Personal work summary of electrical engineer
Personal Work Summary of Electrical Engineer -20xx is a busy year for Chen Guang Shandong Project Department. During this year, the project department, as an engineer in charge of electrical engineering, data receiving and dispatching of departments and site safety management, under the correct leadership of the company and the project manager, strictly managed the related tasks formulated by the company according to the engineering characteristics, with a clear division of labor, responsibilities assigned to people and coordination of employees' work enthusiasm. Constantly sum up the experience and lessons in the work, strive to explore better working methods and measures to deal with various problems, strive to improve work efficiency, and create every qualified project at the lowest cost. I summed up my actual work in the past year.

1 # ~ 3 # building main works

1), actively organize and cooperate with the supervisor and the construction unit to conduct one or two blue prints.the design for the electrical construction drawing of 1 # ~ 3 # building, coordinate with the relevant technical leaders of the design and construction unit, solve the design problems existing in the electrical construction drawing in time, and contact the design institute for technical verification and design changes. In case of quality problems in the construction, actively contact the electrical director of the construction unit, formulate the treatment scheme, and meet the requirements of design drawings and acceptance specifications; And cooperate with the budget department for project progress visa and technical verification.

2) 1-3 # Building should be completed by the end of 20xx 12. Because the foundation treatment of Building No.3 (the soil is hard and the piling work is slow) and the once-in-a-century snowstorm directly affect the progress of the project, Building No.3 was not completed as planned, and the capping of the main project of Building 1-2# has met the acceptance conditions. Time is tight and the workload is heavy. All employees in the engineering department unite to form a joint force, and every minute counts. First, the main project of 1-2 building was capped, and at the same time, various construction schemes were implemented and overtime was worked. Now the main body of Building 3 will be completed, with eight floors above ground. And actively coordinate the relationship between construction units to solve the problems in construction. 1-2# building main project electrical (strong and weak current) pipeline laying and water supply and drainage specialty cooperate with each other, and the main project of 1-2# building is successfully completed, and supervision and construction units are urged to sort out electrical (strong and weak current pipeline laying) installation and construction materials and establish files.

3), in the implementation of the tasks assigned by the company leaders and the engineering department, the residential demolition work was carried out before the 4# building started, and finally the 4# building broke ground. Building 4# has completed the foundation pit excavation and is undergoing foundation treatment (dust removal).

2. Indoor and outdoor decoration works of the sales department:

The construction period is tight, the task is heavy, the construction is relatively complicated, the drawing design is not perfect, and the kindergarten relocation in the early stage of construction makes the construction period even more tense. With the strong support of the company, I give full play to my accumulated management experience for many years and urge the construction unit to make exterior wall decoration renderings. Under the correct leadership of the project manager and the company, I worked overtime and finally completed the indoor and outdoor decoration project of the sales department. Strictly control the quality in the construction process. As a real estate development project, in order to maintain the company's reputation, while ensuring the progress of the project, the quality is strictly controlled and the construction unit manages it synchronously. Organize the heads of the construction unit, sales department, budget department, agency company and other departments to carry out overall quality acceptance on the indoor and outdoor decoration project of the sales department, and carry out the acceptance in strict accordance with the current national acceptance standards, which are qualified and have met the use function. This kind of project management has been recognized by the relevant departments of the company in terms of quality, progress and safety, and has realized the company's business philosophy.

Third, strengthen the sense of responsibility, carry forward the spirit of struggle, and enhance the sense of pioneering and innovation.

Generous, regardless of personal interests, due to the particularity and importance of the work, we must coordinate and safeguard the interests of the company, study possible problems in the construction process, dare to try, integrate new knowledge, new technologies and new ideas into the implementation process, put forward efficient solutions, and conduct uninterrupted research on the technical management of the engineering department.

Four-fold exercise, encourage and tap the potential, and better complete the job.

1), in the period of large-scale rapid development, the company has improved its scale in terms of job responsibilities and business process cost research. In the process of management, on the one hand, we study the rationality, scientificity and safety of the project, on the other hand, we safeguard the core interests of the company. During our work in the engineering department, we successfully completed the tasks and objectives assigned by the leaders of the company and the engineering department, and no major safety and quality accidents occurred during the construction process. The work is proceeding in an orderly way.

