The following are two plans for returning to work after the Spring Festival, which are quite different in content and structure. Welcome to reading.

Plan for Returning to Work after the Spring Festival (Simplified Edition)

First, we should attach great importance to the safety management of post-holiday construction and always adhere to it? Safety first, prevention first and comprehensive treatment? Policy, resolutely overcome the loose paralysis and blind optimism, further implement the responsibility of production safety at all levels and positions, plan and formulate safety work objectives and related work plans as soon as possible, and strengthen safety production management.

Second, pay attention to and do a good job in the safety education and training of construction personnel before returning to work after the holiday. New workers must go through three levels of education and are not allowed to take up their posts without education. In view of the large number of migrant workers entering the construction site after the Spring Festival, the age and health status of the workers entering the construction site after the Spring Festival were investigated in detail. Those who are sick or older and unsuitable for construction should be transferred from their posts or persuaded to leave in time. For workers who may be lax in thinking, inattentive and careless after the holiday, safety education and technical disclosure should be carried out in a targeted manner, especially to strengthen the induction or post-transfer training for new workers and post-transfer workers, to ensure that all kinds of construction personnel know the hazards existing in their construction areas according to regulations, and to enhance employees' awareness of self-protection and prevention. Safety production education must pay attention to practical results, pay attention to practical results, and make relevant education and training records. After the Spring Festival, in view of the large number of new workers entering the site and the long-term suspension of equipment and facilities, all units should provide safety education to employees before returning to work after the holiday, especially for new workers? Level three? Safety education? Ping an card? Training, etc., to improve the safety awareness and safety skills of employees;

3. Before returning to work after the holiday, the person in charge of enterprise safety shall, together with the construction and supervision units, conduct a comprehensive and detailed inspection of all kinds of safety protection facilities and machinery and equipment on the construction site to eliminate hidden dangers. Safety inspection must be pragmatic, not a mere formality, not going through the motions, and not letting go of any details. Inspection points:

First, the safety status and operation of metal structure connections, safety protection devices and electrical circuits of tower cranes, construction elevators, attached lifting scaffolding and other construction machinery and equipment;

The second is the pit wall support and drainage measures of deep foundation pit engineering, the deformation of soil around the pit and the surrounding environment and buildings (structures);

Third, sub-project management with greater risks;

Fourth, whether the temporary power cord is soaked, aged and leaked;

Fifth, the connection parts and stability of scaffolding, electric protective frame and formwork support system;

Sixth, whether the fire prevention, anti-freezing and anti-skid measures are in place, whether the heating equipment in the dormitory has measures to prevent carbon monoxide poisoning, and whether the temporary structure is stable. Especially for tower cranes, construction lifts, attached lifting scaffolding, deep foundation pits and other partial projects with strong professional skills and difficult to find potential safety hazards, professional and technical personnel or testing personnel should be entrusted to inspect and make rectification according to the requirements put forward.

After the review meets the requirements, the general supervision engineer shall issue a notice of resumption of work before resuming work. If the project is not accepted or unqualified, the construction shall be suspended. Individual projects are ordered to make rectification within a time limit before the festival because of serious security risks. They must first organize forces to make rectification, and can only resume work after being checked by the enterprise safety management department and on-site supervision and acceptance, and reported to the quality supervision station for verification.

Fourth, we should attach importance to and do a good job in the management of doormen. In view of the frequent entry and exit of personnel after the holiday, it is necessary to strengthen the management of on-site doormen, establish account records of personnel entry and exit, prevent suspicious personnel and suspicious vehicles from entering the scene, and prevent the occurrence of public security and other cases.

Plan for Returning to Work after the Spring Festival (Detailed Edition)

In order to strengthen the management of production safety on the construction site, ensure the safe construction on the construction site, and eliminate all kinds of potential safety hazards, the inspection plan for resumption of work is specially formulated. According to the inspection plan for resumption of work, the project will be comprehensively inspected before the resumption of work.

The second phase of affordable housing and low-rent housing in the east of Pingluo County is located on the east side of Donghuan Road and the north side of the extension line of Tuanjie East Road. The structure is a six-story brick-concrete structure with a building area of 43,574.22 ㎡.

First, check the content.

1. Carry out inspection of safety production conditions for post-holiday work;

2. Strengthen the inspection of key links and parts;

3. Actively carry out safety education and training activities;

4. Conduct a comprehensive and in-depth inspection of the construction site: check the implementation of civilized construction, construction electricity, safety protection, scaffolding, templates, lifting equipment, construction machines and tools and labor protection on the construction site.

Second, the work objectives

The inspection requirements are comprehensive, in-depth and meticulous. It is necessary to improve the safety production guarantee measures, strictly follow the technical regulations and standards for construction safety production, thoroughly investigate and manage hidden dangers of accidents, solve problems existing in safety management, and effectively prevent and resolutely curb accidents.

