Fire detection and assessment report
Fire detection and assessment report

According to the fire detection and evaluation report, time has passed inadvertently, and a period of work has ended. Looking back on the work during this period, there are achievements and problems. It's time to write a self-inspection report seriously. Let's share the fire detection and evaluation report.

Fire detection evaluation report 1 fire acceptance evaluation report 1

Fire Brigade of High-tech Zone:

The fire station project in high-tech zone undertaken by our company is undertaken by the Second Engineering Co., Ltd. of China Communications No.1 Navigation Bureau, designed by Qingdao Ocean Architecture Design Institute Co., Ltd. and monitored by the quality and safety supervision station in high-tech zone.

Qingdao Yongda Construction Supervision Co., Ltd. was entrusted to undertake on-site supervision, and the electrical and fire-fighting facilities of the fire-fighting project of this project were tested on February 5, 20xx 65438, and the test results were confirmed to be qualified. On February 3, 20xx 65438+, the project passed the pre-acceptance work of five subjects, completed the quality rectification and closing of related problems, and now has the conditions for completion acceptance.

China Communications No.1 Navigation Bureau No.2 Engineering Co., Ltd.

20xx year x month x day

Fire acceptance assessment report II

First, the basic situation:

Address of this Juyi Mansion Project: It is located next to Dongbo Village 107 National Road, Tang Zhong Town, Dongguan City. It is fully developed by Dongguan Juyi Real Estate Development Co., Ltd., contracted by Zhanjiang No.4 Construction Engineering Co., Ltd. and supervised by Dongguan Construction Supervision Co., Ltd., with a total construction area of 27,607.8 square meters, with the ground floor 1 and the ground floor1.

The project of Benjuyi Building was put on record in the fire brigade of Dongguan Public Security Bureau in April, 20xx.

The fire protection works of this project include: indoor fire hydrant system, automatic sprinkler system and automatic fire alarm system.

Two. Project overview:

The roof of this project is equipped with a fire-fighting supplementary pool, with an effective volume greater than12m3 and an effective supply time of not less than10min.

1. The basement has 1 fire pump room and 1 fire pool with a capacity of 2 10 cubic meter. There are 2 fire hydrant pumps and 2 pressure stabilizing pumps, with a lift of 80m and a flow rate of 15l/s, which is used for the management of the community ring network (1).

2. The first floor is equipped with 1 fire control center, equipped with automatic fire alarm system equipment (including: 1 alarm controller, 1 linkage control cabinet, 1 fire broadcast system, 1 fire communication system, 1 water spray fire control system). )

Three. Construction process.

Our company has established the quality responsibility system for managers of all departments and levels, defined their respective quality responsibilities, and established a perfect project self-inspection system, with clear division of labor and responsibility to people.

Strictly control the construction procedure of the whole project, and conduct strict technical disclosure before each sub-project starts, and conduct inspection and acceptance according to the requirements of technical disclosure and inspection and evaluation standards, so as to achieve tracking synchronization, review all technical projects and pass self-inspection;

Report to the quality supervision station, the construction unit and the supervision unit for parallel acceptance, and then proceed to the next working procedure after meeting the design requirements and acceptance specifications. All kinds of materials used on site are required to meet the requirements of qualification, and unqualified and messy products will be rejected.

Fire acceptance assessment report 3

The fire-fighting reconstruction project of coal conveying system undertaken by our company is reconstructed by limited liability company. City construction engineering quality supervision station is responsible for quality tracking supervision, and entrusts fire engineering supervision co., ltd to undertake on-site supervision. On April 26th, 20xx, the fire-fighting facilities testing unit completed the fire-fighting engineering electrical and fire-fighting facilities testing of this project, and confirmed that the test results were qualified.

Since the project started, with the strong support of superior leaders, quality supervision stations, construction units, design units, supervision units and relevant departments, the project passed the pre-acceptance work on April 24, 20xx, and completed the quality rectification and finishing work of related issues. At present, the fire protection project has been completed and accepted. The specific situation of this project is reported as follows:

I. Overview of the Project:

1. The sprinkler system should be changed from the original wet alarm system to the dry pre-action alarm system.

2. The original coal pipeline fire protection system was changed to dry pre-action alarm system. According to the national 20xx fire code, all pipelines sprayed by the original coal conveying system did not meet the fire code, so all pipelines were re-laid and changed into manual and electric dual-purpose systems.