Good ideological and political performance

My principle in dealing with people is "study hard, work hard, be an upright person and live a happy life". I am self-disciplined, hardworking, sincere, consistent in words and deeds, faithful in appearance, conscientious, law-abiding, modest and prudent, and have good ideological quality and professional ethics.

The future direction of intransitive verbs

1), be proactive, study hard, keep pace with the times, and constantly improve your business level.

2) Strengthen the improvement of business level, promote the development of standardized management and reduce the construction cost.

3) Due to the particularity of management? We must develop in an all-round way and be a qualified and technically comprehensive manager.

4) Innovative technology management, with equal emphasis on technology and management.

Constantly strengthen theoretical study and expand knowledge.

Concentrate on the development trend in the technical field, absorb rich theoretical knowledge, and improve the ability of solving practical problems in this major. This major works closely with related majors to coordinate and solve related technical problems, and can cooperate with professional engineers and learn from each other. At the same time, it also strengthens the ability of enterprise management, organization and coordination, and judgment and analysis.

In a word, I have made some achievements in my work in 2xx years, leaving no dead ends in management and construction. I believe that under the unified leadership of the company and the engineering department, I will adhere to the unified, standardized and professional management ideas in accordance with the company's management model, give full play to the team spirit, and work together with Qi Xin to basically complete the tasks assigned by the company, and adhere to and improve the unified management system and model in project management. In view of the problems existing in the project, timely adjust and constantly sum up the experience and lessons in the work. The situation is gratifying, but the pressure is also great. I turn pressure into motivation, overcome difficulties, constantly sum up and meet new challenges. Strive to become a qualified employee of Chenguang Real Estate Development Co., Ltd. ..

?

Personal work summary of electrical engineer Time flies, and I have graduated for three years in a blink of an eye. I have worked in xx Company for more than two years. Due to the need of work and improving my technical level, I entered the technical department of xx Power Distribution Equipment Co., Ltd. to study and work. I have worked in xx Company for more than two years and have grown into a qualified electrical engineer.

First, the growth process.

When I first entered the company, I had to practice in the electrical workshop. During the period, I was mainly familiar with the products, laying the foundation for future design. After the internship, I officially entered the technical department.

At first, I was mainly responsible for designing some small orders, such as small boxes, pgl, ggd, and some relatively standard xgn36( 15)- 12. Usually a few, or orders with an output value of no more than 65438+ million. During this time, I studied with the chief engineer and the old engineer, trained professional skills and basic knowledge at night, and then checked the learning results on the order. I was deeply impressed and influenced by my study and work during this period. Some standard engineering instructions, such as star delta step-down start, full pressure start, autotransformer step-down start, motor forward and backward rotation, etc. I learned them all at school, but I was not impressed at that time. After doing these motor control projects, the previous theory and practice are combined to design a control product with its own style. Such as temperature control box, gas control box, street lamp control box, etc. The main problem encountered by this kind of products is the arrangement of components, which directly affects the overall size of boxes or cabinets and the direction of cables. Once you are not careful, users will encounter many problems during installation and use. When making this kind of products, we must be careful, go to the site to communicate with customers, and after understanding customers' intentions, it is best to design the general plan and outline map for customers to confirm.

With the growth of experience, we began to make a relatively large set of gck, usually dozens or hundreds, and the output value usually exceeds 500,000 yuan or even one million yuan. The main functional units are: metering cabinet, incoming cabinet, capacitance compensation cabinet, feeding cabinet, municipal power generation conversion cabinet and contact cabinet. Basically, every two years, the local mainframe metering cabinet puts forward new requirements to Dongguan Power Supply Bureau of Guangdong Power Grid. Usually, within one month of putting forward new requirements, there are the most problems. For example, the former transformers of 3 15kva and above are required to be equipped with two sets of current transformers, one active meter and one electronic meter, and charged with low voltage. At present, a group of current transformers and an active meter must be equipped with a 10kv high-voltage metering cabinet, and the high-voltage charging method is adopted. If we don't pay attention to this problem, the goods will not be connected to the site and will not pass the acceptance. The amount of on-site decoration works is very large, which will bring negative influence to the company. The feeding unit commonly used in gck is drawer cabinet, which is a relatively advanced cabinet type in China. It is usually necessary to pay attention to whether there is a "non-fireproof load" in the load, which must be cut off in case of fire to prevent the accident from expanding. A dc24v fire-fighting shunt coil is usually added to the molded case circuit breaker to realize tripping. Many people interpret it as "not a load that must be protected by fire fighting", which leads to the wrong position of the trip coil and jumps off some fire fighting loads, such as fire fighting fans and pumps. In fact, the fire load cannot be cut off. Once a fire breaks out, it will lead to a more serious fire. It should be understood as "non-fire-fighting load that must be protected".