Third, the job requirements

1. Raise awareness and organize carefully.

It is necessary to fully understand that the inspection of returning to work is the basic premise and powerful guarantee for safe production. The project department should combine its own production characteristics and safety production conditions, carefully organize and formulate specific implementation plans, define work objectives, and do the work thoroughly.

2. Strengthen leadership and implement responsibilities.

To improve the awareness of safety in production when returning to work, always insist on it? Safety first, prevention first and comprehensive treatment? Policy, resolutely overcome blind optimism, paralysis and lax thinking, and earnestly strengthen the post-holiday safety production work. Project management personnel should be in place in time, and make all preparations before the construction site resumes work: ensure that someone is responsible for safety work, safety measures are in place, and safety inspection is comprehensive and meticulous. The project manager is the first person in charge of the project, so he should give full play to his enthusiasm and initiative, improve the rules and regulations, formulate measures, and put the responsibility for production safety in place.

3. The project department is responsible for this inspection.

The project department should check the situation of returning to work after the holiday, leaving no dead ends and no future trouble for rectification; Intensify work, check records, file hidden dangers, take measures to rectify and resolutely curb the occurrence of construction safety accidents.

4. Strengthen safety training and safety education before returning to work.

First, seriously implement the three-level safety education. Before returning to work, all on-site personnel should be organized to focus on safety knowledge education and training, emphasize safety precautions after returning to work, and strive to improve employees' awareness of self-protection. In particular, migrant workers who enter the field and transfer jobs after the holiday must receive pre-job operation safety training. Those who have not been trained and failed in the three-level safety education shall not work at their posts.

The second is to strengthen safety technical disclosure and safety education and training. Before the construction of a building project, the project management technicians of the construction unit shall make a detailed disclosure of the technical requirements for safe construction to the construction team and operators, which shall be signed by both parties for confirmation.

Third, strictly implement the system of holding certificates for operators of special types of work. Those who have no special operation certificate or expired operation certificate are not allowed to work at their posts, which effectively reduces potential safety hazards from the source and ensures the smooth development of post-holiday safety production.

5. Formulate the inspection plan for returning to work and implement the main responsibilities of all parties.

According to the characteristics of the construction project and the construction progress, make a detailed inspection plan for returning to work, and the person in charge of the construction unit and the manager of the project department should personally arrange and inspect it. Strengthen the safety inspection before returning to work. Check carefully and avoid going through the motions. Rectification measures, responsibilities, funds, time limits and plans shall be formulated for potential safety hazards found during inspection? Five people in position. , effectively eliminating potential safety hazards.

6. Strengthen the inspection of key parts and key links of projects under construction.

First, strengthen the safety inspection of tower cranes and other construction hoisting machinery and equipment. Conduct a comprehensive inspection of all kinds of mechanical equipment on site, do a good job in maintenance, maintenance and trial operation, and ensure safety before putting into use.

The second is to strengthen the preparation system of special programs and the implementation of safety technical disclosure system for some risky projects.

The third is to strengthen the fire safety inspection on the construction site. Focus on checking whether the safety measures in the carpentry production site, welding and cutting site, wood yard and inflammable and explosive goods warehouse are in place, and rectify them immediately if they do not meet the fire safety requirements and have potential safety hazards.

The fourth is to strengthen the safety inspection of construction electricity. Check all accessories and distribution lines in the on-site distribution box one by one, and replace them in time if there is any damage or fault. Fifth, in view of the influence of the early rainy days, the border protection, temporary buildings, protective sheds, fences, etc. were comprehensively inspected one by one to eliminate the safety hazards on the construction site in time.

Four. Work development

The construction unit, the supervision unit and the construction unit shall form an inspection team to inspect the construction site of this project. During the inspection, the project department is required to issue the Hidden Danger Rectification Notice for rectification within a time limit, and all hidden dangers have been rectified and rechecked.

Electricity consumption: The Project Department conducts a comprehensive inspection of the construction electricity consumption according to the requirements of the three-phase five-wire system, and the temporary electricity consumption administrator and security personnel of the Project Department conduct a thorough investigation of the living quarters, construction sites and dormitories of the Project Department one by one, and promptly correct the random connection that does not meet the requirements of regular electricity consumption. Check whether the locks of the power switch and control box are effective, and there should be a special person in charge at the scene.

Mechanical aspect: check that the mechanical safety devices of tower crane, steel bar factory and carpentry room used in the construction site meet the use requirements, the tower crane has reliable limit, the steel wire rope and hook are not damaged and deformed, and do a good job of trial operation before formal use. All kinds of small machinery and hand-held electric devices have good insulation and no leakage.

On-site safety protection: check the safety of fasteners, scaffolding boards and fasteners for scaffolding on site in detail, ensure that the safety net and dense mesh safety net in enclosure measures are complete without blind spots, and clean up sundries in time. Anti-falling measures are effective for checking heights.

