How to do the budget of hydropower project?
1, channel reconstruction price budget:
A.20PP-R water supply pipe: 60 yuan /m b.20PP-R water supply pipe: 45 yuan /m C. Launching installation: 60 yuan /m PS:PP-R pipe is Wei Xing or Jinde pipe.
The launching pipe is a plastic pipe: 1, and each meter contains an equal-diameter reducer sleeve and a 90-degree elbow. 2, excluding valve hardware 3, 25 water pipes per meter plus 10 yuan 4 less than one meter is calculated as one meter 5, punching will be charged, bearing wall 40 yuan/a, non-bearing wall 20 yuan/a 6PP-R pipes are all hot water pipes with a skin thickness of 2.8. 7 sewer pipes shall be calculated as 50, and those greater than 50 shall be negotiated separately.
2. List of hydropower installation materials for waterway reconstruction
Quotation for waterway reconstruction construction:
Dark pipe PP-RDNS2.820mm38 yuan/linear meter.
Open pipe PP-RDNS2.820mm28 yuan/linear meter.
Dark pipe PP-RDNS3.525mm55 yuan/linear meter
Open pipe PP-RDNS3.525mm46 yuan/linear meter.
50 yuan/hole of load-bearing wall through-wall hole
Non-load-bearing wall through-wall hole 20 yuan/hole
Water meter 200 yuan/only
Valve DN2590 yuan 1
Valve DN2070 yuan 1
3, high-voltage installation price budget
No more than 3 wires shall be connected in the flame-retardant electrical pipe, and 5 yuan shall be added for every meter of more than 3 wires. There is no connector for the wires in the pipe, and the junction box is used. Type 86 switch socket box 10 yuan/piece; 1 18 type 15 yuan/piece, 4 m2 conductor per meter plus 10 yuan. Multiple pipes in the same tank are charged according to multiple hidden lines. Remove the groove, bury the pipe, and fill it with gypsum or cement mortar.
Covered pipe: 35 yuan/meter
Ming Guan: 25 yuan/meter
Material: PVC wire thickened cold bending pipe, electric wire.
Project unit price
Underground pipeline 2.5 mm 232 yuan/m
monotube
Decorative open wire 2.5mm222 Yuan/m
monotube
Open pipe 2.5mm2 18 yuan /m
Mounting cassette 86
86 10 yuan/piece
Install the light box 86
865 yuan/piece
Through-the-wall bearing wall 40 yuan/non-bearing wall 15 yuan/.
Box Black Box 200 yuan/surface mount 100 Yuan/piece.
Matters needing attention in water and electricity installation budget:
First, look at the drawings carefully, and don't miss items when budgeting. This is a big problem for beginners and novices.
Second, the actual consumption of main materials and bill of quantities are two different concepts, which should be distinguished.
Third, the quota should be applied accurately and cannot be applied to other projects.
Fourth, the price of the main material should be clear.
5. Pay attention to the setting of project category, management fee and profit when using the software.
How to register for the teacher qualification examination in official website?
Or search the primary and secondary school