1. Cabinet production process
1, the base of the cement cabinet (the height of the cabinet is generally around 780, and the base 150+ cabinet 600+ countertop 50 = 800).
2, 800800 vitrified brick, cut tiles according to size.
3. Put a piece of wood in the aluminum alloy, so that the screws on it will be firm, and put a screw in the middle of the aluminum alloy, so that the aluminum alloy strips can be connected with cement.
4. Glue aluminum alloy and ceramic tile (vitrified brick) together with marble glue.
5. Cut ceramic tiles (vitrified tiles) and drill holes in water with a glass drill. When drilling, just keep watering, one hole per minute.
6. Invert the tiles (vitrified tiles) on the platform, and invert the desktop tiles (vitrified tiles) to complete the bottom fabrication.
7. The bottom is ready, and now the riser is ready.
8. After the riser is completed, make a countertop, put tiles in turn, make a steel mesh on it, and smooth it with cement. Marble can be placed on the countertop or tiled.
2. Video recommendation for cabinet production
There are many cabinets making videos on the Internet, and Bian Xiao mainly recommends Baidu-related making videos here.
Let's call it a day!