After that, we began to make the high-voltage cable distribution box dfw- 12, the high-voltage and low-voltage pre-installed power station ybp(m), and then to XCN15 ring network cabinet, kyn28a- 12 central cabinet, as well as more complicated plc and frequency conversion control cabinet, DC screen (gzdw) and signal screen. From simple to complex; From small projects and small batches to large projects and multiple large orders; With the increase of design projects and experience, I can skillfully and reasonably master the design of system schematic diagram and secondary control wiring diagram of various cabinets, including various non-standard motors, fans, fire control boxes, and various dual power supply and multi-power supply three-in-one and five-in-one systems. At the same time, I am very familiar with the structural characteristics of various cabinets. Responsible for the design of Dongguan Baishiwei Real Estate (Yongya Villa), Dongguan Party School, Chang 'an South China Electronics Factory, City College of Dongguan University of Technology, Akzo Nobel Coatings (Dongguan) Co., Ltd., electrical room of Dongguan Guofeng Grain and Oil Center, office building of Dongguan Ecological Park, residential area of Chashan Meiliwan Garden, Dongguan University of Technology, etc. Through the cooperation with Party A and weak current designers, we have a more comprehensive understanding of the design and operation of power system. In recent years, I followed the chief engineer to participate in the analysis of vertical bus terminal arc accident in Zhujiang Brewery, the short-circuit fault analysis of Fenggang Power Supply Company 10kv outdoor cable distribution box, the treatment scheme of nave Sha Pump Factory affected by harmonics, and the noise treatment of large current cabinet in Dongguan Yuyuan Shoes Factory, which deepened my understanding of theoretical knowledge, better combined theory with practice, deepened my impression, updated my understanding of products and broadened my horizons.

Keep pace with the times and keep innovating, so does the power industry. In order to meet the demand of power grid, Dongguan Power Supply Bureau requires customers to adopt user-defined circuit breaker cabinets with quick protection function for single power supply incoming lines of 65438+20XKV non-dedicated lines, so as to avoid distribution network failures caused by customers' electrical equipment failures, reduce losses caused by fault current and greatly improve power supply reliability. For example, when the T-branch line of 10kv overhead distribution line or the end user fails internally, the outgoing switch of the substation will trip because the time limit of incoming switch protection cannot be properly adjusted with that of outgoing switch protection of the substation. If the fault is permanent, the substation reclosing will not succeed, and the local accident within the boundary of medium voltage users will make the whole 10kv distribution line cut off, with disastrous consequences. If the user boundary switch (commonly known as watchdog) is installed at the T-junction or user terminal (responsibility demarcation point), and faults (such as overcurrent, short circuit, single-phase grounding, etc. ) and automatically isolate the fault, which can ensure the normal power consumption of users in non-fault areas.

Second, new product development and process improvement.

In recent years, due to the slow economic growth, the market demand for distribution products has plummeted, and the competition among distribution equipment manufacturers has become increasingly fierce; During this period, the company strictly grasps the product quality, optimizes the design scheme and reduces the cost on the premise of ensuring the quality.

1. By improving the secondary plug-in of the drawer, the phenomenon that the secondary plug-in is cracked and the plug-in is not in place is greatly reduced, and the reliability of electricity consumption is ensured.

2. Put forward requirements for the primary and secondary processes of products, such as unified line number, unified pipe length and unified installation method. , so as to make the wiring of products beautiful and reasonable, ensure the consistency of products, and improve some unreasonable places.

3. The original capacitor cabinet used two discharge lamps in each loop. Since the capacitor now has a discharge resistance, one lamp is used in each loop, thus saving the cost. The manufacturing cost is reduced, the working efficiency is improved, and the waste phenomenon is eliminated.

