Inadvertently, an unforgettable activity ended, and we must have accumulated a lot of feelings. How can the most critical activity summary fall behind at this time? So how do we write a summary of the activities? The following is a summary (generally 5 articles) of the activities of safety production month in construction industry. Welcome to read, I hope you will like it.
Summary of Work Safety Month in Construction Industry 1 According to the requirements of the document Notice of the Office of the Safety Committee of the Ministry of Transport on Quickly Carrying out Work Safety Self-inspection, in order to continuously strengthen the safety management of our project department, the Safety and Quality Department of our project department recently conducted a comprehensive inspection of work safety under the leadership of Manager Li Xibing, the safety director of the project department. The safety inspection is summarized as follows:
I. Work objectives
Through comprehensive and in-depth inspection, the weak links in the safety production process of our project department were found, and the links that were easy to appear repeatedly in the construction process and ignored by on-site operators were vigorously rectified, which strengthened the safety awareness of the whole project department staff and ensured the safe and smooth construction.
Second, the inspection focus
In view of the actual situation and construction stage of my project, the key points of my project department's inspection are: the use of labor protection articles, the safety management of girder erection and transportation, the protection of aerial work and border work, the operation status and safety of special equipment such as temporary power consumption on site, bridge erecting machine and gantry crane. In view of the above inspection points, our project department has carried out detailed inspections on key construction sites such as Huilong Tunnel, Yaojiawan Bridge, Baoxia Service Area, 1, 2# Changliang, Xiangyu Railway Overpass Bridge and Damiao Bridge.
Third, the problems existing in the inspection
Huilong tunnel 1
There is insufficient lighting in the tunnel, and some road workers in the tunnel are required to wear reflective clothing.
2. 1
The four gantry crane hooks in the prefabrication yard of Project Department 1 Beam Yard lack anti-falling safety devices, oxygen and acetylene bottles are not classified and placed separately, and the cabinet doors of several distribution boxes on site are not closed in time, and the abandoned items on site are not cleaned up in time, so the civilized construction situation is poor.
3.k34+684~k34+824 sheet pile wall
At the pile foundation construction site in sheet pile wall, some operators did not wear safety helmets, and the orifice operators did not wear safety belts as required. There is no pile hole. 14~ 16 is located at the foot of the slope, and the upper slope on the right side of the line is in danger of collapse at any time, which poses a great safety hazard.
4. Protective scaffolding for bridges across the highway of Hunan-Chongqing Railway
The construction personnel who set up protective scaffolding did not wear safety helmets, and the construction personnel at high places did not wear safety belts.
5. Zhang Jiayuan Bridge
On-site bridge erecting machine lacks hind legs; The bridge erecting machine was not repaired when it stopped working.
Fourth, hidden danger control measures
In view of the above problems, the project department issued a notice of hidden dangers rectification within three days. According to the problems existing in the inspection, the project department will guide and urge all work areas and construction teams to carry out rectification and eliminate hidden dangers in time.
1. Please ask the person in charge of the on-site construction of Huilong Tunnel to strengthen the management of the construction personnel and increase the lighting in the tunnel, so that the lighting in the tunnel can meet the construction requirements.
2. The project department 1 beam yard site gantry crane hook anti-falling safety device is installed in place, oxygen and acetylene are placed in different categories, and a safe distance is ensured. Replace some severely damaged distribution boxes and ensure that all distribution boxes are locked.
3. In the construction site of sheet pile wall, the retaining wall with pile foundation 14 ~ 16 is heightened with reinforced concrete, and the gap between the inner retaining wall and the slope is filled with earth and stone. At the same time, a scaffold construction platform is set on one side of the retaining wall to fix the hoist to provide up-and-down operation for the construction personnel.
4. Protective scaffolding All construction personnel on the construction site have worn safety protection articles as required, and the erection parts have been protected with reflective belts and reflective cones.
5. The front legs are added to the bridge erecting machine of Zhang Jiayuan Bridge, and they are fixed with steel wire rope when stopped.
Verb (abbreviation of verb) Next work plan and measures
Through this inspection, the overall situation of special equipment on site is relatively good, the temporary electricity consumption situation has been well improved, and the awareness of site construction personnel to use protective equipment has been greatly strengthened. Combined with the actual situation, we will focus on the following directions in the future:
1. Raise awareness, strengthen safety education and training for special equipment operators and equipment managers, attach importance to the use and management of special equipment ideologically, and earnestly strengthen the management of special equipment. Strengthen the inspection, repair and maintenance of special equipment.