Second, the engineering function:

1, the fire alarm system of this project adopts the control system of fire control center, which consists of automatic alarm system, fire hydrant system, sprinkler system and other systems. The fire control center is controlled by a centralized alarm controller.

2. The linkage system of this project is centralized control, and the linkage console is located in the fire control center. The linkage function mainly includes: after the fire alarm, turn on the alarm device and start the fire pump and spray pump.

3. Linkage logic and manual function of fire control room: a. Manual button action, fire fighting equipment will be linked immediately. B, fire hydrant button action, immediately start the fire pump and spray pump.

Thanks to the unremitting efforts of our company and the project department and the hard work of all the staff, our construction party has completed all the work according to the design requirements and acceptance specifications, as well as the construction contents agreed in the contract. All equipment has been debugged and operated normally, and all alarm systems have passed the inspection of the testing company.

Construction unit (official seal):

Date:

Fire acceptance evaluation report 4

Changzhi City Fire Bureau:

Our teaching building was completed in 20xx, located at No.21Xinghua Street, Yan 'an South Road, Changzhi City. The building of the teaching building is a basement (semi-basement), with five floors above ground and two halls on both sides, with a total construction area of 4,888 square meters and a total building height of 20 meters. According to the fire protection requirements, the teaching building has been basically equipped with relevant facilities. We now request fire inspection and acceptance of our teaching building. Hereby report!

Changzhi broadcast arts school

20xx year x month x day

Fire detection evaluation report 2 fire safety evaluation self-inspection report 1

According to the spirit of Wu Dabao's Notice on Launching Special Renovation of Spring Fire Safety, the college organized the special renovation of spring fire safety in the whole hospital. On February 28th, the leading group of spring fire safety special rectification, which was composed of college leaders and student affairs office, conducted a comprehensive fire safety inspection of the college.

First, check the key points.

1. This time, it is mainly to check the illegal use of high-power electrical appliances above 100w and to pull the power cord indiscriminately, and to give timely warning and treatment to students who illegally use electric stoves, electric cups, rice cookers, water boilers and pull the power cord indiscriminately.

2. For the normal use of fire fighting equipment such as fire hydrants and fire extinguishers, do a good job in daily maintenance and the addition and replacement of fire fighting equipment.

3. Give a warning to students who smoke in the dormitory and light with candles after lights are turned off. The fire safety committee, logistics and security departments insist on being on duty 24 hours a day (call at any time when necessary).

4. The personnel on duty should check the students' sleep rate at night and the civilized health inspection of the dormitory every day, and take the timely elimination of potential safety hazards as their daily work.

Second, the problems found in the inspection

The results of this inspection are generally satisfactory, and no major safety hazards have been found. However, during the inspection, it was also found that some dormitories did not meet the requirements, and high-power electrical appliances were still used, which criticized the safety responsible person of the problem class, as follows:

1. The bedrooms in the lakeside dormitory are:

Unit 1: 20 1 (personnel management), 305 (international trade 2), 602 (accounting)

Unit 2: 10 1 (Finance)

2. The fast bedrooms used in Sakura Second Room are:

406 (Finance)

3. The five bedrooms with potential safety hazards are:

53 1、6 19、634

4. The bedrooms with potential safety hazards in KINOMOTO SAKURA are:

2 18、2 14、325、326、40 1、406、408、429、430

5. The bedrooms with potential safety hazards in Sakura II are:

208,219,207 (note: 207 is extremely uncooperative with students' work and has a bad attitude)

Three. initiative

1. We reported the results of this inspection within the scope of the college, and conducted a informed criticism on the above dormitory. Seriously criticized and educated relevant students.

2. We held a safety education meeting for student cadres, printed and distributed relevant information on fire safety to the dormitory, and asked each class to hold a class meeting with the theme of fire safety.

3. Strengthen the system of responsible persons for safety, and require responsible persons for safety at all levels to attach great importance to it and make persistent efforts to conduct regular safety inspections.

"Hidden dangers are better than open flames, and responsibilities are heavier than Mount Tai". Fire safety work is a constant and unremitting work. Based on the service tenet of "all for students, all for students, all for students", we will continue to work hard to win the victory of the special rectification work of fire safety in an all-round way.

