Responsibilities of technical personnel of the owner's engineering department
Responsibilities of technicians in the owner's engineering department (9 general rules)

In the ever-changing modern society, there are more and more places where we can get in touch with job responsibilities, and formulating job responsibilities can reduce illegal acts and accidents. Do you know the format of job responsibilities? The following are the job responsibilities (generally 9 items) of the technicians in the owner's engineering department that I collected for you, for reference only, and I hope it will help you.

The post responsibility of the technical personnel in the owner's engineering department is 1 1, making the engineering maintenance work plan and being responsible for the results of the implementation of the work plan; Visit the project frequently, visit and pay a return visit to the owner, and put the maintenance work before the complaint.

2. Make the training plan for the employees of this department, organize and implement the training, and evaluate the training effect;

3, lead by example, lead the department staff, adhering to the company's service concept, strictly implement the company's rules and regulations. Organize weekly work meetings or special meetings of engineers, arrange and guide the work of subordinates, and create a good working atmosphere. Exchange service skills, solve problems in subordinates' work and improve service level.

4. Check and supervise the maintenance work, point out the unqualified items and follow up the improvement; Handle emergency situations in maintenance work;

5. Organize employees of this department to do a good job in energy conservation;

6. Apply for the materials needed by the department, check the quality of purchased materials, and supervise and inspect the maintenance of the warehouse;

7. Organize manpower and material resources, complete the maintenance requirements put forward by residents in time, and provide fast and high-quality maintenance services for residents;

8. Responsible for organizing and implementing all kinds of community cultural activities and reception activities related to engineering maintenance in the management office;

9. Be responsible for the examination and approval of maintenance materials and the declaration of procurement plan. Responsible for the inspection of important materials and quality records of engineering maintenance work, summarize the quality records of this department on time, and submit them to the reference room for filing before the 3rd of each month;

10, handle the owner's house inspection and vacancy inspection. Patrol and inspect the secondary decoration construction. If any violation of relevant construction regulations is found, it shall be corrected in time and recorded for subsequent treatment.

Responsibilities of technical personnel in the owner's engineering department. Responsible for the control and management of the company's engineering technology, including the organization, implementation and management of the operation, repair and maintenance of various equipment and facilities.

Second, provide paid services to owners and tenants.

Third, supervise and manage the renovation project.

Four, the supervision and management of outsourcing cooperation projects.

V. Propose improvement and rectification plans for property equipment and facilities.

Six, responsible for the periodic verification and daily management of measuring instruments in use.

Seven, to provide engineering technical support for the company to undertake planning new property management projects or new service projects.

Eight, responsible for the management of documents and materials in this department.

Responsibilities of the technical personnel of the owner's engineering department: 3 1. Be familiar with project planning, types and distribution of all kinds of housing structures and public facilities and equipment, master the distribution, trend, location and use of all kinds of pipelines on the ground and underground, and conduct regular inspections to ensure that public facilities are in good condition.

2. Responsible for planning, organizing, inspecting and improving the facilities, equipment maintenance and indoor maintenance of the management office;

3, responsible for the acceptance and handover of residential property, hand over all engineering data;

4, responsible for the determination of engineering maintenance personnel positions and the improvement of job responsibilities.

5, responsible for the development of residential housing and public facilities annual maintenance plan and internal maintenance management;

6, organize the preparation of equipment management, operation and maintenance of various rules and regulations and technical standards, and supervise the implementation;

7, responsible for timely processing all kinds of engineering maintenance information, take various improvement measures, and report to the manager in time;

8. Be responsible for the project construction organization and on-site supervision and management of the residential area reconstruction and expansion project, and handle the project completion acceptance formalities in time;

9. Responsible for supervising the daily inspection and important maintenance of various facilities and equipment within the jurisdiction, participating in the maintenance and construction of major projects, ensuring the maintenance quality and ensuring that all kinds of facilities and equipment in the community are in good working condition;

10, responsible for reviewing the items and standards of household maintenance expenses, handling the owner's maintenance application, cooperating with the customer service center, arranging maintenance personnel to provide services for the owner in time, and reporting to the management center for sorting, statistics and archiving according to the maintenance return visit records.