Fire fighting: check all fire fighting equipment, replace expired fire fighting equipment, and check fire hydrants, hoses, fire racks and fire boxes one by one.

Construction site: check whether water, electricity, roads and drainage are unblocked. Through the efforts of all parties, the preparatory work is completed as follows:

1, the seasonal temperature has met the construction requirements, which can ensure the construction quality;

2. The safe and civilized construction has been rectified;

3, engineering data, scheme and other documents are complete;

4. All on-site mechanical equipment has been put in place and maintained.

Personnel: Re-educate new workers on safety, re-disclose the safety of construction projects after the year, show certificates for special types of work, and check whether the personal safety protection articles of construction personnel are complete and effective.

My project department will check the following points on site:

A, mechanical safety and site environmental protection:

1. The green net coverage on the construction site is not comprehensive, and it should be rectified in time.

Second, the temporary electricity:

1. Is the temporary power cord normal? Four ones? , equipped with qualified.

2. The auxiliary box on site was not locked separately, and it has been rectified.

Third, security:

1. Some green nets were blown open by the wind and closed in time if they failed to recover in time.

2. The limb hole protection is in place.

Fourth, fire protection:

1. Some fire extinguishers in the construction site have failed and have been replaced.

2. Individual fire hose insulation measures are not in place, have been insulated and passed the examination.

3. The construction water pipeline individual frost crack, timely rectification.

Verb (abbreviation for verb) entrance education:

Educate new workers and keep education records. The education rate is 100%.

All safety project inspection shall be organized by the safety department of the project department, and an inspection team shall be set up, and relevant personnel of each labor service unit shall cooperate with the implementation.

Site safety condition is good: the general contractor has carefully inspected, improved and rectified the safety condition of each construction site. Tower crane, welding machine, mixer and other main machinery have been debugged and run well. Check the stability of scaffolding foundation and attached wall Rachel one by one; The safety net has been repaired or replaced; The temporary wire box is intact and completely grounded; The entrance and boundary protection have also been strengthened.

Conditions for on-site resumption of work have been met: the on-site garbage has been cleared, the construction passage has been arranged smoothly, the water and electricity have been connected in place, the materials have been fully prepared, the machines and tools are in good condition, and the accommodation and meals for the construction personnel have been properly arranged.

Carry out total quality management activities: do every process? Sample guide? Do it? Planning in advance, controlling in the process, and ensuring afterwards? , to ensure that every process is of high quality, is a fine product, with the process quality casting high-quality projects.

Further strengthen safety management, resolutely put an end to major casualties and fire accidents, and strive to build this site into a civilized construction site in Pingluo County.

Make a scientific and reasonable construction progress plan, ensure that there are enough manpower, material resources and equipment, create conditions for organizing cross-operation in process arrangement, grasp the main nodes, and work overtime to complete the task with good quality and quantity.

Verb (abbreviation for verb) Site management and employees are in place.

1. The management personnel of the project department of this project have all arrived at their posts.

At present, the main body of this project is mainly constructed, and the construction personnel have basically met the needs of the project construction at this stage.

2, safety education, system inspection

After inspection, the safety inspection system has been established and the safety account has been collected. The emergency plan is complete, the operation procedures are in good condition, and the inspection records of mechanical equipment, temporary electricity consumption and fire fighting equipment are complete. Special operators involved in various processes and mechanical operations are all certified and assessed according to regulations.

On March 20th, our project department conducted three-level safety education and training and safety technical disclosure for new recruits after the year, and signed a safety responsibility letter with the team leader. After the holiday, the statistics of new special operations personnel have basically ended, and the declaration procedures for special operations personnel are being handled.

3, production safety situation

On March 19, the project department inspected the safety production of the construction site and dormitory, and the situation was good.

The project department re-erected some temporary power lines dismantled before the Spring Festival, inspected the third-level distribution box and the second-level leakage protection switch, and dismantled some wires that were randomly connected and pulled. The temporary electricity consumption on site shall conform to the temporary electricity consumption regulations. During the centralized inspection of temporary electricity consumption in the dormitory, no illegal electric equipment such as electric blanket, water heater and electric frying pan was found, and the electricity consumption in the dormitory met the electricity consumption regulations.

The project department replaced the fire extinguisher with insufficient air pressure found in the inspection of fire fighting equipment, and reconfigured the on-site fire extinguisher, which basically met the requirements of construction fire fighting.

4, civilized construction situation

The project department has set up a full-time civilized construction team, which is responsible for the daily cleaning of the site enclosure and the repair and replacement of the damaged enclosure.

5, construction machinery and equipment operation

At present, there are 7 tower cranes and 3 log saws in the construction site, which were put into trial operation by the project department on March 15, and all systems work normally.