Self-inspection report on fire safety assessment II

In order to respond to the notice of the County Fire Prevention Committee on fire prevention in winter and implement the requirements of the county supply and marketing cooperatives on self-inspection of fire safety in crowded places,1on the morning of October 28th, 165438+ led by * *, the directors of the office, loss prevention department and operation department conducted self-inspection on fire safety of Mei Jia Life Plaza Corporation. The problems found in the self-inspection and the rectification measures are reported as follows:

First, the goods are piled up in front of the fire hydrant on the west side of the cashier, which poses a safety hazard. The mall is required to immediately arrange personnel to make adjustments to ensure that the passage in front of the fire hydrant is unblocked.

Second, the emergency lighting indicator lamp on the fifth pillar of the north-south main channel is not lit. Ask the office to arrange electrician Zhang to repair on the same day. If the damage can no longer be used, the office is responsible for the purchase and it will be completed within 3 days.

3. The chemical cleaning area, clothing area and non-staple food area * * *, three fire extinguishers, a lead seal on a safety bolt is damaged, and two pressures are not up to standard, so the office is required to purchase again and implement it within 3 days.

4. The indicator light of a safe passage of the fire escape in the fresh food area is not lit, and the office is required to arrange the maintenance of the electrician Master Zhang on the same day. If it can no longer be used, the office is responsible for purchasing and implementing it within 3 days.

5. A fire escape in the west is locked, and it is required to open a shop immediately and arrange a special person to be on duty to ensure the smooth flow of the fire escape.

6. There are two new interns in the decontamination area, and they don't know how to use fire extinguishers. The mall is required to strengthen the fire training for new employees in order to strengthen the fire safety quality of every employee in the store.

Fire detection and evaluation report 3 fire self-inspection report 1

In order to ensure the fire safety and anti-theft safety of the office environment in our center, on March 22-23, according to the arrangement of the leaders of the center, the person in charge of the center led the office and logistics personnel to form a safety inspection team, and conducted a strict inspection on the fire safety and anti-theft work of the office building and the experimental building of the center. The inspection situation is now reported as follows:

I. General situation of safety inspection

The inspection team first inspected the doors and windows, computer room and office equipment on the third and fourth floors of the office building, the power circuit and switch of the canteen on the first floor, the fire safety passage in the corridor, fire-fighting facilities, electricity and water consumption and environmental sanitation.

Then, the cold storage on the first floor, offices on the second to fourth floors, doors and windows, instruments and equipment, office equipment, power lines, fire safety passages in corridors and fire-fighting facilities of the laboratory building were inspected. Through comprehensive and thorough investigation, the inspection team left no dead ends, and the overall inspection results were in good condition, with no major safety hazards.

Second, the existing problems

1, each floor has been equipped with 8 kg and 4 kg dry powder fire extinguishers directly placed on the ground, which is not conducive to the storage and maintenance of fire-fighting equipment.

2. Some office and laboratory power sockets and plug boards are damaged, which has potential safety hazards.

3. sundries are piled up in the computer room, which is messy and has fire safety hazards.

4. There is no security door in the experimental area of the experimental building, and outsiders can enter and exit at will, which is a potential safety hazard.

Third, the rectification measures and suggestions

1. Buy a special box for fire-fighting equipment, install all fire extinguishers, effectively protect fire-fighting equipment and pile it up neatly.

2. Require the logistics department to replace the defective power socket in time, and the office plug-in board shall be replaced by the user to ensure the safety of the electrical appliances (instruments) used.

3. It is forbidden to pile up sundries in the machine room and clean them up immediately to eliminate fire safety hazards and ensure the normal operation of the machine.

4. Install anti-theft safety door at the entrance of the second floor of the experimental building to ensure the property and fire safety of the office and instruments and equipment of the experimental building.

5, adhere to the normalization of fire safety, long-term grasp, it is recommended to set up a central fire safety work leading group, strengthen safety publicity and education, establish and improve safety management rules and regulations, adhere to the monthly supervision and inspection of fire safety work, and investigate potential safety hazards.

In view of the hidden dangers of fire safety and the self-inspection of fire safety found in the inspection, the person in charge of the center pointed out that the hidden dangers of fire safety are related to the life safety of all cadres and workers and the safety of state property. Everyone should fully realize that the responsibility of fire safety is great, and we should not be slack and lucky, ensure that "fire safety does not leave a dead end", eliminate potential safety hazards, and create a stable and safe working and living environment.