2. The use and management of temporary power lines and distribution boxes.
3. Strengthen on-site construction safety education and improve the quality of construction personnel.
4. Penalties for breach of contract shall be imposed on the construction teams that have the same problems repeatedly, so as to improve the safety awareness of the construction team managers.
5, the project department will take self-examination and self-correction as daily work, grasp the loopholes in safety production, and promote safety production to a new level.
Summary of Work Safety Month in Construction Industry 2 In order to further promote the investigation and management of hidden dangers in production safety in our town, and effectively strengthen the management of safe and civilized construction of construction projects, according to the requirements of Notice on Carrying out Large-scale Investigation of Hidden Dangers in the County (Kai 'an Ban Zi [20xx] No.42) and Notice on Carrying out Large-scale Investigation of Hidden Dangers in the Town (Ban Long Fa [20xx] No.25), combined with the current situation of construction safety in our town, 20XX From March 10 to April 1 1 day, the village management office set up a special inspection team, and the safety supervision station and the land office went deep into the construction site of the project under construction in the jurisdiction to conduct a major inspection of the safety production on the construction site.
First, check the situation.
The inspection focuses on external scaffolding, formwork, temporary electricity consumption for construction, scaffolding, tic-tac-toe, tower crane, foundation pit support, special operations personnel holding certificates, implementation of safety responsibility system, safety education, safety technical disclosure, and rectification of hidden dangers. Judging from the inspection, the comprehensive evaluation of most projects under construction is "poor". Although most houses have carried out self-examination and self-correction work on the construction site before the major inspection, some safety hazards and civilized construction problems have been rectified in time. However, during the inspection, it is still found that most construction units do not attach importance to safe production and civilized construction. The rectification of hidden dangers of safety accidents and civilized construction problems found on the construction site is not in place.
This inspection randomly selected more than 70 houses under construction, with a construction area of 9,000 square meters. During the inspection, * * * issued more than 70 construction safety commitments, and issued a notice of shutdown and rectification 1 1 copy.
Second, the main problems existing in the inspection
management problem
1, part of the project did not apply for a construction permit, and it was illegally built without authorization.
2, the construction unit of the project management is not in place, relax the management of safe production and civilized construction;
3. Full-time security personnel are under-equipped. The phenomenon that security officers are not in place still exists.
(2) Safety in production
1. The construction enterprise failed to check and accept the scaffolding, construction electricity and load-bearing formwork on the construction site;
2. The scaffolding of some construction houses is not standardized, and what is more serious is to build it at will. The effective parts of the lap joint and the rescue length do not meet the requirements of the specification, the number of Rachel bars, sweeping poles, scissors and scaffolding pieces is seriously insufficient, and the enclosure facilities such as federated eye network are not standardized. The gap between the footstool and the building is large, and the phenomenon of non-isolation protection still exists.
3. The construction unit does not pay enough attention to the management of tower cranes on the construction site, and the phenomenon that tower cranes are put into use without inspection or certificate after inspection is more prominent.
According to this safety inspection, the situation of construction safety production in the whole town is still very grim, the basic work of safety production is still relatively weak, there are many hidden dangers of safety accidents on the construction site, and there are still weak links and outstanding problems in safety production management. In view of the existing problems, the inspection team requires all participating units to attach great importance to early deployment, early arrangement and early implementation. The person in charge of the construction unit should carefully organize and deploy, plug the loopholes and check the dead ends. Take various preventive measures to ensure that the construction site environment meets the standards and eliminate potential safety hazards. If it can be rectified immediately, the construction unit shall be ordered to rectify immediately; If it cannot be rectified immediately, it is required to rectify within a time limit, and the construction site with serious safety hazards shall be ordered to stop construction. The inspection team also asked all villages and residences to strengthen the awareness of safety production management, strengthen the responsibility system for safety production, and strengthen management to ensure the stable development of engineering quality, safety production and civilized construction in our town.