4. In terms of new products, under the guidance of the general manager and the leadership of the company's senior engineers, the company successfully developed two new products: 10kv vs 1 high voltage vacuum circuit breaker and high voltage sf6 SF6 SF6 load switch, which enhanced the company's competitiveness. At the same time, through the design and improvement of the secondary circuit of the circuit breaker and the design of the inspection cabinet for testing the secondary circuit of the circuit breaker, we have a deeper understanding of the switch itself.

In 5.20xx, under the leadership of general manager Li, a 4000a high-voltage and high-current cabinet was successfully developed, which filled the blank of no production in Dongguan. Only by continuous innovation can we achieve sustainable development. This year, under the leadership of general manager Zhang, Zhang, Wang Gong, the company independently innovated and successfully developed xfw 1 frame circuit breaker and xfm 1 molded case circuit breaker. At present, these two products are in the experimental stage. I believe that in the near future, Xiong Feng brand will occupy a certain market in the field of switches in China.

Third, the standardization of working procedures.

Standardization of working procedures can reduce the chance of human error and ensure the accuracy of drawings. As the core department of the company and the designer as the project leader, the technical department assists the sales department to make the electrical schematic diagram and cabinet panel layout for customers, which improves the accuracy of quotation, avoids inconsistency with customer requirements and reduces the error rate; For the production department, strive to make all designers' painting styles and design ideas unified and standardized; At the same time, after the drawings were issued, technicians tracked and communicated with workers all the way from sheet metal, welding, powder spraying and assembly to secondary wiring of complete electrical installation, and listened to their valuable opinions to make the products more perfect.

With the care of company leaders and the support and help of colleagues, I have acquired certain technical working ability and can basically work independently, but there are still some shortcomings. In the future work, I will continue to recharge my batteries and learn from experienced colleagues, peers and workshop operators the skills or skills that I don't really have, and apply what I have learned. Through study and practice, I exercise and grow in practical work, accumulate work experience, strive to improve my own quality and professional and technical level, and deliver positive energy for the company's development and growth.

The summary of the personal work of the electrical engineer has passed by in three hours, and he has been working in the company for almost a year in a blink of an eye. Feel a lot and gain a lot. Entering Country Garden Real Estate Development Company is a good development opportunity for me, and it is also a good opportunity to exercise and improve my various abilities. "Standardize management, operate in an orderly manner, perform their duties, be conscientious, strive for first-class, work happily and feel at home" is my personal experience over the past year. Here, first of all, I would like to thank the company leaders and colleagues for their strong support, care and help, so that I can quickly adapt to the company's management and operation process and strive to do my job well. Since I entered the company, I have carefully understood the general situation of the company's development, studied the company's rules and regulations, and become familiar with the company's operating procedures. At the same time, I really felt the positive and inspiring corporate culture, which benefited me a lot. I will summarize my work this year as follows:

One year's work performance (in chronological order)

1. Participate in the design of PWS-

Together with the wool worker, I have a deeper understanding of the working principle of hydraulic chuck and gas-liquid booster pump, and I have learned a lot from the wool worker. For example, the rigor and seriousness of the design, this product has been shipped.

2. Design and debugging of motorcycle testing machine for export

The trip was successful, difficult and unforgettable. The three of us, without an interpreter, overcame the difficulties of local hot weather and unsuitable diet, and completed the debugging of four equipments in less than three weeks, and got the acceptance summary from users, which is worthy of recognition. However, I feel a little sorry. Because it is the first time to export vehicle products, the lack of experience, poor anti-rust packaging and equipment failure have reduced people's satisfaction with us. If we pay attention to these details and use our products to open the door to countries where the industry has just started, then I believe we will benefit from them.

3. Supervision design PWS-J20B 1

This testing machine has been submitted for inspection, and all indicators have reached the requirements of the technical agreement. It will be delivered when the user's money arrives.

2. Participated in the design of PNW-B5000.

I participated in the design of this product under the guidance of the lathe operator. At present, the drawings have been designed, waiting for the user to review the drawings before drawing. I feel very lucky. I have worked with lathe workers, wool workers and shell workers to design products. They are all dynamic authoritative figures with high professional quality and good personality. They let me have a more comprehensive understanding of dynamic products in a short time.

