencies, and then enriching and improving ourselves. Therefore, we review and summarize the working scenes of the departments directly under the project from the following aspects.
I. Personnel management
Personnel management is the core and focus of our work. On the basis of long-term experienced old workers, the management has continued the various systems of 10. Our department has intensified the training of _ _ _ _ structure, introduced various professional jobs, strengthened the team spirit of professional groups, and completed all the construction periods required by Party A on schedule. Compared with last year, this year's engineering specialization has been strengthened and dangerous projects have increased, but our management is more rigorous and strict in terms of safety.
Second, the cost management
At the beginning of last year, we made detailed statistics on various expenditures of costs and expenses, made business analysis on various comparison targets, compared the output value income with the construction costs and expenses on a weekly or monthly basis according to scenarios, timely accounted for the deviation between actual expenditures and plans, analyzed the reasons and corrected them in time. We will continue to adhere to a reasonable work ratio, and if it is more reasonable, we will continue to improve our work in the coming year.
Third, the existing problems and improvement methods
1. Further improve and refine the project quality management system, clarify management procedures, strengthen internal quality inspection, and clarify quality inspection procedures to make project management smoother and more efficient. The internal division of labor and responsibilities have been clarified, and the work order of uploading and releasing, unity and cooperation, standardization and order has been established, which has effectively promoted the smooth development of all work. Satisfy the owners and reassure the company.
2. Strengthen internal skills training, use spare time to conduct professional and technical training for team leaders, improve the overall quality of workers, organize labor professionally, divide operation teams according to different types of work and different construction sites, improve operation proficiency and labor productivity, and ensure construction quality and progress. The labor force chooses workers with high operating skills and good personnel quality. Before the construction team enters the site and during the construction process, the workers are provided with continuous job skills training.
Summary is a mirror. After summing up, we can objectively judge the achievements and lessons, advantages and disadvantages, difficulties and opportunities of the past year, clarify our thinking, make clear our goals, and formulate measures to provide reference and guarantee for the next work. So as to have a clear understanding and profound analysis of difficulties, find solutions to difficulties, have a strong insight into opportunities, and make preparations for seizing opportunities as soon as possible.
Elevator Project Summary Report 4
During my work as the project manager of _ _ _ _ Real Estate Group Co., Ltd., I strictly abide by laws and regulations, abide by the company's rules and regulations, be strict with myself at ordinary times, and be honest and self-disciplined. Dare to take responsibility in the work, have a serious and responsible spirit, have the necessary organization and coordination potential, be able to work with theory and practice, cooperate with comrades, devote themselves to the company, and successfully complete the annual work target. The project management of this year is summarized as follows:
First, the current situation of project organization and management
According to the characteristics of _ _ _ _ project, the project management manual of _ _ _ _ project is compiled: firstly, the project organization management system and the main responsibilities of the project department are defined, the objectives and tasks of project management are determined, and the construction process control points of the four overall objectives of the project (quality, schedule, investment and site) are formulated; Formulate working procedures for project management. With the strong leadership of the group company leaders and the cooperation of related colleagues, the project can be carried out smoothly. Through the monthly meeting of the group company, report the progress of the project construction and the matters that need to be coordinated by the company, listen to the company's next work plan, implement the company's meeting spirit, and timely implement the company's relevant decisions; Through the weekly project meeting, coordinate all the work, solve the contradictions in daily construction, strengthen mutual communication, and timely and effectively control the quality, progress, cost, safety and courtesy of the project.
Second, the current situation of project quality control
In quality management, the project department focuses on three links: establishing quality objectives and determining quality pre-control schemes; Process control of product composition; Acceptance control.
1. Determine the quality pre-control scheme. The company put forward the quality goal of "being a responsible enterprise", and the project department decomposed the target responsibility around this goal. For example, the project leader takes the lead and decomposes the quality responsibility according to the specialty: the civil engineer is responsible for the structural engineering; The hydropower equipment engineer is responsible for the pipeline. Before the project starts, make clear the objectives and acceptance criteria of the supervisor and individual subcontractors. In view of the weak links of supervision and construction units in energy saving, intelligence, prevention and control of common quality defects, this paper puts forward improvement requirements, assists them to improve construction technology and formulate measures. Organize manufacturers of new materials and new processes to give lectures on material characteristics, construction process requirements and quality inspection methods. On-site feedback to Party A, the supervisor and the construction unit to determine the final pre-control plan.
2. Process control of product composition. At present, building products are mainly done by hand, so there will be great deviation in product quality. The process control of product composition is the implementation of all pre-control schemes, which will directly affect whether the quality objectives can be achieved and the project brand and enterprise brand.