Responsibilities of technicians in the engineering department of the Owner 4 1. Under the guidance of the leaders of the project department, seriously implement the national guidelines and policies on engineering construction and the technical standards, norms, procedures and construction technology management system issued by superiors. Be fully responsible for all the work of the engineering department.

2. Be familiar with the bidding documents and design drawings, participate in on-site investigation and inspection, put forward suggestions for improving the design, draw detailed drawings and auxiliary drawings required for construction, and make detailed arrangements for the construction project, including necessary supporting plans for manpower, materials and mechanical equipment, as well as various forms of technical preparation such as original construction records and engineering inspection certificates.

3, according to the tasks assigned by the superior and construction organization design, according to the actual situation, formulate the specific construction methods and construction organization measures of this project, and supplement the necessary construction regulations and operating procedures.

4. Lead the survey team to carry out survey in strict accordance with the construction technical specifications, test procedures, survey procedures and design drawings, carefully and correctly carry out the survey of construction lofting, occupation and lease of land, and mark its scope of use on the ground. The construction can only be started after the Minister of Engineering personally checks the control axis and reports it to the chief engineer of the project.

5. Technical disclosure system Before the formal construction of the project, an engineering coordination meeting will be held. Through technical disclosure, the technical personnel involved in the construction will be familiar with and understand the characteristics, technical requirements, engineering difficulties and engineering quality standards of the engineering tasks undertaken by the construction unit, so as to eliminate major quality hidden dangers in advance. Record the technical disclosure of the project, and urge the ZuoYeDui to implement it.

Job responsibilities of technicians in the owner's engineering department 5 1. In addition to understanding the design intent, we must also meet the requirements of design drawings and changes, and implement and meet the reasonable requirements of construction specifications, procedures, process standards, quality evaluation standards and construction units.

2, the whole construction process, including the construction of each division subdivisional work must be technical disclosure, for some special key parts, technical difficulty of concealed engineering, more serious technical disclosure should be carried out.

3. For the types of work and engineering parts prone to quality accidents and industrial accidents, preventive measures for various accidents should be emphasized during technical disclosure.

4. The technical disclosure must be made in written form, and the handwriting of the disclosure content should be clear and complete, with the signatures of the disclosure person and the recipient.

5, technical disclosure must be carried out before the project construction, as the whole project and partial project preparation before construction.

6, often go deep into the site, adhere to the technical work of the whole construction process, check the engineering quality and technical safety measures, check the drawings, verify the quantities, grasp the progress of the project, collect data, keep a diary of the construction, fill in the original records of the construction in time, and ensure that all the information is complete and the visa is perfect.

7. According to the principle of changing the design and the examination and approval authority, all the projects within the construction scope are carefully investigated and studied, and after many comparisons, opinions on the need to modify the design are put forward.

8. Actively participate in technological innovation and correctly adopt new technologies, new materials and new processes at home and abroad.

9. Be responsible for providing the monthly and annual reports of completed quantities for supervision and construction unit visas to the financial department on a regular and timely basis, and providing the budget cost analysis table of completed projects and relevant statistical data.

10, responsible for the completion survey, fill in the project quality inspection and evaluation form according to the measured and completed original records, draw the completion drawing, and participate in the construction technology summary.

1 1, the proper use and storage of surveying and mapping instruments and office equipment need special personnel to ensure normal use. After inspection, they shall be kept by special personnel. Carefully keep the construction charts and all kinds of technical data.

Responsibilities of technicians in the owner's engineering department. Assist the minister to fully complete the management and technical guidance of project preparation.

Second, review and finalize the technical agreement of the responsible electromechanical equipment orders, grasp the manufacturing and processing progress of the ordered equipment, organize the technical acceptance of the arrived equipment, and file and record the technical data of the equipment.

3. Be responsible for the declaration, review and quality and quantity control of spare parts of production line equipment before production.

Four, lead and organize the mechanical and electrical equipment maintenance area to complete the equipment installation and coordinate the construction unit to control the project quality, and be fully responsible for the equipment installation progress, single machine commissioning, linkage commissioning and final acceptance. Responsible for making emergency plans for safety precautions during the operation of the main equipment of the production line.