Summary of Work Safety Month in Construction Industry The 3 XXXXX project conscientiously implemented the spirit of the Fire Protection Law and the National Fire Safety Publicity and Education Outline issued by the Ministry of Public Security, and organized and carried out the fire safety publicity month activities in combination with the requirements of the Notice on Launching Fire Safety Publicity Month Activities of Shenyang Airport Phase III Construction [20xx]2 1, so as to make employees know about fire protection, do a good job in fire protection and enhance the fire safety awareness of all staff.
I. Activity time
20XX 165438+ 10/0/to 165438+ 10/0/6; Carry out fire safety publicity activities for 20XX years165438+1October 17 to165438+1October 23rd; Carry out fire safety training and education activities for 20XX years (165438+123 October to165438+/28 October); Carry out fire safety inspection.
Second, organization.
Leader, deputy leader and members of the leading group of fire safety publicity month:
Three. Activity form and work arrangement
(1) Fire Safety Publicity Month Mobilization Meeting.
On June165438+1October 1 1 day, all the staff of the project department held a safety publicity month mobilization meeting in the conference room, which was presided over by the project manager XXX, and the Notice on Launching Fire Safety Publicity Month was distributed to each manager, so as to fully mobilize everyone's enthusiasm and improve the fire safety of all the staff of the project.
(two) to carry out fire safety publicity work.
On the morning of165438+1October 12, the project organized fire safety publicity activities at the construction site and adjacent communities, and hung fire safety in the adjacent communities, such as "fire safety, prevention first, combining prevention with fire fighting", "don't tamper with fire fighting facilities, it is very useful to put out the fire" and "two taboos against fire fighting, carelessness".
165438+1October 13. The project department agreed to purchase the fire safety production manual and distribute it to the workers of all construction teams, so as to strengthen the publicity of fire safety and improve the safety awareness of employees.
On the evening of June165438+1October 14, the project department organized workers to play a fire safety propaganda film for workers in the living quarters, focusing on daily fire safety knowledge and fire escape and self-help knowledge.
(three) to carry out fire safety training and education activities.
165438+1October 18, organize all employees to hold a fire safety education conference. In the safety education meeting, explain the fire hazards existing in the construction site, focusing on the fire hazards in the construction site and adjacent areas, fire prevention and extinguishing measures, the operation and use of fire-fighting facilities and fire-fighting equipment. Especially after entering the winter construction, the fire safety of the construction site is the focus of the project safety management, and the fire safety work in the temporary area is the most important. The fire cases of board houses are listed to warn employees of the fire danger of board houses and improve their awareness of fire safety.
165438+1October 20th, the security department of the project department organized waterproof construction personnel and electric welding workers on the construction site to carry out special fire safety education, strictly implemented the management system of hot work examination and approval, explained matters needing attention in hot work on the construction site, strictly managed hot work, and comprehensively improved the fire safety awareness of all hot work types.
(four) to carry out fire safety inspection.
165438+1October 23rd, organized by the Ministry of Security, led by the project manager, and attended by the project manager and subcontractors. Focus on checking the use of fire, electricity, oil and gas in winter construction, and check the implementation of hot work approval system and fire prevention measures on the construction site; Maintenance and management of electrical equipment and circuits;
Storage and situation of inflammable and explosive dangerous goods, etc. After the inspection, a rectification notice shall be issued to all subcontractors, requiring them to rectify within a time limit.
(five) the effect of fire safety publicity month.
Through the launch of this fire safety publicity month, with the full participation of all project personnel and construction workers, managers pay more attention to fire protection, forming a good form in which everyone cares about fire protection and everyone is responsible for fire protection. Through safety education, watching the warning film of fire safety publicity month activities, special safety inspection, etc. Front-line workers pay more attention to fire protection and cherish their lives, thus achieving the purpose of carrying out this fire safety publicity month.
Summary of Work Safety Month Activities in the Construction Industry 4 In order to thoroughly implement the relevant national laws, regulations and policies on work safety, vigorously publicize the principles and policies on work safety, popularize knowledge on safety precautions, advocate safety culture, create a public opinion atmosphere of caring for life and paying attention to safety, improve the level of work safety in the whole industry, and implement the notice of the state, province, city and county on launching the "Work Safety Month" activities in XX. According to the Notice of the County Construction Bureau on Launching the National Work Safety Month of Taihe County Construction Industry in XX (document Taijianzi [XX] 1 12), from June 1 day to June 30, our Committee will take the publicity and implementation of the Law on Work Safety and the Regulations on the Administration of Work Safety in Construction Projects as the main line, and take "comprehensive"
First, strengthen leadership and make careful arrangements.
