Current location - Education and Training Encyclopedia - Education and training - Excavator driver training fee
Excavator driver training fee
Excavator driver training fees are as follows:

The tuition fee for learning excavators is about 5000-8000 yuan, and the cost of training schools is similar, which is more open and transparent. From the beginning of admission, the school will only charge tuition fees, and generally will not charge any fees afterwards. Of course, living expenses are generally paid by yourself. As for tuition fees, there are some differences according to the consumption level in different regions.

In some schools, the fees they charge may be lower than this average price, but after students enter school, schools may charge extra fees for various reasons. These fees and tuition fees add up to almost the same amount. Some schools are not very formal. The tuition they charge is very cheap, but the study time is very short.

Generally, only one or two months, or very little computer time every day, students can't find a job after graduating from this school. So if you want to study in a training school, you must go to the school in person to find out clearly before you register, such as how much time you have on the computer, whether the school will arrange work after graduation and so on. Don't give money indiscriminately.

Matters needing attention in learning excavators:

1, operation technology must first confirm the surrounding conditions. When rotating, pay attention to the surrounding obstacles and terrain and operate safely; When working, it is necessary to confirm the front and rear direction of the crawler to avoid overturning or bumping.

Try not to face the final drive in the direction of excavation, otherwise it is easy to damage the walking motor or hose; When working, it is necessary to increase the complete contact between the left and right tracks and the ground to improve the dynamic stability of the whole machine.

2. Effective excavation method When the bucket cylinder and the connecting rod and the bucket cylinder and the bucket arm form 90 degrees, the excavation force is large; When the bucket teeth keep an angle of 30 degrees with the ground, the excavation force is good, that is, the soil cutting resistance is small; When digging with a stick, the angle range of the stick should be increased from 45 degrees in front to 30 degrees in the back. Using boom and bucket at the same time can improve excavation efficiency.