Five, formulate production line debugging procedures, equipment maintenance safety technical operation procedures and various equipment management rules and regulations, establish equipment files, and establish the organizational structure and operation mode of equipment management in the whole plant.

6. Be responsible for the job skills training and safety production training of equipment maintenance personnel, and cooperate with all departments of the company to do a good job in the management of employees in this department.

Seven, the factory equipment safety, site safety in the process of employees' work is responsible for leadership and management.

Eight, responsible for the safe use of factories, pipe networks, energy media and other buildings.

Nine, complete other tasks assigned by the company leaders.

Job responsibilities of technical personnel in the owner's engineering department 7 1. Responsible for team building and skill improvement in engineering department.

2, responsible for engineering technology, quality management, participate in the preparation of project quality schedule and specific implementation arrangements.

3. Be responsible for organizing the company's engineering construction management and controlling the project progress, quality, cost and safety.

4. Implement the post responsibility system and work standards of the department, and strengthen cooperation with relevant departments such as R&D, sales, operation and maintenance.

5. Participate in the overall design and construction scheme of the project construction organization, and prepare special safety technical disclosure.

6. Be responsible for providing technical support (on-site investigation, technical scheme, technology transfer and bidding) with sales staff.

7. On-site management and coordination of project start-up, process implementation, completion commissioning and acceptance. , control project risks, coordinate and solve difficulties in project implementation in time;

8. Understand and track the technical trends of the data center in time, compare and be familiar with the products of various manufacturers at present, and seek solutions.

The duty of the technician of the owner's engineering department is 8 1, who is responsible for answering the telephone calls of the engineering department office and related daily work, and receiving and arranging visitors for the manager.

2. Responsible for the circulation, recycling and preservation of internal documents, notices and materials of the Engineering Department.

3, assist the engineering manager to do a good job of equipment operation scheduling.

4. Assist the project manager to sort out and print various reports and documents.

5, according to the department's relevant data management operation specification, complete the daily data collection, sorting, establish and improve the engineering and technical files;

6. Responsible for the delivery, handover and filing of documents, drawings and meeting minutes within the specified time, and timely complete the classification, sorting, summary and storage of relevant technical data;

7. Assist and supervise professional engineers to properly keep the construction drawings, engineering contact sheets and other materials in the professional field;

8. Assist the department manager to urge all professional engineers to submit project progress plans (including quarterly, monthly and weekly plans, etc.). ) and summary, report to the relevant departments within the time limit required by the company;

9. Responsible for the specific administrative work of the department, such as the supervision and statistics of employee attendance, the purchase, acquisition and distribution of office supplies, etc. , and contact the company's administrative department in time;

Responsibilities 9 (1) of the technical personnel of the owner's engineering department shall organize and implement the project construction as planned; Overall management and process supervision of project construction; Ensure that the objectives and tasks of the project plan are completed according to the schedule, quality assurance and cost control;

(2) Quality control, cost control, schedule control and target management of the project; Responsible for the overall control, management and supervision of the project duration, project quality, construction safety, coordination of all parties and project cost;

(three) to participate in the discussion and approval of the blue prints.the design, project construction organization design and major construction schemes; Participate in and review the selection of main materials and equipment, review major design and engineering construction contracts, review and check major technical problems in project design scheme and engineering construction, and put forward reasonable suggestions;

(four) to deal with and solve the technical problems in design, construction, quality and acceptance, and put forward suggestions and measures to reduce the project cost and cost;

(five) to participate in the investigation and handling of major quality accidents and major safety accidents, and to review the accident rectification plan prepared by the construction unit;

(six) to organize the acceptance and audit of important subdivisional works, concealed works, model houses and structural tests, and to participate in the solution of major construction technical problems;

(VII) Organize personnel to review the completion data, participate in the preliminary inspection of the company's projects and individual projects, and organize the completion acceptance;

(eight) responsible for drafting contracts related to the project; Cooperate with all departments of the company to do a good job in project bidding;

(nine) to be responsible for coordinating the business relationship between the parties to the project construction, and to be responsible for coordinating and handling the major problems on the spot;

(X) Participate in the development plan of the company's real estate projects, and assist the cost and procurement management department and the finance department in the project cost control and sales coordination;

(eleven) to complete other tasks assigned by the company and the leadership.

;