In accordance with the notification requirements issued by the Municipal Construction Committee and the county government, the county construction bureau set up a leading group for safety production month activities headed by Director William, and set up a special activity office to comprehensively lead and guide the safety production month activities of the construction industry in our region. According to the actual work safety of Taihe County Construction Committee, the "Safety Production Month" activity plan of the Construction Bureau in XX was formulated, and the "Safety Production Month" activities of this system and this industry were uniformly deployed.
Second, elaborate organization and extensive development.
In the "Safe Production Month" activities, the county construction bureau system and all relevant units in the construction industry closely followed the theme of "comprehensive management to ensure safety", adhered to the principle of "safety first, prevention first and comprehensive management" under the guidance of Scientific Outlook on Development and the concept of safe development, attached great importance to and extensively carried out various publicity and education activities and various series of activities during the "Safe Production Month", and formed superior guidance led by the construction bureau and actively participated by all units in the system and industry.
(a) to organize the publicity and consultation activities of "Safety Production Month"
June 8th, XX is the national publicity and consultation day of "Safe Production Month". On the morning of June 8th, the county construction bureau and the second construction company of the county jointly set up a publicity and consultation desk for safety production in the county grand theatre square to carry out the publicity and consultation activities of "Safety Production Month", and at the same time, the county safety supervision bureau held a signature activity for 10,000 people on safety production. Leaders of the county government, government office and county safety supervision bureau visited the safety publicity and consultation site to guide the work and express condolences to the safety production publicity and consultation personnel. According to the unified deployment of the county construction bureau, all construction enterprises and foreign construction enterprises in the county actively participated, * * * distributed more than a thousand copies of publicity materials and building safety laws and regulations manuals, set up rainbow doors, and hung nine banners across the street. All enterprises hung more than 65,438,000 banners in their offices and construction sites. More than 0/00 billboards/kloc-were made and countless slogans were posted, which formed a strong publicity atmosphere in the construction enterprises and various buildings under construction in the county and promoted the safety awareness of front-line employees.
(two) the organization of production safety inspection.
During the "Safe Production Month" activity, the County Construction Bureau carried out a construction safety inspection in the whole county on the basis of self-inspection by all construction enterprises and combined with the safety inspection in the second quarter. The county * * * inspected 5 construction enterprises and 8 foreign enterprises in the county, and inspected 6 projects under construction/kloc-0, with a construction area of 230,000 square meters, and issued a notice of rectification of safety hazards to the construction sites with safety hazards. Order rectification within a time limit.
From the inspection situation, the work of production safety in various enterprises has improved compared with the first quarter, and the activities of production safety month have been carried out in place, with obvious effect, which has promoted the improvement of the level of production safety in the construction industry in our county, but some problems have also been found, mainly reflected in the following aspects:
1, some enterprise safety managers have poor supervision initiative and strong fear of difficulties, which affects the development of enterprise safety work;
2, enterprise safety production civilized construction measures fee extraction is not in place;
3. The investigation and rectification of hidden dangers of safety accidents has not been effectively carried out and the effect is poor;
4. The site safety protection measures of some projects are not standardized, and the effect is poor, which is far from meeting the requirements of standardization and standardization;
5, some special treatment work on the construction site is not in place, especially the use of tower cranes has not been tested, the bamboo frame material is poor, and the safety net is unqualified;
6, the county enterprises to create a "safe and civilized construction site" activities to carry out ineffective, not active. The site is dirty, messy and poor, especially the office is not separated from the project department, living area and construction area;
(III) Next steps
1, seriously study the new safety laws and regulations such as the Regulations on Work Safety in Anhui Province, and implement the safety laws and regulations;
2. Carry out in-depth special rectification of cranes and other lifting equipment and safety protection articles;
3. Do a good job in standardizing enterprise safety management and on-site safety protection;
4. Strengthen the implementation of the safety acceptance system, and accept the safety start-up conditions and important safety protection of each site. Unqualified acceptance, the lower part of the project shall not be constructed.