3. Participated in the design of PNW-6000

At present, it is in the tense drawing design stage.

4. I visited the driving axle test-bed with the wool worker. The drive axle test-bed is still blank in our company. I followed Mao Gong to Beijing and Jinan Heavy Duty Truck for investigation and got a lot of information. At present, wool workers are talking with customers about technical problems.

5. Participate in the design of PWS-250C.

Co-designed with woolen workers, has passed the user's pre-acceptance.

6. As the technical project leader, design NW-DYB200.

This project is a new product, completely new design, short design time and great difficulty, which is a severe test for me. Zuo Gong is very strict with me. Looking for information about MTS and other products for my reference gave me great autonomy. After hard work, I finally finished the design task. At present, the mechanical part of the product has been installed, waiting for the controller to debug.

7. Develop technical solutions and provide technical support for the sales department.

8. Participate in the design of QPNS-200H7 and QPSB-200.

These two products are also new products with complicated structures. At first, I was appointed as the project leader. But in the process of design, I obviously felt my lack of ability. In addition, during the critical period of the project, there was an emergency at home. I asked for leave for nearly three weeks, which delayed the design time. I am deeply sorry and grateful to Zuo Gong for taking on a lot of work that should have been done by me. These two million products are a good exercise for me, which makes me realize my own shortcomings. At the same time, I also want to thank Zuo Gong for teaching me a lot, because these two products have matured a lot.

Second, improve the work style.

After more than three years of work, I have completed the complete transformation from school to society, abandoned those unrealistic ideas and devoted myself to my work. As my work became more and more handy, I began to think about how to make new achievements in my work in order to realize my own value. I have always been very active and don't want to fall behind. I keep telling myself: I must do everything well and go all out. Through the fear of these years, I deeply realize that carefulness and preciseness are the qualities that designers should possess, and proficiency, similarity and innovation are the key factors to determine whether designers are mediocre or excellent. I want to broaden my design ideas more and more, I want to enjoy design, and I want to make a difference in the mechanical field. Going all out to do things, rigorous and meticulous work attitude, should be the biggest gain in my work style in 2008.

Third, what has not been done enough

Looking back on the past year, I also left some regrets, which I need to take as a warning. For example, lack of courage to take responsibility independently. I like to find someone else to solve problems, but I can't make decisive decisions. When Zuo Gong was ill, the whole project fell on my shoulders. At first, I felt that the task was too heavy and I had no confidence in myself. Later, I took over and solved one problem after another, only to find that things were not as complicated as I thought, and I lacked the courage to take responsibility independently. Also, my language skills need to be strengthened. Maybe it's because of my personality. I don't like talking about it I just like working hard. Now it seems that this is not enough. I need to face customers and communicate with others.

Fourth, the annual learning results

In 2000, I studied ANSYS, COSMOS, PRE and other software, bought books and further studied SOLIDWORKS, mastered the new tools of current mechanical design, broadened the design ideas and improved the design ability. In 2000, I only had a preliminary understanding of finite element analysis. In 2006, I taught myself COSMOS finite element analysis software. After many exercises and comparing with the finite element analysis of professionals, I finally mastered this finite element analysis tool. Now, I am full of confidence in finite element analysis. In addition, I have made a leap in finite element analysis software. I thought about learning ANSYS, a more professional and widely used finite element analysis software, but I haven't studied it well because of its difficulty. After all, this is an elective course for masters or even doctors. Later, Teacher Deng asked me to study ANSYS and train technicians. With this as the driving force, after more than a month of hard training, I have basically mastered ANSYS, and now I can use it for simple finite element analysis, which is a leap for myself. At the same time, I also taught myself three-dimensional software such as PROE. Although SOLIDWORKS is enough in the current work, PROE is the authoritative software on machinery after all, so I studied it. The purpose of learning is to apply. In the future work, I will seriously consider making full use of the new technology I have learned to make the design better. For example, use three-dimensional software to make renderings, do motion simulation, do finite element analysis and so on.

The above is a summary of my work for one year. In the future work, I will strive to adhere to the life purpose of "being pragmatic, being sincere-oriented, being down-to-earth, being diligent and eager to learn, being kind to others and treating each other sincerely", learn with an open mind, constantly improve my professional level and comprehensive quality, work hard and do my best for the development of the company!