3. In product acceptance control, different systems adopt corresponding acceptance methods according to different construction stages. In the main construction stage, the acceptance of main processes is directly related to the structural safety of residential products. And on-site supervision of the process to ensure that the main quality composition process is clear.
Third, the current situation of project schedule control
1, the schedule management in the main construction stage is relatively simple. At present, according to the general construction progress plan, a phased progress plan is formulated, which clearly defines the work data, work sequence, duration and the relationship between work, and puts it into practice. Then, during the implementation of the plan, always check whether the actual progress is carried out as planned. Once the deviation is found, effective measures should be taken to remove obstacles or adjust and modify the original schedule on the basis of analyzing the reasons for the deviation, and then put it into practice. The most important part of schedule control is the construction arrangement, entry time and process crossing after the commencement of various sub-projects and supporting facilities, outdoor greening and landscape engineering. Its ultimate goal is to ensure that the project is delivered on schedule or ahead of schedule.
The residential community project has a large scale, a large volume and a wide range of construction cooperation. How to build this project with high quality, high efficiency, low consumption, schedule, safety and civilization is an important milestone in the company's real estate development. Therefore, the company's people, finances and materials are fully scheduled and operated in strict accordance with the quality and safety system. Careful organization and scientific management ensure the realization of the predetermined goals. The success of this project will lay the foundation for the development of _ _ _ _ Group.
Elevator project summary report 5
Time flies, 20 19 is almost over. During this year, under the guidance of the company's quality policy, the correct guidance of the company and the project leaders, and the close cooperation and unity of various departments, all employees of the engineering department successfully completed all tasks assigned by the company leaders, ensuring the safe operation of all equipment in the park. It has achieved certain good results and contributed to the completion of the company's quality objectives.
I. Daily work
All employees in the engineering department strictly abide by the company's rules and regulations and do it in strict accordance with the requirements of the "Five Regular Laws". Can seriously convey and implement the spirit of the company's instructions and complete various tasks. Take seriously the problems and rectification opinions raised in the inspection of the company and the project, and seriously rectify and implement them in combination with the actual situation. With the help of leaders at all levels, the filling of various forms and records is standardized, which provides an effective and accurate basis for daily work arrangement and electricity consumption data analysis. And put all kinds of systems on the wall, so that every employee can learn, check and demand himself in time.
Second, the power distribution work on duty
The work on duty seems easy, but in fact, it requires the power distribution personnel on duty to have a high sense of responsibility and power distribution duty experience, so as to ensure that hidden dangers are dealt with in time and effectively, ensure the normal operation of the system, and provide power guarantee for equipment operation and owner's office. Therefore, every electrician in the engineering department can observe the power distribution system, carefully check the equipment, copy all kinds of electric meters on time, and carefully calculate the daily electricity consumption, which provides a reliable basis for the analysis and management of electricity consumption in the park. At the same time, the power distribution room is the main department that continues to serve the owner and coordinate with the outside world on rest days, holidays and nights, and is responsible for equipment inspection, the owner's application for repair, various construction follow-up services of the owner and other units, and emergency treatment and coordination during these periods. Such as: Zhongshui Station patrols twice per shift; Daily night street lamps, equipment inspection of water pump room, elevator maintenance tracking supervision, etc. , so that the owner can get all-day uninterrupted maintenance service, ensure the safe operation of electrical equipment and create a good office environment for the owner.
Third, work.
We are responsible for maintaining all electrical equipment and facilities in the park to ensure their normal operation. We have overcome the difficulties of fewer personnel and heavy workload, and rationally arranged personnel in the spirit of "what should be repaired is obligation and what should be repaired is good;" Regular maintenance "principle, take every job seriously. In order to deal with the owner's application for repair in time, a special person is arranged to handle and check the owner's application for repair every day. Be sure to receive the report in time and deal with it in time to reduce the recovery rate. When there is a lot of maintenance work, distribute the support of other employees in time. This summer, in the _ _ _ _ _ company in Building A, the main switch of a distribution box frequently tripped, which seriously affected the normal office of the owner. We promptly organized personnel to conduct in-depth and detailed investigation, and finally found that the reason for the trip was that the owner's electricity consumption was too concentrated, and the three-phase electricity load was seriously unbalanced, which led to single-phase overload trip and required load adjustment. However, since the owner is not allowed to cut off power for a long time during office hours, after measuring and recording the load of each branch at the peak of its power consumption, we redistribute and adjust the load twice at the end of one day and at noon the next day, so that the three-phase load tends to be balanced, eliminating potential safety hazards and improving the safety and reliability of the owner's power consumption.