5, pays special attention to the safety education and training work and special type of work related certificates.
In short, with the strong support and guidance of the county government and the superior departments, and with the joint efforts of all units in the county's construction system and construction industry, the "Safe Production Month" in Taihe County in 20XX was successfully concluded, achieving the expected results and promoting the development of safe production. County Construction Bureau and enterprises will continue to consolidate development, improve the achievements of construction safety production, work hard on long-term supervision and strengthen the work of construction safety production in the second half of the year. Strengthen management, implement the responsibility system, pay close attention to safe and civilized construction and special treatment on the construction site, do a good job in safety production management according to law, and strive to achieve the annual safety work goal.
Summary of Work Safety Month in Construction Industry 5 According to the relevant notification requirements and guiding ideology of the "Work Safety Month" activity, our project department, based on previous work safety experience and site management, aims at the construction characteristics of this project: promoting and serving scientific development, celebrating the XX anniversary of the founding of New China, and actively promoting the theme of the "Work Safety Month" activity. So far, we have standardized the construction site, standardized the management of the construction site, and carried out the publicity of "Safe Production Month" in strict accordance with the activity plan: solid, effective and meticulous organization, and strengthened the overall construction of the team, which effectively solved the weak links and outstanding problems of safe production, put an end to the occurrence of safety accidents, and ensured that the activities of Safe Production Month achieved the expected purpose. The following are only the specific practices of on-site safety production, civilized construction and safety management of our project department during the activities, as follows:
First, adhere to the policy of "safety first, prevention first" and fully realize the objectives and tasks of "Safety Production Month"
"Safety first, prevention first" is the basic policy of building construction. In order to seriously implement this policy, the project department set up a leading organization for safety production, defined its work responsibilities, set up a leading group for safety production with the project manager as the team leader, and also set up a leading group for civilized construction with the project manager as the team leader, thus establishing the position of the project manager as the first responsible person for safety production and civilized construction. The project department not only created safe working conditions for employees, but also made efforts to improve the working and living environment and sanitary conditions on the construction site, gradually improved and improved the safety education and training mechanism, and integrated the concept of "people-oriented and safe development" into production activities, which stimulated employees' sense of honor and responsibility and further mobilized their labor enthusiasm, initiative and creativity.
Second, focus on the production line, carefully prepare the construction organization design, and implement various safety technical measures.
Facing the production line, highlighting the key points and carefully compiling the construction organization design: the safety technical measures in the construction organization design are the principles that we should abide by in doing a good job in safe construction. We make an activity plan, formulate a system, and strictly follow the system to ensure that all employees 100% participate in the activity, and ensure that every cadre employee participates in a safety activity and receives a safety education. All managers closely focus on hidden danger management, safety publicity and training, emergency drills and other key contents. , organize and carry out various safety activities such as production safety, fire safety, flood control safety, crowded places safety, special equipment safety, construction safety and underground space safety. , to prevent the occurrence of all kinds of accidents, realize the precontrol goal of safe and civilized construction. In order to ensure safe and civilized production and construction, we have formulated the following technical measures for safe production:
1. Carry out three-level safety education for workers entering the site, and strengthen the technical disclosure of special safety production during construction.
2, the construction of electricity in strict accordance with the requirements of the three-phase five-wire system, using cable laying along the wall, grounding wire using yellow-green double-color line, and achieve three-level distribution, secondary protection and one machine, one box, one brake and one leakage protection.
3. Stairs on the construction site should be provided with handrails, and safety nets should be hung on unsafe work sites.
4, transformer room, wooden shed and other fire prevention key parts set up obvious fire signs, and equipped with fire extinguishers.
5. Standardize the operation of mechanical equipment, correctly maintain all mechanical equipment, so that its safety and technical conditions are always in good condition, the performance of protective devices is intact, the operation mode and procedures are correct, and "two guarantees and three guarantees" are implemented in management (personnel, equipment, package use, package management and package maintenance).
6, building facilities, must be qualified rear can be put into use, in use should adhere to the ten accurate ten are not allowed.
7, the construction site set up three full-time security officer, each team leader is a part-time security officer, responsible for the daily supervision and inspection of the site.
Three, take the opportunity of safe production month, establish and improve various rules and regulations, and comprehensively promote the management of safe production.
We took the opportunity of Safety Production Month to establish and improve rules and regulations in strict accordance with the requirements of the state and Beijing Municipality on promoting the "three actions" of safety production, and comprehensively and thoroughly carried out safety production management actions. Since the establishment of the project department, we have started to establish and improve the rules and regulations. All institutions in the project management department have established their work responsibilities, and all departments and offices have formulated corresponding work flow charts, such as safety work flow charts. The project department has established a safety guarantee system. According to the relevant regulations of Beijing, in view of the characteristics of this project, combined with the relevant regulations of the company, it has formulated safety production management measures, temporary electricity consumption management system, civilized construction management standards, civilized construction inspection system, safety production inspection standards, safety production education system, casualty accident reporting system and safety reward and punishment regulations. These standards and systems strive to be detailed, specific and operable from responsibility, authority to implementation process. Formulate the specific contents and requirements of various standards and systems from a high starting point, and organize all employees to study and implement them. The perfection of these systems makes the work of the project department have rules to follow, standardized management, clear responsibilities and rights, and improved the work performance of employees.
Fourth, strengthen the safety education and training for employees, and strive to improve the awareness of safe and civilized construction.
Safety production education and training is an important basic work to realize safety production. According to the policy of "safety first, prevention first", various forms of publicity and education have been carried out, which has made unremitting efforts and sounded the alarm. In order to further consolidate and deepen the activities of Safety Month, we promoted safety education in time and gradually improved the safety training mechanism. First, new employees must participate in three-level safety education and take a written test before they can take up their posts. The second is to pay close attention to on-site safety publicity and education. We use billboards and slogans to do safety work and set up standard warning signs. Third, strengthen professional and technical training and comprehensively improve the technical quality of employees. Enhance employees' safety awareness, lay a solid foundation for achieving safety in production, achieve results in safety production month activities, create a safe and stable social environment, and celebrate the XX anniversary of the founding of New China.
Five, strict safety inspection, carry forward and serve the scientific development.
Since the launch of "Safety Production Month", we have made a planned, scientific and reasonable layout of the limited construction site, which enabled materials to enter the site accurately, timely and orderly, reduced the backlog and secondary handling, and ensured the smooth flow of road transportation and fire exits.
In the process of construction, safety work should adhere to the principle of "five no construction". That is, construction will not be carried out without safety, technology and quality assurance measures; Do not meet the safety conditions shall not be construction; If the protective measures are not fully configured, no construction may be carried out; Without safety education and technical disclosure, construction is not allowed; If the previous procedure is unqualified, the next procedure cannot be constructed. Effectively control the unsafe behavior of people and the unsafe state of things, and form a safety management model with full staff, all-round, whole process and whole process control. According to the provisions in the Technical Code for Safety in Building Construction, combined with the construction progress and the setting of various types of work, the safety technical disclosure of sub-projects at various stages, small and medium-sized machines and tools, general types of work and special types of work was compiled; For some key processes, the corresponding safety schemes are compiled. It ensures the enforceability of safety measures, refines the standards of safety work to all aspects of construction and production, and achieves the best safety state with standardized behaviors and actions. Check and accept various safety facilities with safety standards. In terms of construction safety, we insist on the combination of "self-inspection, mutual inspection and handover inspection". For facilities that are not built according to the standards and fail to meet the standards, stop work immediately for rectification, and return to work only after they are qualified. Punish related violations and potential safety hazards found on site in accordance with the Measures for Rewards and Punishment of Work Safety, fundamentally put an end to all kinds of industrial accidents such as illegal command and illegal operation, nip all kinds of potential safety hazards in the bud, and effectively solve the weak links and outstanding problems of work safety.
Six, strengthen the inspection tour, timely rectification report safety records.
During the activity, we will conduct a safety inspection once a week, issue a rectification notice in time for the problems found, and conduct a review. Continuously put into production safety, monitor major hazard sources 24 hours a day, and report weekly safety inspection records to the resident supervisor in time for the supervision unit to manage. At the end of each month, under the leadership of the deputy project manager, conduct a thorough inspection on the safety production and civilized construction of each construction site, and gradually establish a long-term mechanism for safety production. Through the activities, our unit effectively solved the main problems existing in safety production, and ensured that all kinds of potential safety hazards were significantly reduced and effectively controlled.
;