After the engineering department took over the reclaimed water station in the park without handover and incomplete information, all electricians, including electricians, actively participated in the maintenance, debugging and inspection of the reclaimed water station in order to ensure the normal use of the reclaimed water station and the normal operation of the equipment. Due to the lack of equipment information of Zhongshui station, we can only check the equipment and lines one by one on the spot to understand the working process and control mode of the equipment. Salvage the pump, replace the motor and connect the lines in the sewage tank. All the staff are not afraid of being dirty and tired, overcome all kinds of difficulties and actively assist the hydraulic workers to complete the replacement and maintenance of the equipment in the reclaimed water station. On the issue of electrical debugging, in order not to affect the owner's use of reclaimed water, we try to arrange the time at night or Saturday and Sunday, explore the automatic control and management of reclaimed water pump, and find out the cause of the failure. After many days' efforts, the system has finally been adjusted to the normal state, ensuring the normal use of reclaimed water equipment.
Equipment inspection is an important measure to ensure the safe operation and use of electrical equipment and the safety of personnel. Therefore, every day, special personnel will be arranged to inspect the public electrical equipment and facilities in the park on time, find out the defects and anomalies of the equipment in time and deal with them in time. Can not be handled in time, timely report, take corresponding measures into the maintenance plan. In daily work, employees regularly repair and maintain electrical equipment according to the maintenance plan, maintenance cycle and equipment operation state, so as to find and eliminate potential equipment hidden dangers and reduce equipment failure rate. In the off-season maintenance work, due to the heavy maintenance workload and insufficient personnel, four people were transferred from the power distribution room to participate in the maintenance work, which led to an increase in the workload of the drawn-out personnel and the personnel on duty. But every employee didn't complain, didn't slack off, worked hard, actively devoted himself to the maintenance work, earnestly completed various tasks and filled in various records, so that every off-season maintenance work could be successfully completed.
Fourth, in terms of technical training.
Every employee is very active, communicate with each other, learn from each other, learn from each other's strengths and constantly improve their business knowledge and technical level. In order to ensure that employees have time for technical exchange and study, we set aside 2-3 hours every Friday as "technical study", and encourage everyone to exchange, discuss and ask questions, answer questions in various ways and introduce their work experience. Greatly improved the technical level and self-confidence of employees, and further improved the enthusiasm of employees.
Five, in terms of energy management and reducing consumption.
We conducted a comprehensive survey of public electrical equipment and facilities in the park, found out the methods of saving energy and reducing consumption, formulated energy-saving renovation plans or suggestions for the equipment and facilities that need improvement, and gradually reformed them:
1, which divides the lighting of passages, halls, elevator halls and stairs into day lighting and night lighting; On the premise of ensuring the overall lighting demand and complete and orderly modeling, the number of lamps used should be reduced as much as possible, such as changing three-tube or two-tube lamps into single-tube lighting and changing row lighting into separate lighting.
2, strengthen the inspection of high-power mechanical and electrical equipment, to ensure that the motor is in a good running state, improve efficiency. Increase the maintenance of control equipment, reduce the number of over-stops of high-power equipment and reduce power consumption.
3. Add an electric meter to the air conditioning unit in E building to increase the accuracy of electricity accounting and reduce the allocation of public electricity.
4. Do a good job of repairing the old and recycling the waste, repair the replaced documents, lamps and ballasts, and repair the old parts by replacing parts or reassembling them to reduce the use of new parts.
Six, weak current equipment maintenance work
1. Replace the public telephone exchange in the property management office and readjust the number distribution and wiring.
2. Thoroughly clean and arrange the weak shaft in the building.
3. Cooperate with telecom companies to install, repair and maintain equipment.
Seven, environmental sanitation and equipment hygiene.
The public * * * facilities in the park are divided into public * * * responsibility areas and individual responsibility areas, and each responsibility area has a special person in charge. Clean the sanitation and equipment in public areas every day. Regularly clean and inspect the area under personal jurisdiction to ensure that the equipment in the power distribution room and equipment room is clean, free from oil pollution and dead angle, and ensure the normal operation of the equipment.
Articles related to elevator project work summary report:
★ The latest five excellent model articles of elevator sales work summary in 2020.
★ Work Summary of Elevator Workers in 2020
★ Summary of elevator maintenance work
★ Summary of elevator personal work
★ Annual summary report of project work
★ Model essay on annual work summary of elevator maintenance
★ Personal Work Summary of Elevator Maintenance Personnel 20 19
★ Selected model essays for project work summary
★ Model essay on project management summary report
★ 5 Work Summary Report of Project Manager in 2020